CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swale Borough Council
Swale Joint Transportation Board, Monday 19 December 2016 at 5.30pm

Highway Works Programme

Noted Committee 1 paper

Swale Joint Transportation Board noted this item on Monday 19 December 2016. Below is the council's own wording, with the papers it was decided on.

Item1088

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

To: Swale Joint Transportation Board

By: KCC Highways and Transportation

Date: 19th December 2016

Subject: Highway Works Programme 2016/17

Classification: Information Only

Summary: This report updates Members on the identified schemes approved for construction in 2016/17

1. Introduction

This report provides an update and summarises schemes that have been programmed for delivery in 2016/17

Footway and Carriageway Improvement Schemes – see Appendix A

Drainage Repairs & Improvements – see Appendix B

Street Lighting – see Appendix C

Traffic Systems – see Appendix D

Developer Funded Works – see Appendix E

Transportation, PROW and Safety Schemes – see Appendix F

Public Rights of Way – see Appendix G

Bridge Works – see Appendix H

Member Highway Fund – see Appendix I

Conclusion

1. This report is for Members information. Contact Officers:

The following contact officers can be contacted on 03000 418181

Kirstie Williams Highway Manager (Mid) Alan Blackburn Swale District Manager Alan Casson Road & Footway Asset Manager Kevin Gore Interim Drainage Manager Paul Hopkins Interim Structures Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Andrew Hutchinson Transportation, PROW and Safety Schemes Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.

Machine Resurfacing – Contact Officer Byron Lovell

Road Name Parish Extent of Works Current Status

Dawes Rd/ Courtenay Rd Dunkirk Various locations Completed

Grovehurst Road and B2005 Grovehurst Rd Sittingbourne Completed Mill Way Roundabouts

Footway Improvement - Contact Officer Neil Tree

Road Name Parish Extent and Description Current Status of Works

Sections of footway from its junction with Roseleigh Minterne Avenue Sittingbourne Road to its junction with Completed Woodside Gardens. (Footway Reconstruction).

North side only, from its junction with Alma Road to the change in surface Marine Parade Sheerness Completed type opposite No. 16 Marine Parade. (Footway Reconstruction)

South side only, From its junction with Alma Road Marine Parade Sheerness to its junction with Completed Richmond Street. (Footway protection treatment).

Entire Length Wards Hill Road Minster (Footway protection Completed treatment). Entire Length Shurland Avenue Sittingbourne (Footway protection Completed treatment). Surface Treatments - Contact Officer [name removed] Name Parish Extent of Works Current Status

Surface Dressing Sheldwich Badlesmere Newhouse Lane to Dayton Ashford Road Completed Leaveland Road and Badlesmere Green to Shottenden Road

Micro Surfacing Castle Eurolink Way Sittingbourne Completed Road to Mill Way

Micro Surfacing Hearts Delight & Bannister From The Street to Wrens Borden Completed Hill Road including Hearts Delight

Surface Dressing Western London Road Ospringe Completed Link to Faversham Road

Micro Surfacing North Street Queenborough Chalk Road to Coronation Completed Crescent

Surface Dressing Brielle Queenborough Road Queenborough Completed Way to Lower Road

Surface Dressing Velham Staplehurst Road Sittingbourne Completed Drive to railway bridge

Micro Surfacing Admiral Swanton Street Bredgar Road to Bashford Barn Completed Lane Surface Dressing Throwley Road Throwley Faversham Road to Loose Completed Down Road

Surface Dressing Bysing Western Link Faversham Completed Wood Road to Oare Road

Micro Surfacing Woollett Road Sittingbourne Completed Whole length Appendix B – Drainage Repairs & Improvements

Drainage Repairs & Improvements - Contact Officer Kevin Gore

Road Name Parish Description of Works Current Status

Works Programmed Hartlip Hill Newington Installation of new Drainage System for 1st Dec 16

Replacement of existing Drainage Maidstone Borden System Works Complete Road

Installation of new Drainage Gore Road Bredgar system Works Complete

Appendix C – Street Lighting

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Highway Works ProgrammeReport 123 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 29 attended
DC
David Colin AustinParish Councillor, present
MB
Mr Mike BaldockKent County Councillor, present
CB
Councillor Cameron BeartCommittee Member, present
TB
Tracey BeattieOfficer, in attendance
AB
Alan BlackburnCouncil Staff, in attendance
AB
Mr Andrew BowlesChair, present
LB
Mr Lee BurgessKent County Councillor, apologies
MC
Martyn CassellOfficer, in attendance
MC
Councillor Mike CosgroveVisiting Councillor, in attendance
AC
Mr Adrian CrowtherKent County Councillor, apologies
RD
Councillor Richard DarbyVisiting Councillor, in attendance
JG
Councillor June GarradCommittee Member, present

All 29 on the meeting page

On this subject at Swale

Search all
  1. Highway Works ProgrammeThis decision
  2. Verbal update from National Highways on the M2 Junction 5 Stockbury WorksNoted
  3. Letter from Department for Transport RE Junction 5 M2/A249 Highway Improvement WorksNoted
  4. Highways Forward Works Programme: 2021/22 and 2022/23Noted
  5. Highway Works ProgrammeNoted
  6. Highway Works ProgrammeNoted

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies