That the Head of Development Services be delegated authority to approve subject to no objection from Derbyshire Wildlife Trust and the conditions as set out in the report, and to include if required: a. conditions recommended by Derbyshire Wildlife Trust b. the inclusion of green living wall acoustic barriers as part of the landscape condition to minimise the effect of the development 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date: 28th April 2025
Application HPK/2024/0467 No: Location LAND WEST OF BUXTON ROAD , DOVE HOLES , DERBYSHIRE Proposal BATTERY ENERGY STORAGE SYSTEM AND ASSOCIATED WORKS Applicant Grenergy Renewables UK Ltd Agent Rebecca Little, Pegasus Planning Group Ltd Parish/ward Wormhill and Green Date registered 11th November Fairfield/ 2024 Limestone Peak Ward If you have a question about this report please contact: Declan Cleary - [email removed]
REFERRAL
This application has been brought before the Development Control Committee as the scheme relates to major development.
1. SUMMARY OF RECOMMENDATION
Delegated Authority to APPROVE subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site lies within an Area of Countryside as defined by the Local Plan policies map. The site relates to a parcel of agricultural land measuring 1.5ha in area. The site is generally rectilinear in shape. With the exception of low voltage power lines crossing the site, the land is free from operational development.
2.2The site is adjoined to the east by the A6. Beyond the northern boundary is a small woodland. To the west is a storage business, beyond which is a railway line. To the south of the site is access to the storage business along with landscaping. A field gate provides access to the site which, in turn, is accessed via a hard surfaced from the A6 which serves the adjacent use.
2.3The site does not lie within any landscape designation, although the Peak District National Park is located approximately 1.1km to the west.
1 There are no designated heritage assets located on, or immediately adjacent to the site. However, the route of a Roman Road is known to cross the site. The site lies within Flood Zone 1 and is not affected by other sources of flooding. The site lies within the catchment of the River Wye which forms the Peak District Dales Special Area of Conservation (SAC).
2.4The site lies approximately 700m to the south of the defined settlement boundary for Dove Holes, 900m to the west of Peak Dale, and 2km to the north of Buxton.
3. DESCRIPTION OF THE PROPOSAL
3.1This is a full planning application which seeks consent for the construction of a battery energy storage system (BESS), with associated works.
3.2The scheme proposes a facility which would include the following installations:
8 x battery containers (each approx 6m (l) x 2.4m (w) x 2.6m (h)); 4 x “power stations” containing the inverter and transformers (each approx 11.8m (l) x 2.6m (w) x 2.6m (h)); 1 x Switchgear building (approx 13m (l) x 7m (w) x 4.6m (h) – measurements include external platform);; 1 x Monitoring room/welfare office (approx 12.1m (l) x 4.85m (w) x 2.4m (h)); 1 x DNO Substation/building; 2 x Auxiliary Transformers (each approx 2.2m (l) x 1.8m (w) x 1.8m (h)); 10 x CCTV and lighting columns (approx. 4.3m high) Security fencing and gates at 2.4m in height Acoustic fencing along southern and eastern perimeter boundaries at 2.4m in height; Fire security (including provision of fire hydrants); Parking spaces and internal access roads.
3.3The containers, power stations, switchgear building and monitoring room would be provided within perimeter fencing and arranged in a roughly circle layout. These would be accessed via an internal access track with two points of entry into the compound. Access to the site would be via an improved access off the A6.
3.4The scheme includes landscaping across the site, which would comprise a woodland belt between the facility and the A6; a further woodland belt positioned centrally within the site; scattered specimen trees to the western part of the site; and a species rich grassland across the site. The landscaping proposed would also form the sites Biodiversity Net Gain proposals, with the scheme suggesting a habitat gain of 28.46%.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.