AI summarySouth London Waste Partnership Joint Committee noted that the Beddington Energy Recovery Facility breached its NOx emissions permit 916 times over 18 months, with the operator accepting the finding, and reviewed the first six months of new dry recyclables contracts.
Money£1.5m and nearly £4mBiocollectors upgrades and HRRC asset replacement
What happens nextSLWP to assess Viridor penaltiesBiocollectors to install abatement kit by year end
Who it affectsCroydon, Kingston, Merton, Sutton residentsWaste and recycling services across four boroughs
What was decided
The Joint Committee noted the latest position on the ERF residual waste treatment contract following the CEMS calibration issue, including that Viridor accepted the Environment Agency findings on 31st July and that 916 daily NOx exceedances occurred between August 2022 and March 2024. Report P5, 4.10, 4.13, 4.17
The Joint Committee noted the current status of the new Dry Recyclables contracts, which commenced on 1st April 2025 and run until 31st March 2028, with all fully co-mingled DMR from Croydon, Merton and Sutton rejected this contract year due to contamination. Report P6, 1.4, 5.6
The Joint Committee was asked to comment on any aspects of performance of the Partnership's transfer, treatment, recycling and disposal contracts, with Q1 and Q2 data covering 1st April to 30th September 2025. Report P7, P3
Why
An incorrect CEMS calibration methodology, applied by sub-contractors, led to a lower than necessary urea dose for 18 months, causing 916 exceedances of the daily NOx limit (457 on line 1 and 459 on line 2). The Environment Agency found Viridor had breached its permit in multiple ways, though the EA and UK Health Security Agency concluded there was no significant public health impact. Report 4.10, 4.11, 4.12, 4.13, 4.15, 4.19
The Partnership needed to review contract performance for Quarters 1 and 2 of 2025/26, covering food and green waste, HRRC sites, residual waste treatment, and the first six months of new dry recyclables arrangements, following a re-procurement completed in 2024. Report P1, P2, P3, 1.4, 5.1, 5.2
What happens next
The Environment Agency is still considering what enforcement action to take against Viridor, but has indicated it is highly unlikely to revoke the Beddington ERF permit, and there will be no impact on residual waste treatment services. Report 4.20
The South London Waste Partnership will assess appropriate contractual penalties and communicate its decision to Viridor, working with the operator on preventative measures and steps to rebuild trust with local residents and stakeholders. Report 4.22
Biocollectors is installing new air quality abatement technology by the end of the year, with around £1.5m of total investment in facility upgrades expected; an Asset Replacement Programme at the HRRC sites will see nearly £4m invested over the next 18 months. Report 2.13, 3.10
The money
around £1.5m Total expected investment in Biocollectors facility upgrades (hardstanding and air quality abatement technology) Report 2.13
nearly £4m Investment in the HRRC Asset Replacement Programme over the next 18 months Report 3.10
just over £144k Estimated avoided cost from the Sutton rubble-charging scheme from its introduction in July 2021 up to the end of Q4 2024/25 Report P94
£5.60 Charge per 50-litre rubble sack at Sutton's Kimpton Park Way HRRC after the first two free sacks per visit Report P94
Options considered
Rejected: Proceed with introducing mattress recycling at HRRC sites. Net costs are almost 40% more than current haulage and treatment at the ERF, and there are few UK operators with variable performance of 50% to 80% Report P110, P111, P112, P113
Chosen: Continue enforcement and contract action against Viridor following the CEMS calibration breach. EA concluded permit was breached in multiple ways and on multiple occasions; SLWP will assess contractual penalties alongside any EA enforcement Report 4.18, 4.22
Implications
Legal: There are no legal considerations arising directly out of the recommendation in this report, though the Environment Agency may take enforcement action against Viridor and the SLWP is separately assessing contractual penalties. Report 7.1, 4.20, 4.22
Financial: There are no financial considerations arising directly out of the recommendation in this report, though ongoing investment is being made at the Biocollectors facility (around £1.5m) and HRRC sites (nearly £4m). Report 7.2, 2.13, 3.10
Risk: The Beddington ERF permit was breached in multiple ways over an 18-month period due to sub-contractor error in CEMS calibration, but the EA and UK Health Security Agency concluded there was no significant public health impact and revocation of the permit is highly unlikely. Report 4.13, 4.18, 4.19, 4.20
Equalities: The Biocollectors facility has ongoing concerns among local residents about potential odour, although SLWP officers have not received any odour complaints across the summer period; engagement with Sutton Environmental Health Officers continues. Report 2.14
Other: All fully co-mingled DMR from Croydon, Merton and Sutton has been rejected this contract year to date due to excessive contamination, mainly food waste and general household waste, prompting work with boroughs, collection contractors and residents with communal storage. Report 5.6, 5.7
Who and where
Residents of the London Boroughs of Croydon, Kingston, Merton and Sutton Report P1
Residents living near the Beddington ERF site in Sutton Report 1.3, 4.10, 4.22
Residents near the Biocollectors AD facility in Mitcham Report 2.10, 2.11, 2.14
Users of the six HRRC sites in the SLWP region Report 1.2, 3.1
Operators and contractors: Biocollectors Ltd, Olleco, Countrystyle Recycling, SUEZ, Veolia, Viridor South London Ltd, Edwards Recycling Report 1.1, 1.2, 1.3, 1.4
Timeline
1st April 2025: New Dry Recyclables management contracts commenced, running until 31st March 2028 with options to extend to March 2030 Report 1.4, 5.2
April to May 2025: Planned four-week maintenance shutdown of the Beddington ERF, with 1,870 tonnes of residual waste sent to landfill as a result Report 4.3, 4.4
13th May 2025: Single 10-minute carbon monoxide exceedance on line 2 following start-up, the only exceedance event in the reporting period Report P127, P128, P129
19th June 2025: Environment Agency issued its Compliance Assessment Report to Viridor on the CEMS calibration issue Report 4.17
31st July 2025: Viridor accepted the EA findings and withdrew its appeal, making the CAR final and publicly available Report 4.17
18th September 2025: Beddington Community Liaison Group held at the ERF, with Viridor and the EA presenting on the CEMS incident Report P149
1st April to 30th September 2025: Performance reporting period for Quarters 1 and 2 of contract year 2025/26 Report P3
15th September 2030: Current expiry date of the Veolia HRRC contract Report 1.2
March 2044: End of the initial 25-year term of the Viridor residual waste treatment contract, with potential extension to a Long Stop Date of 5th November 2047 Report 1.3
Plain English for the jargon
ERF: Energy Recovery Facility; the Beddington Lane facility in Sutton operated by Viridor South London that incinerates residual waste to generate energy
CEMS: Continuous Emissions Monitoring System; equipment that samples emissions every 10 seconds and reports results to the Environment Agency
NOx: Oxides of Nitrogen; nitric oxide and nitrogen dioxide, mainly formed during combustion of fossil fuels
CAR: Compliance Assessment Report; issued by the Environment Agency setting out permit breach findings
HRRC: Household Reuse and Recycling Centre; six sites in the SLWP region operated by Veolia
AD: Anaerobic Digestion; a treatment process that breaks down food waste to produce biogas and digestate
DMR: Dry Mixed Recycling; fully co-mingled paper, card, glass, plastics and cans collected at kerbside
SLWP: South London Waste Partnership; the joint arrangement covering the London Boroughs of Croydon, Kingston, Merton and Sutton
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item7
Resolved
Note the latest position with the ERF residual waste treatment contract related to the recent CEMS calibration issue previously reported on (Part 4.9). 2. Note the current status of the new Dry Recyclables contracts following the first 6 months of operation (Part 5), 3. Comment on any aspects of the performance of the Partnership’s transfer, treatment, recycling and disposal contracts.
Word for word from the decision Sutton published for this meeting.Source: moderngov.sutton.gov.uk
Report to South London Waste Partnership Joint Committee
Summary
This report provides the Joint Committee with an update on the performance of the transfer, treatment, recycling and disposal services that are procured and managed by the South London Waste Partnership on behalf of the four Partner Boroughs; the London boroughs of Croydon, Kingston, Merton and Sutton. The services covered in this report are as follows:
I. Food and green waste treatment services II. Household Reuse and Recycling Centre (HRRC) services, and III. Residual waste treatment services. IV. Dry Recyclables management
This report provides performance data for Quarters 1 and 2 of Contract Year 2026/26 i.e. 1st April to 30th September 2025.
Recommendations The Joint Committee is asked to;
● Note the latest position with the ERF residual waste treatment contract related to the recent CEMS calibration issue previously reported on (Part 4.9).
● Note the current status of the new Dry Recyclables contracts following the first 6 months of operation (Part 5),
● Comment on any aspects of the performance of the Partnership’s transfer, treatment, recycling and disposal contracts.
Background Documents Contract Performance Monitoring Reports have been presented to the SLWP Joint Committee since 22nd July 2010. The most recent report was presented at the meeting on 11th June 2025 by Simon Bussell, the SLWP Head of Contracts.
1 Agenda Item 7 Page 28
Background
1.1Food and green – The SLWP manages four green and food waste contracts on behalf of the Partner Boroughs. These contracts have been in operation since 1st September 2022 and will continue until no later than 31st March 2030. The food and green services are delivered via the following four contracts:
I. Biocollectors Ltd – receipt and treatment of food waste
II. Olleco – collection and treatment of food waste
III. Countrystyle Recycling – collection and treatment of green waste
IV. SUEZ Recycling and Recovery UK (SUEZ) – receipt, bulking, transportation and treatment of green and food waste
1.2Household Reuse and Recycling Centre (HRRC) services - the HRRC service is operated by Veolia (ES) (UK) Ltd. The contract commenced on the 1st October 2015 and includes; the management of the six HRRC sites in the SLWP region, the operation of the waste transfer station at Villiers Road, and the marketing of the recyclates collected at each of the HRRC sites. The contract has been extended and has an expiry date of 15th September 2030.
1.3Residual waste treatment contract - Viridor South London Limited (‘Viridor SL’) was awarded a contract for the treatment and disposal of residual waste in November 2012. To deliver the contract, Viridor designed, built and now operates an Energy Recovery Facility (ERF) at the Beddington Lane site in Sutton. Following the construction and commissioning period, the ERF became fully operational in March 2019. The Contract has an initial term of 25 years providing waste treatment services until 3 rd March 2044, with the potential to extend the Contract until a Long Stop Date of 5th November 2047.
1.4Dry Recyclables management contract - following procurement across 2024, there are three different companies now managing the different dry recycling streams collected by the four Boroughs. Edwards Recycling collects and manages paper and card collected by Kingston and Merton; Veolia ES (UK) Ltd manages container mix recycling collected by Kingston and Merton and Suez Recycling and Recovery manages paper / card, container mix and fully co-mingled material from Croydon and Sutton as well as Merton's fully co-mingled material. The contracts commenced on 1st April 2025 and run until 31st March 2028 with options to extend until March 2030.
2. PERFORMANCE DETAIL – FOOD AND GREEN WASTE
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow South London Waste Partnership Joint Committee at Sutton and we tell you when its next papers are published, before the meeting rather than after it.
Communications and Engagement UpdateTo Note the contents of this report and comment on any aspects of communications and engagement activities relating t...
Proposed Management Budget 2026/27To approve the 2026/27 SLWP Budget of £707k. This represents an annual cost of £177k per borough and an increase of j...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.