AGREED 1. To adopt the decoration preparation and starting well fund as part of the Empty Homes Standard; and. 2. To approve additional funding of £275,000 being transferred to base budgets to facilitate the service improvement from the Efficiency Savings reserve.
Word for word from the decision Newark and Sherwood published for this meeting.Source: democracy.newark-sherwooddc.gov.uk
1.1The standard of homes at relet was identified as an area for review and through a desktop review, the Council found property condition featured strongly in complaints and insight feedback. The Empty Home Standard was ready for a review and there was a call from the Council and tenants to make our homes better. There was also an opportunity to set aside efficiency savings from bringing housing back into Council to trial a pilot and adopt some or both elements (if successful).
1.2A report was presented to SLT on 10 May 2022 and a presentation to Policy & Performance Improvement Committee on 13 June 2022 and the recommendations were fully supported and recommended to Cabinet to adopt.
1.3The core lettings standard had been reviewed and improved prior to the pilot. The pilot scheme, approved by both SLT and HCC included decoration preparation in addition to the revised core lettings standard and an additional sum of up to £500 per property to meet individual tenant needs to help them “start well” in their tenancy. 1.4 Works Required on Empty Homes
During the period, there were 242 empty homes (compared with 218 empty homes for the same period of 2020/21). The table below shows that 71 (29%) of these had decoration preparation works carried out.
Month Number of Number of Decoration Empty Homes Preparations completed October 2021 37 9 November 2021 44 16 December 2021 43 14 January 2022 33 9 February 2022 45 12 March 2022 40 11 Total 242 71 (29% of total empty homes)
1.5During the desktop exercise in February and March 2021, there were 67 empty properties during the 2 months and it was calculated that had we been carrying out decoration preparation at that time, 43 (64%) properties would have required these works. Whilst it is recognised that the number of empty homes requiring works can fluctuate, along with the condition of the properties becoming empty, the number of empty properties requiring works for the pilot period is less than half of what was projected (29% versus 64%). This has a positive implication on projected annual costs and details on this is presented further down in the report.
1.6The table below shows the additional cost for the decoration preparation works and the average cost per property.
Month Number of Additional Total Average Additional Decoration Cost for Cost Per Property Preparation Decoration for Decoration Preparation Preparation October 2021 9 £6,700 £744 November 2021 16 £16,200 £1012 December 2021 14 £13,300 £950 January 2022 9 £12,500 £1,389 February 2022 12 £16,045 £1,337 March 2022 11 £14,100 £1,282 Total 71 £78,845 £1,110
These additional costs when added to the previously reported average standard annual cost per empty property of £1,300, bring the total average costs per empty property to approximately between £2,044 and £2,689.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Budget Performance Report Quarter 1That Cabinet: (a) note the General Fund projected unfavourable outturn variance of £0.665m; (b) note the Housing Reve...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.