CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swale Borough Council
Swale Joint Transportation Board, Monday 18 December 2017 at 5.30pm

Progress Update Report

Noted Committee 1 paper

Swale Joint Transportation Board noted this item on Monday 18 December 2017. Below is the council's own wording, with the papers it was decided on.

Item416

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

SBC - Swale Borough Council Updated November 2017 KCC - Kent County Council Highway Services SWALE JOINT TRANSPORTATION BOARD (JTB)

Updates are in italics

Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB

235/09/13 A2 / A251 Junction, KCC (1) That both proposed traffic improvements KCC are carrying out revised traffic modelling, around Faversham (Annex 1 and 2 in the report), the inclusion of the two options of roundabout or traffic lights, in order consideration of the junction of The Mall and to further inform the decision of which construction the A2, plus the option of ‘no change’, be option KCC would want to pursue. approved for the purposes of a wider public consultation and the results of the Discussions are still ongoing with regards localised consultation brought back to the JTB at a developments, including Perry Court, and S106 later date. contributions. Subsequent related KCC (1) That Option B (roundabout) be progressed Minute No. 72/06/14 as the preferred option for the A2/A251 A2/A251 Junction, junction, Faversham. Faversham Highway Improvement Scheme 218/09/14 Lower Road KCC (1) That the preferred option for the Lower KCC – Report included in December JTB Junction with Road junction with the Barton Hill Drive Barton Hill Drive, junction be a small roundabout, rather than a Cllr Macdonald emailed regarding the Isle of Sheppey mini-roundabout. positioning of the junction ahead of meeting with Parish Council.

Cllrs Booth, Beart and Mcdonald emailed on 21 September to arrange a meeting where any questions about the project could be discussed but has not had a response to date. 383/12/15 Pedestrian Crossing KCC (1) A feasibility study to be carried out into A brief was issued to estimate the costs associated at South Avenue highway improvements at the site. with producing an options report for this study. Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB

School, (2) A report on the conclusions of the Sittingbourne feasibility study to be presented to a future Following instruction, from the then County Member, JTB. the study commission was discontinued. (3) The cost of funding for the feasibility study to come from a Member’s grant. Report requested by Cllr Wright has been deferred until LGF funding levels are confirmed. 564/03/16 Public Session (1) That a working group be set-up to KCC – discussion at December JTB – see below examine how a 20mph limit could be 1079/12/166 implemented in Faversham and then rolled- out Borough-wide. 869/09/16 Kent County Council KCC (1) That the report be noted and delegated LTP4 received over 500 consultation responses and a Local Transport Plan powers be given to the Chairman, the Vice- Consultation Report summarising the results was 4: Delivering Growth Chairman and the Cabinet Member for presented to KCC's Environment and Transport without Gridlock Environment and Rural Affairs, following Cabinet Committee (ETCC) in January. The Report is (2016-2031) meetings with the Economy and Community available at www.kent.gov.uk/localtransportplan. (Consultation Draft) Services Manager and Spatial Planning LTP4 is subsequently being revised and the intention Manager, to report back to the consultation is to return to ETCC in March followed by adoption by with issues that the Board had raised. County Council later this year.

Cllr Whiting commented that the report does not reflect Swale JTB’s response to the consultation. Information about the consultation and its outcomes can be found at https://consultations.kent.gov.uk/consult.ti /LTP4/consultationHome, with links under the headings “Update June 2017 - You said, We did.” and “Update January 2017 – Consultation Response Report” Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Progress Update ReportReport 106 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 24 attended
DC
David Colin AustinParish Councillor, present
MB
Councillor Mike BaldockCommittee Member, present
CB
Councillor Cameron BeartCommittee Member, present
AB
Alan BlackburnOfficer, in attendance
AB
Mr Andy BoothKent County Councillor, in attendance
AB
Mr Andrew BowlesVice-Chair, apologies
DC
Councillor Derek ConwayCommittee Member, present
SG
Mrs Sue GentKent County Councillor, in attendance
MH
Councillor Mike HendersonVisiting Councillor, in attendance
AH
Mr Antony Hook - Please see Kent County Council WebsiteKent County Councillor, apologies
AH
Alan HortonVisiting Councillor, in attendance
JH
Councillor James HuntCommittee Member, present

All 24 on the meeting page

On this subject at Swale

Search all
  1. Progress Update ReportThis decision
  2. Internal Audit & Assurance Progress Report 2025/26Noted
  3. External Audit Progress ReportNoted
  4. Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction SittingbourneNoted
  5. Progress Update ReportNoted
  6. Progress Update ReportNoted

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies