CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swale Borough Council
Swale Joint Transportation Board, Monday 11 September 2017 at 5.30pm

Highway Works Programme

Noted Committee 1 paper

Swale Joint Transportation Board noted this item on Monday 11 September 2017. Below is the council's own wording, with the papers it was decided on.

Item210

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

To: Swale Joint Transportation Board

By: KCC Highways and Transportation

Date: 11th September 2017

Subject: Highway Works Programme 2017/18

Classification: Information Only

Summary: This report updates Members on the identified schemes approved for construction in 2017/18

1. Introduction

This report provides an update and summarises schemes that have been programmed for delivery in 2017/18

Footway and Carriageway Improvement Schemes – see Appendix A

Drainage Repairs & Improvements – see Appendix B

Street Lighting – see Appendix C

Traffic Systems – see Appendix D

Developer Funded Works – see Appendix E

Transportation, PROW and Safety Schemes – see Appendix F

Public Rights of Way – see Appendix G

Bridge Works – see Appendix H

Member Highway Fund – see Appendix I

Economic Development – Appendix J

Conclusion

1. This report is for Members information. Contact Officers:

The following contact officers can be contacted on 03000 418181

Kirstie Williams Highway Manager (Mid) Alan Blackburn Swale District Manager Alan Casson Road & Footway Asset Manager Kevin Gore Interim Drainage Manager Paul Hopkins Interim Structures Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Andrew Hutchinson Transportation, PROW and Safety Schemes Nick Abrahams Economic Development Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.

Machine Resurfacing – Contact Officer Byron Lovell

Road Name Parish Extent of Works Current Status

Programmed 22nd Watsons Hill Sittingbourne Full length September

Junction with Barton To be programmed B2008 Minster Road Minster Hill Drive in October Junction with Tunstall To be programmed Woodstock Road Tunstall Road and Cromer in October Road A299 Herne Hill Slip Overbridge and Hernhill Completed Road on-slip at Sandhole

Power Station Road A250 Halfway Rd Halfway Completed Roundabout Footway Improvement - Contact Officer Neil Tree

Road Name Parish Extent and Current Status Description of Works Between No’s. 2 and Chilton Avenue Sittingbourne 72 Chilton Avenue. Completed (Footway Reconstruction) From the junction with the A2 London Road To be programmed A251 Ashford Road Faversham to O/S No. 91 Ashford for November 2017 Road. (Footway Protection). To be programmed Entire length for Ashtead Drive Bapchild (Footway Protection). November/December 2017 From the junction with To be programmed Ashtead Drive to the for School Lane Bapchild junction with November/December St.Laurence Close. 2017 (Footway Protection). To be programmed Entire length for St Lawrence Close Bapchild (Footway Protection). November/December 2017 To be programmed Entire length for Wihtred Road Bapchild (Footway Protection). November/December 2017 Surface Treatments - Contact Officer Jonathan Dean

Micro Surfacing Road Name Parish Extent of Works Current Status

Addington Rd From Ufton Road To Programmed for the Sittingbourne Park Road 05/09/2017 for 1 day

Oare Road To Cole Programmed for the The Street Oare Gates Road 08/09/2017 for 1 day

Selling Road To Perry Wood Chilham / Perry Wood Completed Perrywood

Grove Road To Perry Perry Wood Chilham / Perry Wood Completed Wood

Elm Lane Minster Whole Road Completed

B2008 Back Lane & Minister Whole Road To be programmed High Street Programmed for the Rodmersham Green / Rodmersham Whole Road 06/09/2017 for 2 Bottles Lane days From Kettle Hill To Programmed for the Stalisfield Road Rodmersham Haywards Hill 07/09/2017 for 1 day

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Highway Works ProgrammeReport 140 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

16 of 26 attended
SA
Councillor Sarah AldridgeVisiting Councillor, in attendance
DC
David Colin AustinParish Councillor, apologies
MB
Councillor Mike BaldockCommittee Member, present
CB
Councillor Cameron BeartCommittee Member, present
AB
Alan BlackburnOfficer, in attendance
AB
Mr Andy BoothKent County Councillor, present
AB
Mr Andrew BowlesVice-Chair, present
DC
Councillor Derek ConwayCommittee Member, present
NF
Nikola FloodgateOfficer, in attendance
SG
Mrs Sue GentKent County Councillor, present
IG
Ian GrigorOfficer, in attendance
MH
Councillor Mike HendersonVisiting Councillor, in attendance

All 26 on the meeting page

On this subject at Swale

Search all
  1. Highway Works ProgrammeThis decision
  2. Verbal update from National Highways on the M2 Junction 5 Stockbury WorksNoted
  3. Letter from Department for Transport RE Junction 5 M2/A249 Highway Improvement WorksNoted
  4. Highways Forward Works Programme: 2021/22 and 2022/23Noted
  5. Highway Works ProgrammeNoted
  6. Highway Works ProgrammeNoted

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies