Rotherham Metropolitan Borough Council

Risk Register

Agreed Committee 2 papers

Barnsley, Doncaster and Rotherham Joint Waste Board agreed this item on Friday 11 December 2015. Below is the council's own wording, with the papers it was decided on.

Item14

Resolved

Agreed :- That the updated information on the risk status report be received.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Barnsley, Doncaster and Rotherham Joint Waste Board, 2 pages

Risk Status Report

Risk Risk Comments and outstanding actions Date for completion Reference WPFIT001 Waste Volumes Waste managers and the BDR team to continue liaison to ensure waste projections Monitoring of waste Change – Facility too are accurate and that all streams that can be processed at the facility are sent there. volumes will be on-going. small or too large Inter-Authority Agreement is being reviewed. A report on the Inter Authority Agreement currently being considered across the 3 Councils. WPFIT002 Offsite works There was a risk that works would need to be carried out that had not been included Complete in the original costs. These risks dis not materialise and the work is now complete. WPFIT007 Legislative Change - Legislative change can impact on costs and operations at the facility so BDR will Lobbying on Recycling – BDR have no direct Monitor the legislation on an ongoing basis and Lobby Central Government on any draft letter December control over item which may impact on the Contract 2015. Legislative change Close liaison with waste managers – IAA3 providing more clarity On-going No further movement on the Circular Economy – further information from Europe was published on 2nd December 2015 WPFIT008 Compliance with Failure of the Contractor to comply with the operational terms of the contract could On-going contract result in complaints from residents. Measures are in place to monitor the Contractors maintenance of the biofilters to prevent odours. The routes the vehicles take are monitored and the number of vehicles in and out of the facility, are reported as part of the monthly report. Noise mitigation measures have been installed BDR and the Contractor continue to monitor the area and control the activities to minimise night time noise. WPFIT009 Major Incident at An Emergency plan is in place, Health and Safety meetings with H&S representatives On-going ITS/AD of all three Councils are held quarterly. The actions necessary from a contractual view point should this occur need to be documented in the Contract Manuals. WPFIT010 ITSAD fails The facility passed the commissioning tests and the acceptance test certificate was Complete commissioning tests issued on 3/7/2015 WPFIT011 Business Continuity - Procedures that are in place to monitor the contract need to be fully documented in January 2016 BDR the Contract Manuals. This is a work in progress as the procedures are being refined. Training material needs to be developed for Members, Senior Officers and the wider team to ensure resilience. WPFIT012 Business Continuity - Contingency points are in place and communication protocols are in place between January 2016 3SE the Contractor and the Operational Managers. This risk was around the build process. This is to be replaced with an Operational BCM Risk and control measures WPFIT013 Design Changes A change protocol exsited Completed result in scope creep WPFIT014 Construction delay Construction Complete Completed WPFIT015 Review of Waste There is a Risk that if BDR fail to comply with the Terms and Conditions of the Waste On-going Infrastructure PFI Infrastructure letter the credits could be removed or reduced. The BDR Joint Waste Credits Team liaises with the Operational Managers and the WIDP Transactor to ensure compliance with these Terms WPFIT016 Insurance Costs Insurance costs for waste management facilities have increased due to the number of On-going Increase fires in the sector. BDR have engaged AON to provide advice and the Contractor has a robust fire strategy in place and is working with insurance companies to confidence to bring down the costs. WPFIT017 Plant fails to Plant commissioned Complete commission on time

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Risk RegisterReport 2 pages DownloadRead as text
PDF
Risk Status Nov15Report 1 pages Download

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. Risk RegisterThis decision
  2. Risk RegisterNoted
  3. Risk Management Annual Summary 2025-2026 and Corporate Strategic Risk Register UpdateDecided
  4. Risk RegisterNoted
  5. Risk RegisterNoted
  6. Corporate Strategic Risk Register UpdateNoted

More from Rotherham Barnsley, Doncaster and Rotherham Joint Waste Board

All decisions
MeetingDecisionOutcome
16 Nov 2026 Minutes of the previous meeting held on (copy attached)That the minutes of the meeting of 3 February 2026 be approved. Approved Open
16 Nov 2026 BDR Managers ReportThat the budget for 2026/27 be agreed. 2. That the report be noted. Agreed Open
16 Nov 2026 BiffaThat the update be noted. Noted Open
16 Nov 2026 Risk RegisterThat the report be noted. Noted Open
3 Feb 2026 Minutes of the previous meeting held on 7 October 2025 (copy attached) and any matters arising- That the minutes of the meeting held on 7 October 2025, be approved as a true and correct record of the proceedings. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies