That the Head of Development Services be delegated authority to approve the application, subject to: a. No objection from Network Rail; b. The conditions as set out in the report 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
11 November 2024
Application No: HPK/2024/0289 Location Buxton Football Club, Silverlands, Buxton Proposal Erection of replacement stand Applicant [name removed] John Scott, JRS Planning Parish/ward Buxton Central Date registered 8th July 2024 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]
1. SUMMARY OF RECOMMENDATION
Delegated authority to Approve with Conditions
1. REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee owing to the application amounting to Major Development, and considerable public interest in the application.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application relates to a small area of land within the confines of Silverlands, occupied by Buxton Football Club; a semi-professional club with attendances ranging between approximately 400 and 2,000 depending on the opposition, and which currently play in the National League North (the 6th Tier in the English football pyramid). The existing maximum capacity of the ground is stated as being 4000.
2.2Due to the competitive nature of this league and that Buxton are one of the smaller teams within it, with regards to attendances and budgets, the club are seeking opportunities to secure alternative revenue streams and ultimately the medium to long term sustainability of the club.
2.3The long term ambition for the club is to reach the National League (5 th Tier in English Football). The step up to this level will bring with it the need to conform to Football Association (FA) regulations with regards to spectator facilities. As such, the Club are looking to plan for the future now, rather than need to address this issue as and when they are promoted to the higher league.
1 2.4 The Silverlands stadium is made up of a recently installed 4G pitch, rented out to community groups and members of the public on non match days, spectator stands on all four sides of the playing surface, floodlights, and a range of ancillary buildings and portacabins that function as hospitality amenities for fans and associates of the club, and educational facilities, as approved under HPK/2017/0260.
2.5The area of land subject to this application within the wider confines of the Silverlands Stadium is the Main Stand and adjacent ancillary buildings and Portacabins (Directors Box, Sponsors Box, Shop and Kitchen), are contained within a high boundary wall constructed from a split faced stone, interspersed by occasional metal sheeting near to the players entrance and directors entrance. This wall runs parallel to the public highway, with the Police Station and associated car park opposite.
2.6The existing Main Stand has the capacity for 500, with all other capacity in the ground being standing and is characterised by metal cladding at each side that supports a mono-pitched roof that reaches a maximum height of approximately 8 metres from ground floor level.
2.7The boundary wall that encloses the northern boundary of the ground reaches a height of some 6.2m, which reduces to approximately 3.6m and ends at the point at which the entrance turnstiles to the ground are located in the north-western corner of the ground.
2.8Members will recall a recent planning application HPK/2022/0250 which was approved in line with Officer recommendation for the following development:
“Extension to form sponsors and supporters lounges and extend the size of the shop and canteen following demolition of portable cabins, canteen and part directors lounge.”
2.9The above application approved development which would be situated adjacent to the Main Stand and Silverlands, with the approved extensions reaching a similar height to that of the existing Stand.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.