High Peak Borough Council
Development Control Committee, Monday 20 April 2026 at 1.30pm

HPK/2025/0502 - Land at Turnlee Quarry, Turnlee Road, Simmondley, Glossop, Derbyshire, SK13 6JS

Approved Planning 1 paper

AI summaryHigh Peak council approves retrospective planning permission for operational works at Turnlee Quarry aggregates yard in Simmondley, Glossop, ruling the Green Belt development is not inappropriate under NPPF paragraph 154(g).

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedRetrospective planning permission granted for works at aggregates yard
MoneyNot stated
What happens nextTwo conditions imposedPlans compliance and Biodiversity Enhancement Plan
Who it affectsGlossop Stone Sales aggregates yardFormer Turnlee Quarry, Simmondley

What was decided

Planning permission was granted as set out in the officer report. Report P65

The Head of Development Services was given delegated authority to amend the decision wording in consultation with the Chair, provided the substantive nature is not exceeded. Report P66

Two conditions were imposed: the development must be retained in accordance with the approved plans, and a Biodiversity Enhancement Plan must be provided. Report P65

Why

The site is previously developed brownfield land within the Green Belt, and the works fall within the NPPF paragraph 154(g) exception for redevelopment of previously developed land that does not cause substantial harm to Green Belt openness. Report P22, 7.10, 7.16

The works are well contained within the site, screened by existing trees, the raised quarry edge and Turnlee Road, and are not judged to cause substantial harm to the openness of the Green Belt visually or spatially. Report 7.13, 7.15, 7.16

At roughly 680m from the Peak District and 800m from Whitley Nab, the development is not considered to harm the setting of the National Park; the highway authority raised no objection. Report 7.21, P7

What happens next

The development must be retained in accordance with the approved plans. Report P65

A Biodiversity Enhancement Plan must be submitted to ensure compliance with Local Plan Policy EQ5. Report P65

Outstanding comments from the Council's Tree Officer on the TPO woodland along the site boundary are to be provided on the updates sheet. Report P50

Options considered

  • Chosen: Grant planning permission subject to conditions. The development complies with relevant Local Plan policies and the NPPF, including Green Belt, design, landscape, amenity, highways and biodiversity considerations. Report P65, 8.6

Implications

  • Legal: The development is deemed compliant with Local Plan policies S1, S2, EQ2, EQ3, EQ4, EQ5, EQ6 and CF6, and relevant NPPF chapters including 9, 12 and 13. Report 8.6, 7.34, 7.28
  • Equalities: Biodiversity Net Gain requirements are deemed to be excepted because the application is retrospective, but a Biodiversity Enhancement Plan is still required under Policy EQ5. Report 7.39, P65
  • Risk: Public footpath HP12/37/1 to the south-west affords only distant glimpse views, and the highway authority concluded there would not be an unacceptable impact on highway safety or a severe impact on congestion. Report 7.13, P7
  • Other: The applicant states the works will create two extra full-time staff posts and one additional part-time post. Report P8
  • Other: The application follows an enforcement investigation into works to the existing access, tree felling, resurfacing and regrading at the site. Report P8

Who and where

  • The applicant, who purchased the site in March 2024 and operates it as an aggregates yard for the sale, storage and distribution of stone and building materials. Report P8, 7.3
  • Nearest residential properties, located approximately 30m to the north and around 120m to the east of the site. Report 7.26
  • Users of public footpath HP12/37/1 to the south-west, who may obtain distant glimpse views of the site. Report 7.13, 7.21
  • The setting of the Peak District National Park, including Whitley Nab, considered at the planning balance stage. Report 7.21

Timeline

  • March 2024: The applicant purchased the site. Report P8
  • Pre-application (1990s): Planning consent was previously given for the open storage, reclamation, storage and resale of natural stone at the site. Report P8
  • 2026-04-20: Development Control Committee considered and approved the application.

