Resolved
a) That the application for listed building consent be approved subject to the following conditions: 1) Time limit for commencement of development 2) Targeted building recording and any subsequent mitigation 3) Details of restoration of the interiors to be submitted and informed by strip out work 4) Mortar mix of any repointing of existing building 5) Timber survey to establish scope of repairs or otherwise 6) Details of proposed roof insulation 7) Window reinstatement details 8) Details of secondary glazing 9) Details of bricks (colour, size and bonding) to be used to reinstate the rear elevation 10) Details of means by which the cruck blade in the two storey service building is to be removed and then reinstated 11) Salvaging and reinstatement, and replication of cornice detailing b) That the planning application be approved, subject to the following conditions: 1) Time limit for commencement 2) Revised and approved plans 3) Phasing of works 4) Window detail 5) Prior provision of the access, parking, servicing and turning area; 6) Prior close of existing vehicle accesses onto Lower Street, 7) Prior approval of revised access details onto Stanier Street, including road markings; 8) Implementation of the submitted Travel Plan, 9) Approval and provision of cycle parking; 10) Position of any gates; 11) Approval and implementation of a Construction Method Statement 12) Finished floor level, 13) Protection of ‘controlled water’ receptors from contamination during the development; 14) Avoidance of piling without consent (in order to protect ground water quality), 15) Avoidance of proposals to drain surface or roof water into the ground without consent, 16) Culvert survey 17) Construction hours, 18) Submission, approval and implementation of a Construction Method Statement, 19) Giving of notice of piling works 20) Internal dwelling noise limits, 21) Fume extraction systems, 22) Mechanical ventilation/refrigeration/air conditioning equipment controls 23) Prevention of food and grease debris entering the drainage system, 24) Heating and power arrangements particularly CHP arrangements, 25) External artificial lighting, 26) Waste and recyclate storage and collection arrangements and timing. 27) Contaminated land 28) Additional information relating to retention of trees on Stanier Street 39) Full landscaping details, including appropriate tree planting to replace those lost as a result of the scheme 30) External materials 31) Archaeological evaluation and any subsequent mitigation 32) That a detailed surface water drainage scheme be submitted and approved.