That, contrary to the Officer’s recommendation, planning permission be refused for the following reasons: · The proposal constitutes large scale industrial development and is inappropriate in terms of location, fails to protect and enhance the natural and historic environment and the character and high quality of the local countryside and setting of Ludlow, and would have an adverse impact on leisure and tourism. The renewable energy benefits of ... view the full minutes text for item 45.
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Application Number: 15/01472/FUL Parish: Bitterley PC Proposal: Construction of solar park with attendant infrastructure including centre station, inverters, cameras, fencing and associated landscaping
Site Address: Land to the west of Squirrel Lane, Ledwyche, Ludlow, Shropshire
Contact: Tim Rogers (01743) 258773 Land to the west of Squirrel Lane, South Planning Committee – 11 August 2015 Ledwyche, Ludlow, Shropshire
Recommendation:- Approve subject to the conditions set out in Appendix 1.
Statement of Compliance with Article 31 of the Town and Country Development Management Procedure Order 2012
The authority worked with the applicant in a positive and pro-active manner in order to seek solutions to problems arising in the processing of the planning application. This is in accordance with the advice of the Governments Chief Planning Officer to work with applicants in the context of the NPPF towards positive outcomes. The applicant has provided further clarification in response to issues raised during the planning consultation process. The submitted scheme, has allowed the identified planning issues raised by the proposals to be satisfactorily addressed, subject to the recommended conditions.
REPORT
1.0THE PROPOSAL
1.1The applicant is proposing to establish a solar photovoltaic (PV) park on 13.5 hectares of Grade 3b field south of Henley Hall near Ludlow which is currently in arable use. The proposed facility would generate up to 5 Megawatts of renewable electricity for export to the local electricity grid which is equivalent to the annual power consumption of 1,250 homes. Following construction, the site would be seeded and would become available for grazing. Construction would take 4 months. The site would have an operational life of up to 30 years, after which it would be decommissioned and the pasture field would be would be reinstated.
1.2The solar park would consist of 21,956 photovoltaic modules 1.68m wide and 2.9m long, mounted on frames and laid out in rows running from east to west across the site. They would be oriented south and angled at 30 degrees to the horizontal with a maximum height of 2.3m and 2.7m depending on ground levels (minimum 0.8m). The mounting frames would be matt finished galvanised steel with 200mm diameter steel posts. The posts for the panel frames would be driven into the ground up to a depth of 1.5m. The positioning of the strings of modules takes into account the applicants ecological, arboricultural and the flood risk reports.
1.3The development also involves construction of a centre station at the southern end of the site and four inverter substations throughout the site. The centre station comprises 3 buildings grouped together: • A 50 kVA transformer nominally 1.5m (w) x 1.5m (l) x 2.85m (h) • A Switch Gear Unit nominally 2.5m (w) x 4.1m (l) x 2.85m (h) • A power distribution cabinet nominally 5.33m (w) x 4.83m (l) x 4.8m (h) with • adjoining section 2.4 m (w) x 1.85 (l) x 3.4m (h) The inverter substations are made up of three items of plant contained within a single building measuring 2.5m (w) x 6.9m (l) x 3.7mhigh (of which only 2.89m is above ground level). This plant item will be placed on a concrete pad. All associated cabling between the module rows and the inverter/transformer stations would be underground.
Contact: Tim Rogers (01743) 258773 Land to the west of Squirrel Lane, South Planning Committee – 11 August 2015 Ledwyche, Ludlow, Shropshire
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.