Resolved
(1) That the report be noted.
Swale Joint Transportation Board noted this item on Monday 4 March 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted.
SBC - Swale Borough Council Updated November 2018 KCC - Kent County Council Highway Services SWALE JOINT TRANSPORTATION BOARD (JTB)
Updates are in italics Reported to this meeting
Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB
235/09/13 A2 / A251 Junction, KCC (1) That both proposed traffic improvements Report being presented at Swale JTB March 2019 Faversham (Annex 1 and 2 in the report), the inclusion of consideration of the junction of The Mall and the A2, plus the option of ‘no change’, be approved for the purposes of a wider public consultation and the results of the consultation brought back to the JTB at a later date. Subsequent related KCC (1) That Option B (roundabout) be progressed Minute No. 72/06/14 as the preferred option for the A2/A251 A2/A251 Junction, junction, Faversham. Faversham Highway Improvement Scheme 218/09/14 Lower Road Junction KCC (1) That the preferred option for the Lower Scheme plan and details reported to later JTBs - with Barton Hill Drive, Road junction with the Barton Hill Drive Roundabout Now Constructed. Isle of Sheppey junction be a small roundabout, rather than a Chosen roundabout has benefit of being generally off mini-roundabout. line and can be constructed with minimal impact on the traffic. 1079/12/16 Update on the 20’s Third- (1) That the JTB supports the Kent County Council had another very productive 6 Plenty for Faversham party recommendations put forward by the Working meeting with the 20’s Plenty for Faversham group on Working Group sche Group, and officers submit a report to the 18 January 2019. The group (Amanda Russell), me next JTB meeting on the feasibility of the along with Cllr David Simmons and Phil Jones met to proposals. review the possible scope of a town-wide 20mph (2) That the officers’ report considers how speed limit. Previously, the County Council had proposals might be rolled-out across the agreed that around 60% of the roads in Faversham Borough. were suitable for a signed-only 20mph limit however officers had strong reservations about the remaining Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB
roads and the likelihood of compliance being achieved.
The County Council has a statutory duty to promote road safety and act to reduce the likelihood of road casualties from occurring. In locations where existing speeds are well in excess of 24mph, it is the County Council’s view that additional traffic calming is first required to reduce traffic speed in order to mitigate the risk of new road collisions and ensure that speed limits are realistic and respected. This was considered to make the scheme as a whole undeliverable as Faversham Town Council and 20’s Plenty for Faversham do not have access to considerable amounts of funding and they do not want to accept a partial town-wide scheme.
Having discussed these specific roads in more detail again at the meeting, the County Council and the group have found a positive resolution and way forward. The County Council has agreed that the majority of the roads requested can be supported through cost effective traffic calming measures such as lining amendments, the provision of cycle facilities and changes to on-street parking bays for example. These measures are being looked at by the group with a view to agreeing schemes to facilitate a 20mph limit on these roads.
We agreed there is a need for post-scheme evaluation to measure the effects of any scheme.
There are still a small number of roads that will not be Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Progress Update ReportReport | 104 KB | DownloadRead as text |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.