- That planning permission be GRANTED. Informative You are advised that as the development equates to less than 100sqm of new floorspace the development benefits from a Minor Development Exemption under the Community Infrastructure Levy Regulations 2010 (as amended) and as such no charge is payable. See www.southend.gov.uk/cil for further details about CIL. The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
Erect mooring structure with ramp and metal balustrade Proposal: (retrospective)
Address: Billet Wharf, High Street, Leigh-on-Sea
Applicant: Osborne & Sons (Shellfish) Ltd
Agent: GL Hearn
Consultation Expiry: 21.11.2017
Expiry Date: 18.12.2017
Case Officer: Kara Elliott
Plan Nos: Location Plan, 840.200.00, 840.201.00, 840.202.00
Recommendation: GRANT PLANNING PERMISSION
Development Control Report 1 The Proposal
1.1Retrospective planning permission is sought for the mooring structure with ramp and metal balustrade at Billet Wharf in Leigh Old Town. The structure has been in place since March 2016 and replaced a former smaller mooring structure which had been in place since 1993. The previous structure was approximately 56m². The existing structure, including ramp, measures approximately 60m².
1.2The structure is irregular in shape but extends to a maximum of approximately 4m x 6m (12.6 metres deep, with a maximum width of 7.54 metres including ramp). The structure consists of a concrete raised platform with a height of 1.5 metres above water level. The height to the top of the metal balustrading from the water level is 2.4 metres, 1.88 metres from ground level. Two tyre bollards are located at the edge of the platform to protect the vessels which moor at the structure and reach a total height of 9.6 metres (approximately).
1.3The applicant describes that the structure provides an enhanced structure for health and safety purposes and provides improved access to Leigh Creek for larger fishing vessels to meet current and on-going operations of the Osborne & Sons (Shellfish) business. A single vessel can be moored at one time. The structure and ramp allow for the loading and unloading of the vessel to transport the catch along the foreshore to the Osborne & Sons Ltd Factory located at 9 Cockleshed; approximately 230 metres to the west of the structure.
1.4The application site is located within the Old Leigh Conservation Area, the Benfleet and Southend Marshes Site of Special Scientific Interest (SSSI), RAMSAR site and is within a Special Protection Area (SPA). The application site is also located within Seafront Character Zone 2, as defined within the Development Management Document (Policy DM6).
1.5The application falls to be considered by the Development Control Committee at the request of Cllr Bernard Arscott.
2 Site and Surroundings
2.1The application site relates to an existing mooring structure with ramp and metal balustrade at Billet Wharf in Leigh Old Town as described in the former section of this report, located within Leigh Old Town, a historic compact settlement at the base of steep cliffs, segregated from the rest of Leigh on Sea by the railway line that runs along the northern boundary of the conservation area.
2.2The application site is located within the Old Leigh Conservation Area as well as being located within the Benfleet and Southend Marshes Site of Special Scientific Interest (SSSI).
Development Control Report 3 Planning Considerations
3.1The main planning considerations for this application are the principle of development, environmental issues, its impact upon the character and appearance of the area and the conservation area, impact on residential amenity and CIL implications.
4 Appraisal
Principle of the Development
National Planning Policy Framework (2012); Core Strategy (2007) Policies KP1, KP2, CP1, CP4; Development Management Document (2015) Policies DM1, DM3, DM5, DM6 and the Design and Townscape Guide (2009).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.