Resolved
RESOLVED that Option A as set out in the Cabinet report be approved. Residual/ general waste Paper and card Option A 180l wheeled bin 180l wheeled bin
Cabinet approved this item on Monday 15 January 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that Option A as set out in the Cabinet report be approved. Residual/ general waste Paper and card Option A 180l wheeled bin 180l wheeled bin
Waste/ recycling service change: Autumn 2018 Page 183
Wheeled bin size New service model Existing Veolia’s original bid Page 184
Residual Food Recycling Garden Food Mixed Paper/ Residual Garden recyclin card g unlimited 23l 55l 240l* 23l 55l 240l 240l 240l* *Optional paid-for service Recommendation Page 185
Food Mixed Paper/ Residual Garden recyclin card g 23l 55l 180l 180l 240l* *Optional paid-for service WRAP study (2012/13) • Key determinates to higher recycling rates include: • The affluence of the area (more affluent = higher recycling) • The urban/rural nature of the authority (more rural = higher recycling) Page 186
• Whether the authority provided a food waste service (food waste = higher recycling overall) • The capacity (in litres) of the general waste collection (lower capacity of general waste = higher recycling)
Whilst WRAP have established a link between capacity and recycling rate, they do not conclude the optimum size of wheeled bin.
http://www.wrap.org.uk/sites/files/wrap/priv_download/Analysis_of_recycling_performance_and_waste_arisings%20in%20 the%20UK%202012%2013.pdf Potential savings • Theoretically based on the WRAP study: Bin size Collection Effective Increase in Savings/yr Cumulative frequency capacity/week recycling rate (approx) savings/yr Page 187
240l bin weekly 240l 0% 0 0
240l bin fortnightly 120l 7.2% £91,300 £91,300
180l bin fortnightly 90l + 1.8% +£22,800 £114,100
140l bin fortnightly 70l + 1.2% +£15,200 £129,300
• Actual savings will depend on the real reduction in overall general waste achieved and the increase in recycling. There are many contextual factors that determine these changes, many of which are outside of the local authority’s control. • If the size of the bin proves to be insufficient, it is likely it will cause additional fly-tipping and ‘side-waste’, which is costly to clean up thus negating any savings in waste disposal. London authorities Recycling % Local Authority - London Residual Dry Recycling (2015/16)
(all those with AWC residual) AWC Container Volume (l) Weekly AWC Container Volume (l) Islington Yes blk sack 240/360 Yes reuseable sacks, boxes, wheeled bins 35-180 29.4 Sutton Yes Wheeled bin 140/240 Yes Wheeled bin 140/240 34.7 Page 188
Southwark Yes Wheeled bin 240 Yes Yes Wheeled bin/boxes 240 35.0 Haringey Yes Wheeled bin 180/240 Yes Wheeled bin 180/240 36.2 Croydon Yes Wheeled bin 180/240 Yes Boxes 55 37.8 Brent Yes Wheeled bin 140/240 Yes Wheeled bin 240 38.4 Bromley Yes blk sack - Yes Boxes 55 45.9 Kingston Yes Wheeled bin 180/240 Yes Boxes, reusable sacks - 45.8
• These figures indicate that there are a range of collection services in operation. Range between 240l/week capacity to 70l/week. • These services have been introduced at different points in time and have been introduced for a range of different reasons depending on factors at that time. In some cases the service has been changed since the last officially recorded recycling rates from Defra e.g. Sutton. • There is no clear link between container size and recycling rates. Bin dimensions Volume (litres) 140 180 240
Height (mm) 1070 1080 1080
Width (mm) 490 480 580
Depth (mm) 550 725 730 Page 189
Indicative price £14.38 £17.37 £18.42 Sample only: prices & dimensions differ between manufacturers
240l 180l This page is intentionally left blank
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Enc. 1 for Residual waste container sizeReport | 352 KB | DownloadRead as text |
PDF |
Residual waste container sizeReport | 65 KB | Download |
Follow Cabinet at Merton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 21 Sep 2026 | Council’s New Homes ProgrammeCabinet is asked to: A. Approve the establishment of the (the Programme) as set out in this paper. B. Approve the pro... | Approved | Open |
| 21 Sep 2026 | Morden Town Centre RegenerationCabinet is asked to: A. Note the progress made on the Programme since Cabinet approved the procurement of a developme... | Noted | Open |
| 21 Sep 2026 | Property Asset Strategy Principles and corporate landlord modelCabinet is asked to: A. Approve the Property Asset Strategy principles as set out in this report. B. Agree the implem... | Approved | Open |
| 21 Sep 2026 | Recycling and Waste Collection Services Contract Update 2026Cabinet is asked to: A. Note the key performance indicators for the first year following the award of the contract fo... | Noted | Open |
| 21 Sep 2026 | Environmental Enforcement and Animal Welfare Contract – Extension and VariationCabinet is asked to: A. Approve the extension of the environmental enforcement contract (without the stray/abandoned ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.