Resolved
- That permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development shall be carried out in accordance with the approved plans: Location Plan; Site Location Plan; AS2102 21; AS2102 22; AS2102 23; AS2102 24; [NI number removed]; AS2102 26E; AS2102 27G; [NI number removed]; [NI number removed]. Reason: To ensure the development is carried out in accordance with the development plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved the development hereby permitted shall not commence other than for groundworks and site preparation works unless and until details and appropriately sized samples of the materials to be used for all the external surfaces of the proposed buildings at the site including facing materials, flat roof detail, shopfront and fascia, windows, doors, lintel, parapet, coping, quoins, dormer cheeks, roof tile, decorative brickwork, balustrading, handrails and roller shutters to the bin store have been submitted to and approved in writing by the local planning authority. The works must then be carried out in accordance with the approved materials and drawings before the dwellings hereby approved once occupied. Reason: To safeguard character and appearance of the area and amenities of neighbouring occupiers in accordance with Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM5 of the Development Management Document (2015) and the Design and Townscape Guide (2009). Given the nature of the development propose, the details sought and the objectives of the condition it is fundamental that information required is provided prior to the commencement of any development. 04 Prior to the first occupation of the flats hereby approved, cycle and refuse and general storage for the flats shall be provided in accordance with the details shown on plan AS2102 21. The approved cycle parking and refuse storage shall be provided in full and made available for use by the occupants of each dwelling prior to the first occupation of the dwellings hereby approved and be retained as such in perpetuity. Reason: To ensure the provision of adequate cycle parking and refuse storage in accordance with policies DM3, DM8 and DM15 of Development Management Document. 05 Prior to occupation of the development hereby approved details of the water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day ( lpd ) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances ... view the full minutes text for item 723.