Resolved
(1) That the report be noted.
Swale Joint Transportation Board noted this item on Monday 4 March 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted.
A2/A251 Update
To: (Swale Joint Transportation Board – 4th March 2019)
Main Portfolio Area: Growth, Environment & Transport
By: Simon Jones, Director of Highways, Transportation & Waste
Classification: For Information
Ward: Watling Division: Faversham
Summary: Update report on the completed studies of the A2/A251 and A2/B2041 junctions
1.0Introduction and Background
1. Introduction
1.1This report is intended to provide members with an update on studies that the County Council have commissioned for the A2/A251 and A2/B2041 junctions. Two studies have been completed last year, one evaluating the performance of the previously presented roundabout and traffic light scheme designs in respect of the cumulative local plan and recently committed growth. The second study looked at the feasibility of evolving design options that would cater for full local plan build out and growth up to 2031.
2.0Base conditions survey
2.1Manual classified turning counts were completed at the junctions of The Mall/A2 and A251/A2 on Tuesday 13th March 2018 from 7AM. Automatic Traffic Counts were also completed on the A251 and A2, close to the junction, between Friday 23rd February and Tuesday 13th March 2018. Data for the weekends and those dates in February that were affected by wintery weather were removed so that the evidence represented the average weekday flows. 2.2 The AM and PM peaks for the junctions were identified as 07:15 to 08:15 and 16:30 to 17:30 respectively. 2.3 The following table shows the current flows on the A2 and A251: 2018 A2 E/bound A2 W/bound A251 N/bound A251 S/bound AM 1185 1121 457 666 PM 1110 1109 493 481 2.4 The results above have been compared to those submitted by the Perry Court application and counts completed at the same junction in 2013. 2013 A2 E/bound A2 W/bound A251 N/bound A251 S/bound AM 1129 1158 457 552 PM 1201 1167 493 425 2.5 The analysis therefore shows that the A2 has had a slight increase in the AM peak and a slight decrease in the PM compared to the 2013 data. Similarly, a review comparing the A251 flows has been undertaken. This comparison showed that no change had occurred on the Northbound movements despite continued growth in Ashford. In the AM a 7% increase has occurred on the Southbound A251 traffic flows compared to the 2013 data. The PM A251 Southbound flows are again however, only showing very slight increases. 2.6 Unsurprisingly the analysis confirmed that all arms of the A2/A251 junction, other than the A2 Eastern arm, are operating over capacity in the AM peak with the A251 showing worst performance. The B2041/A2 junction was largely showing to operate within capacity other than right turn movements into the B2041 in the PM where the demand is grater that the available space in the right turn lane. 2.7 In summary, the analysis shows that flows of traffic for 2018 are very similar to those that occurred in 2013 with negligible growth occurring. This is not altogether unsurprising as whilst planning consents have been granted, build out of those sites is very limited.
3.0Future conditions study of the previously proposed roundabout and traffic light scheme
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
A2/A251 JunctionReport | 89 KB | DownloadRead as text |
PDF |
A2 A251: 4300161-000-01 Rev 1Appendix A | 332 KB | Download |
PDF |
A2 A251 Revised Signal Layout 1 to 250Appendix B | 272 KB | Download |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.