Resolved
(1) That the report be noted.
Swale Joint Transportation Board noted this item on Monday 6 March 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted.
To: Swale Joint Transportation Board
By: KCC Highways and Transportation
Date: 6th March 2017
Subject: Highway Works Programme 2016/17
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction in 2016/17
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2016/17
Footway and Carriageway Improvement Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Traffic Systems – see Appendix D
Developer Funded Works – see Appendix E
Transportation, PROW and Safety Schemes – see Appendix F
Public Rights of Way – see Appendix G
Bridge Works – see Appendix H
Member Highway Fund – see Appendix I
Conclusion
1. This report is for Members information. Contact Officers:
The following contact officers can be contacted on 03000 418181
Kirstie Williams Highway Manager (Mid) Alan Blackburn Swale District Manager Alan Casson Road & Footway Asset Manager Kevin Gore Interim Drainage Manager Paul Hopkins Interim Structures Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Andrew Hutchinson Transportation, PROW and Safety Schemes Appendix A – Footway and Carriageway Improvement Schemes
The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.
Machine Resurfacing – Contact Officer Byron Lovell
Road Name Parish Extent of Works Current Status
None
Footway Improvement - Contact Officer Neil Tree
Road Name Parish Extent and Description Current Status of Works
None
Surface Treatments - Contact Officer [name removed] Name Parish Extent of Works Current Status
Surface Dressing Sheldwich Badlesmere Newhouse Lane to Dayton Ashford Road Completed Leaveland Road and Badlesmere Green to Shottenden Road
Micro Surfacing Castle Eurolink Way Sittingbourne Completed Road to Mill Way
Micro Surfacing Hearts Delight & Bannister From The Street to Wrens Borden Completed Hill Road including Hearts Delight
Surface Dressing Western London Road Ospringe Completed Link to Faversham Road
Micro Surfacing North Street Queenborough Chalk Road to Coronation Completed Crescent
Surface Dressing Brielle Queenborough Road Queenborough Completed Way to Lower Road
Surface Dressing Velham Staplehurst Road Sittingbourne Completed Drive to railway bridge
Micro Surfacing Admiral Swanton Street Bredgar Road to Bashford Barn Completed Lane Surface Dressing Throwley Road Throwley Faversham Road to Loose Completed Down Road
Surface Dressing Bysing Western Link Faversham Completed Wood Road to Oare Road
Micro Surfacing Woollett Road Sittingbourne Completed Whole length
Appendix B – Drainage Repairs & Improvements
Drainage Repairs & Improvements - Contact Officer Katie Lewis
Road Name Parish Description of Works Current Status
Hartlip Hill Newington Installation of new Drainage System Works Complete
Replacement of existing Drainage Maidstone Borden System Works Complete Road
Installation of new Drainage Gore Road Bredgar system Works Complete
Appendix C – Street Lighting
Following Structural testing, this year’s column replacement budget will be used to replace columns deemed high risk.
Street Lighting Column Replacement – Contact Officer Sue Kinsella
Road Name Parish Description of Works Status
12 x COMPLETED Remaining 3 columns need to be done under a road closure Replacement of 15 no street lights Winstanley Road Sheerness complete with LED Lanterns Road closure currently being re- programmed & expected for completion by the end of March 2017
8 x COMPLETED Replacement of 9 no street lights London Road Newington complete with LED Lanterns Remaining 1 Column has overgrown vegetation & traffic management issue which requires further investigation.
The job is currently being programmed & expected for completion by the end of March 2017
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highway Works ProgrammeReport | 180 KB | DownloadRead as text |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.