RESOLVED that the application be REFUSED for the following reasons: 1 The applicant has failed to meet the requirements of the flood risk Sequential Test and, therefore, the proposal is unacceptable on flood risk grounds, contrary to Policies S1 and D5 of the approved Maldon District Local Development Plan and the NPPF. 2 It has not been demonstrated to the satisfaction of the local planning authority that an adequate means of surface water drainage would be provided and that the development would not result in an increase in flood risk, contrary to Policy D5 of the approved Maldon District Local Development Plan and the NPPF. 3 The development (which consists of a large, open-sided building to be used for storage and distribution purposes, given its proximity to the curtilage of a dwellinghouse ) has the potential to cause harm to the occupiers of existing, residential properties, particularly due to noise disturbance, contrary to Policies D1 and D2 of the Maldon District Approved Local Development Plan, the NPPF and the Maldon District Design Guide SPD.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
3.1Proposal / brief overview, including any relevant background information
3.1.1 This application relates to the parcel of land (around 0.63ha) to the north of Bates Road which is currently vacant. The site is undulating with an existing public footpath located on an embankment which runs along the southern boundary. The site has a further public footpath running along its north-eastern perimeter connecting Bates Road to Hall Road and The Street in Heybridge to the north. The site has been largely cleared of vegetation but there are a few trees within the site. The majority of the site is currently enclosed by a mixture of palisade fencing (south-eastern and part of north-eastern boundaries) and post and wire fencing (south-western and north- western boundaries).
3.1.2 The northern boundary of the site is adjacent to part of the River Blackwater. Beyond the north-eastern boundary of the site is a mixture of residential and commercial uses which back onto the site including the Heybridge Inn which is a grade II listed building located around 20m to the north of the site. The nearest residential property is 10m from the site and around 20m from the building proposed. The site adjoins the Quayside Industrial Estate and is adjacent to an existing car park which is unrelated to the site. The Heybridge House Industrial Estate is located immediately to the west.
3.1.3 The site is within the development boundary for Maldon/Heybridge but does not form part of any allocation within the approved Maldon District Local Development Plan (MDLDP). However, the adjacent industrial estate is an allocated employment site in the Local Development Plan (LDP). The site forms part of the Causeway Regeneration Area which is within the Maldon and Heybridge Central Area Masterplan. As part of the Masterplan, the application is identified as a site of Local Ecological Importance and the stretch of the River Blackwater forms part of a Green Corridor.
3.1.4 The site is located within Flood Zone 3b (the functional flood plain) and the Blackwater Estuary Ramsar site, Special Protection Area (SPA), Special Area of Conservation (SAC) and Site of Special Scientific Interest (SSSI) are located around 400m to the south east of the site.
3.1.5 It is proposed to erect 1139.6 square metres of storage and distribution (Class B8) floorspace in the form of a new open sided barn to be positioned at the northern end of the site. As part of the application, reference is made to the new building being used to store, for example, heavy construction and engineering goods but reference is also made to the building being used for the storage of recycling bins.
3.1.6 The building would measure 51.8m in length and 22m in width. It would have a shallow pitched roof with a maximum height of 7.3m and an eaves height of 3.3m. The building would be finished in grey cladding.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.