Resolved
Resolved – That the application be approved, subject to the conditions and informatives set out in the officer’s report and the Addendum sheet circulated at the meeting.
Central & South Planning Committee approved this item on Tuesday 23 November 2010. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved – That the application be approved, subject to the conditions and informatives set out in the officer’s report and the Addendum sheet circulated at the meeting.
Report of the Head of Planning & Enforcement Services
Address 520B SOUTHERN PERIMETER ROAD HEATHROW AIRPORT
Development: Rebuilding of an existing cargo transit shed with ancillary office accommodation.
LBH Ref Nos: 57331/APP/2010/2038
Drawing Nos: 100306-(D)-002 B (Site Plan) 100306-(D)-003 A (Site Elevations) 100306-(D)-004 A (Layout Plan) 100306-(D)-005 A (Roof Plan) 100306-(D)-006 A (Office/Plant Plans) 10036-(D)-007 A (Elevations) 100306-(D)-008 A (Sections) 100306-(D)-001 B (Site Location Plan) 100306-(D)-009 A (Site Contour Plan) 100306-(D)-010 A (Fire Strategy Plan) CK400 07 (Proposed Drainage) Design and Access Statement prepared by 3D Reid dated August 2010 Energy Statement prepared by DSA Engineering dated 27/08/10 Preliminary Risk Assessment prepared by Buro Happold dated 30/09/10 Final Removal Report for Removing Radioisotopes prepared by Radiation Consultancy Services Ltd dated 16/09/10 Geotechnical & Contamination Interpretative Report prepared by Buro Happold dated August 2000 Unit B Phase 2 Contamination Assessment Report prepared by Buro Happold dated June 2004
Date Plans Received: 27/08/2010 Date(s) of Amendment(s): 17/09/0010 Date Application Valid: 17/09/2010 01/10/0010 27/10/0010 1. SUMMARY This application seeks full planning permission for the rebuild of an approximately 7,600m2 B1/B2/B8 industrial building, which has been damaged by fire, along the Southern Perimeter Road at Heathrow Airport.
With the exception of some very minor alterations, such as the insertion of additional doors at ground floor level, and minor internal alterations to the reception lobby, the new building would be a replica of the existing which, due to fire damage, is due to be demolished. The site infrastructure and external works are to remain as existing.
The proposed development would directly replace an existing facility at Heathrow. Its size, scale, design and layout are considered to be acceptable, in keeping with the existing and adjoining units. No alterations would be made to the access or parking arrangements and the scheme would have no additional impact on the surrounding highway network over and above the existing facility. The applicant has confirmed that the development would be fully accessible and, unlike the original unit, a proportion of the site's energy needs would be met through use of renewable technologies, in compliance with current London Plan standards.
Central & South Planning Committee - 23rd November 2010 PART 1 - MEMBERS, PUBLIC & PRESS The proposal is considered to comply with relevant UDP and London Plan Policies and, accordingly, approval is recommended.
2. RECOMMENDATION APPROVAL subject to the following:
1 T8 Time Limit - full planning application 3 years The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
REASON To comply with Section 91 of the Town and Country Planning Act 1990.
2 OM1 Development in accordance with Approved Plans The development shall not be carried out otherwise than in strict accordance with the plans hereby approved unless consent to any variation is first obtained in writing from the Local Planning Authority.
REASON To ensure that the external appearance of the development is satisfactory and complies with Policy BE13 of the Hillingdon Unitary Development Plan Saved Policies (September 2007).
3 M2 External surfaces to match existing building The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building, and the adjacent Unit 520A, unless otherwise agreed in writing by the Local Planning Authority.
REASON To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy BE15 of the Hillingdon Unitary Development Plan Saved Policies (September 2007).
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
520B Southern Perimeter Road, Heathrow Airport 57331/APP/2010/2038Report | 23 pages | DownloadRead as text |
Follow Central & South Planning Committee at Hillingdon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 May 2021 | To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... | Approved | Open |
| 4 May 2021 | 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... | Refused | Open |
| 4 May 2021 | 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... | Refused | Open |
| 4 May 2021 | Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. | Approved | Open |
| 4 May 2021 | Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.