Plain English for the jargon

  • BNG: Biodiversity Net Gain; under the statutory framework, development should deliver at least a 10% increase in biodiversity value relative to the pre-development baseline.
  • Green Belt: Designated protected land around settlements where planning permission will not be granted for inappropriate development unless very special circumstances apply.
  • NPPF: National Planning Policy Framework, the government's planning policy guidance for England.
  • LHA: Local Highway Authority; in this case Derbyshire County Council.
  • TPO: Tree Preservation Order; statutory protection for specified trees and woodland.
  • ProW: Public Right of Way, such as footpath HP12/37/1 referenced in the report.
  • LVIA: Landscape and Visual Impact Assessment, requested by the objector but not supplied with the application.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item26/117

Resolved

That planning permission be granted as set out in the report; and 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 20th April 2026

Application HPK/2025/0502 No: Location Land at Turnlee Quarry, Turnlee Road, Simmondley, Glossop, Derbyshire, SK13 6JS Proposal Retrospective Application for Operation development in relation to improvements to the access, retaining walls and hardstanding Applicant [name removed] (Willmow Reclamation and Salvage) Agent [name removed] (Wharfe Rural Planning) Parish/ward Glossop Date registered: 14/01/2026 If you have a question about this report please contact: Stuart Talbot, email: [email protected]

REFERRAL

The application is before committee as it has been called-in by Councillor Gardner due to concerns about the visual impact upon the Green Belt.

1. Summary of Recommendations

APPROVAL with conditions

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The application site refers to Land at Turnlee Quarry which is in use as an aggregates yard for the storage, recycling and sale of stone and other building materials. The site is accessed off Turnlee Road and is located wholly in the countryside although does directly adjoin the built up area boundary to the north and the east. Furthermore, the site is located within the Green Belt.

2.2The site itself comprises an open industrial appearance with hard surfacing, stone walling and the storage of building materials on site.

2.3The character of the surrounding area features the edge of settlement nature of the south of Glossop, to the east a mix of industrial uses and residential properties. To the west and south of the site are fields in agricultural use consistent with the countryside and the rural nature of this area. 3. DESCRIPTION OF THE PROPOSAL

3.1Retrospective planning permission is sought solely for the operational development regarding improvements to the existing access, retaining walls which line the access route and a concrete apron hardstanding as well as storage bays and regrading works within the site. The use of the site is not sought.

3.2The development includes two types of new wall elements which includes a dry stone wall and a concrete interlocking retaining wall. There are two sections of dry stone wall which reuses elements from the previous access either side of the access point onto Turnlee road. The dry stone wall section to the north of the access comprises a section of walling at approximately 1.4m in height with a length of circa 17m wrapping round the front of the access. The dry stone wall to the south side of the access point has a length of circa 13m again wrapping round the front and facing onto Turnlee Road with a maximum height of 1.7m. This element of the dry stone wall leads up the hill further into the site and adjoins a section of interlocking concrete retaining wall which encloses the access from the entry /egress onto Turnlee Road into the centre of the site. There are two large retaining walls either side of the new hard paved access road with a maximum height of 2.2m and stretch approximately 37m to the west of the access road and circa 93m to the eastern side of the access road.

3.3The proposals also consist of a section of vertical timber boarding to the back of the entry / egress point. The timber boarding has a width of 13.2m with a maximum height of 2.7m.

3.4The works also include the creation of storage bays and the levelling and regrading of material to support the ongoing use of the site.

3.5The application, the details attached to it, including the plans and the responses of the consultees can be found on the Council’s website at: Planning Application Search Results - High Peak Borough Council

4. Relevant Planning History

Reference no. HPK/0002/5828 Description: Haulage Contractors Depot Decision: Approved (19/10/1987)

Reference no. HPK/0002/9436 Description: Change of use from disused quarry to open storage for reclamation, storage and resale of natural stone. Decision: Refused (16/07/1990), Approved at Appeal

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2025/0502: Land at Turnlee Quarry, Turnlee Road, Simmondley, Glossop, Derbyshire, SK13 6JSReport 2 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

10 of 22 attended
RM
Councillor Robert McKeownChair, present
SE
Councillor Simon EvansVice-Chair, apologies
AB
Councillor Alan BarrowCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
SG
Councillor Stewart GardnerCommittee Member, apologies
LG
Councillor Linda GroobyCommittee Member, present
AH
Councillor Adrian HopkinsonCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
DL
Councillor David LomaxCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
GS
Councillor Gillian ScottCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present

All 22 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2025/0502 - Land at Turnlee Quarry, Turnlee Road, Simmondley, Glossop, Derbyshire, SK13 6JSThis decision
  2. HPK/2026/0146 - Land at St Georges Rd, New Mills DerbyshireRefused
  3. HPK/2023/0328 - Portland Nursing Home, 8 Park Road, BuxtonApproved
  4. HPK/2025/0340 - Hargate Hill Equestrian Centre Hargate Hill, Glossop - Retrospective application for change of use of land for the siting of caravans for residential occupation with associated developmentRefused
  5. HPK/2025/0447 - Land at Crossings Road, Chapel-en-le-FrithApproved
  6. HPK/2024/0496 - Land off Brown Edge Close, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open