Rotherham Metropolitan Borough Council
Improving Places Select Commission, Wednesday 4 September 2013

Highway Maintenance Carriageway Defect Repairs - Multihog

Noted Committee 1 paper

Improving Places Select Commission noted this item on Wednesday 4 September 2013. Below is the council's own wording, with the papers it was decided on.

Item17

Resolved

Resolved :- (1) That the report be received and its contents noted. (2) That a further report be submitted to a future meeting of the Improving Places Select Commission explaining ( i ) the prioritisation of specific highways for repair, within the annual maintenance programme; (ii) the detail of the various methods of highway surface repairs, ranging from safety defects and small patching works to surface dressing and large-scale highway repairs.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Improving Places Select Commission, 10 pages

Summary

Further to the report presented to Improving Places Select Commission on 16th April 2013, this report provides members with information on the provisional results of the trials of the new method of repairing highway defects (potholes) using the maintenance milling machine (Multihog).

Recommendations

It is recommended that Members note the contents of the report 7. Proposals and details

An analysis of the highway safety defects repaired shows a steady increase in numbers and cost over the last few years (see table below). As these are only temporary repairs, and not cost effective, it is becoming increasingly important that an alternative method of repair had to be found; the development of the ‘first time fix’ approach seemed to be the way forward.

Highway safety defects range from a trip hazard on a flagstone to a major road collapse; the vast majority of the safety defects are however potholes in the carriageway. The traditional method of repairing these carriageway safety defects is by removing any loose debris and then filling the defect with 3mm surfacing material. This type of repair is not generally very long lasting with an (average) estimated life expectancy of less than 2 years, but they can also look unsightly and do not provide a smooth surface; some do fail in a relatively short period especially in winter.

The average cost of repairing a pothole using the traditional method is £14, equivalent to about £50/m2.

Small patching works used to be carried out using a hand excavation or conveyor milling machines. Due to the change in legislation on hand arm vibration equipment the normal hand method of excavating small patches can no longer be used. We have experimented with using the conveyor milling machines, but they have large width cutting tools (not suitable for small patches) and cannot move from site to site without the assistance of a low loading vehicle; this adds considerably to the costs on each job.

No. Actionable Cost (rounded to Cost per Defect Year Defects nearest £1,000) (rounded to nearest £) 2007/2008 11,638 £240,000 £21 2008/2009 12,062 £243,000 £20 2009/2010 15,624 £250,000 £16 2010/2011 28,229 £418,000 £15 2011/2012 28,347 £427,000 £15 2012/2013 32,530 £456,000 £14 2013/2014(*) 36,000 £504,000 £14 (*) forecast data

The majority of the carriageway safety defects have a response time for repair of 24 hours from the identification of the defect to completion.

In January 2012 we took delivery of a Maintenance Milling Vehicle (MMV) which has various maintenance functions, one of which was a milling attachment. The MMV is compact (about the size of a family car) and can move from site to site independently; the MMV was acquired to carry out normal carriageway patching and support the general works programme. After using this vehicle for a few months it was clear it could be also be used to carry out ‘first time fix’ for safety defects. An outline for a new first time fix process was developed for use on the Unclassified, estate roads. A new response target of 48 hours was set for removing the safety defect with the follow-up patch being completed within five (further) working days; this allowed time for programming of the repair. The detail of the protocol is in Appendix 1, and a trial using this new method was started in December 2012.

The Trial

The Trial started in December 2012, continued in January/February 2013 and restarted in April 2013 following the end of the winter maintenance season. The trial has been continuing since then.

The December trial was undertaken with one Highway Inspector (HI) and in January/February it was undertaken with two HIs. The trial restarted in April, with a rota system in place for HIs, based on the MMV moving to a different Area Assembly each month.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Highway Maintenance Carriageway Defect Repairs: MultihogReport 10 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. Highway Maintenance Carriageway Defect Repairs - MultihogThis decision
  2. Highways Maintenance - 'Multihog' patching and pothole proceduresNoted
  3. Highways Maintenance Schemes Programme: - 2012/2013.Approved
  4. Highways Maintenance Schemes Programme 2011/2012Approved
  5. Feasibility of a Highway Maintenance PFI BidDecided
  6. Local Highway Maintenance Challenge Fund: RMBC Scheme BidApproved

More from Rotherham Improving Places Select Commission

All decisions
MeetingDecisionOutcome
1 Sep 2026 Minutes of the previous meeting held on 23 June 2026- That the minutes of the previous meeting held on 23 June 2026 be approved as a true and correct record of the proce... Approved Open
1 Sep 2026 Improving Places Select Commission - Work Programme 2026 - 2027- 1) That the current IPSC Work Programme be noted; and 2) That the Governance Advisor be authorised to make any requ... Noted Open
23 Jun 2026 Minutes of the previous meeting held on 21 April 2026- That the minutes of the previous meeting held on 21 April 2026 be approved as a true and correct record of the proc... Approved Open
23 Jun 2026 Health, Welfare and Safety Panel - Representative from the Improving Places Select Commission- That the Improving Places Select Commission appointed Councillor Thorp as its representative on the Health, Welfare... Decided Open
23 Jun 2026 Improving Places Select Commission - Work Programme 2026 - 2027- 1) That the current IPSC work programme be noted; and 2) That the Governance Advisor be authorised to make any requ... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies