Swale Joint Transportation Board, Monday 9 March 2015 at 5.30pm

Highway Works Programme 2014/15

Noted Committee 1 paper

Swale Joint Transportation Board noted this item on Monday 9 March 2015. Below is the council's own wording, with the papers it was decided on.

Item532

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

To: Swale Joint Transportation Board

By: KCC Highways and Transportation

Date: 9th March 2015

Subject: Highway Works Programme 2014/15

Classification: Information Only

Summary: This report updates Members on the identified schemes approved for construction in 2014/15

1. Introduction

This report provides an update and summarises schemes that have been programmed for delivery in 2014/15.

Footway and Carriageway Improvement Schemes – see Appendix A

Drainage Repairs & Improvements – see Appendix B

Street Lighting – see Appendix C

Traffic Systems – see Appendix D

Developer Funded Works – see Appendix E

Transportation, PROW and Safety Schemes – see Appendix F

Public Rights of Way – see Appendix G

Bridge Works – see Appendix H

Member Highway Fund – see Appendix I

Conclusion

1. This report is for Members information. Contact Officers:

The following contact officers can be contacted on 03000 418181

Kirstie Williams Highway Manager (East) Alan Blackburn Swale District Manager Alan Casson Resurfacing Manager Katie Lewis Drainage Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Steve Darling/Melvyn Twycross Transportation, PROW and Safety Schemes Tony Ambrose Structures Manager Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.

Machine Resurfacing – Contact Officer Byron Lovell

Road Name Parish Extent of Works Current Status

South of Wards Hill The Broadway Minster on Sea Road to Saxon Completed Avenue Junc of Denstroude To be completed Dargate Road Dargate Lane to 500m north March/April 2015

Footway Improvement - Contact Officer Neil Tree

Extent and Road Name Parish Description of Current Status Works Sections between Main Road and Halfway Road – Programmed to Queenborough Road Queenborough Replacement of start 2nd March tarmac surface and 2015 kerbing where required. Between St George’s Primary School and Oak Lane - Mill Hill Minster on Sea Replacement of Completed tarmac surface and kerbing where required Whole Length - Replacement of Lower Road Faversham tarmac surface and Completed kerbing where required From its junction with The Meads Avenue to Knightsfield Road Sittingbourne its junction with Completed Quinton Road - Slurry Surfacing

Whole Length - Slurry Abbey Close Minster on Sea Completed Surfacing

Sections between Main Road and Queenborough Road Queenborough Halfway Road – Slurry Completed Surfacing Appendix B – Drainage Repairs & Improvements

Timescale for Location Description of Works Job Status Completion Otterham Quay Installation of new drainage Works Completed Lane system

Lower Hartlip Dredge Pond and bank Works Completed Road, Hartlip protection

Installation of new Tunstall Road, soakaways and additional Works Completed Tunstall drainage

Deans Bottom, Installation of new gullies and Works Completed Bredgar soakaways

Installation of new South Street, soakaways and additional Works on going Selling drainage

Scragged Oak Installation of new soakaway Works Completed Road, Detling and deep bore Slough Road, Installation of Soakaways Works Completed Rodmersham Warden Road, Installation of new pond Works Programmed March 2015 Eastchurch Installation of new Boxted Lane, Investigation and Design soakaways and additional March 2015 Newington underway drainage

Installation of sumpless gullies discharging to catchpit High Street, in layby to ease future Works Completed Eastchurch maintenance and provide improved system flow capacity

Claxfield Road, Investigation and Design Installation of french drain March 2015 Lynstead underway Appendix C – Street Lighting

Following Structural testing, this year’s column replacement budget will be used to replace columns deemed high risk.

Street Lighting Column Replacement – Contact Officer Sue Kinsella

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Highway Works Programme 2014/15Report 122 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

16 of 25 attended
MB
Mr Mike BaldockCommittee Member, present
AB
Alan BlackburnCouncil Staff, in attendance
AB
Andy BoothCommittee Member, present as substitute
AB
Mr Andrew BowlesCommittee Member, present
LB
Mr Lee BurgessCommittee Member, present
AC
Mr Adrian CrowtherCommittee Member, present
TG
Mr Tom GatesChair, present
RG
Ruth GoudieCouncil Staff, in attendance
JH
Joanne HammondSecretary, in attendance
GH
Gill HarrisOfficer, in attendance
MA
Miss Angela HarrisonCommittee Member, present
MH
Councillor Mike HendersonCommittee Member, in attendance

All 25 on the meeting page

On this subject at Swale

Search all
  1. Highway Works Programme 2014/15This decision
  2. Verbal update from National Highways on the M2 Junction 5 Stockbury WorksNoted
  3. Letter from Department for Transport RE Junction 5 M2/A249 Highway Improvement WorksNoted
  4. Highways Forward Works Programme: 2021/22 and 2022/23Noted
  5. Highway Works ProgrammeNoted
  6. Highway Works ProgrammeNoted

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies