Resolved
Approved Conditions: 1. With the exception of the detailed matters referred to by the conditions of this consent, the development hereby approved shall be carried out in accordance with the details shown on plan reference DDS603 /01 REV C received on 3.2.2011. 2. This permission shall be for a limited period only expiring on 18.04.2013 and the use hereby authorised by this permission shall be discontinued, with all associated structures removed, on or before this date 3. Prior to its installation details of the colour and fabric for the roof covering of the weather canopy shall be submitted to, and approved in writing by the Local Planning Authority. The canopy, and any subsequent replacement roof coverings, shall be implemented in accordance with such approved details. 4. Before the development hereby approved is brought into use all plant and machinery shall be enclosed with sound insulating material in accordance with a scheme previously agreed in writing by the Local Planning Authority. 5. The use hereby permitted shall not be carried out except during the following hours: · 09:00 to 18:00 - Monday to Saturday · 10:00 to 16:00 - Sunday. 6. Prior to the commencement in use of the site for car washing, a scheme detailing the provision of screening to reduce water overspray to surrounding properties and the pedestrian footpath alongside Mesnes Road, shall be submitted to and approved in writing by the Local Planning Authority. Such approved screening shall be erected in accordance with the approved scheme prior to the commencement of car washing activities, and shall thereafter be retained 7. Prior to the use of the development commencing a petrol/oil interceptor shall be installed on the site in accordance with a scheme previously approved in writing by the Local Planning Authority. 8. Prior to the commencement in use of the site, details of the methods of surface water and foul water drainage from the site shall be submitted to and approved in writing by the Local Planning Authority. The submitted drainage scheme must ensure that all foul drainage, including surface water run-off from vehicle washing areas shall be connected to the foul sewers, and only uncontaminated surface water shall be connected to the surface water system. Drainage arrangements shall be installed in accordance with the approved details prior to the commencement in car washing activities. 9. Prior to the commencement in use of the site for car washing activities, a scheme of safety and security measures to prevent public access to the existing access ... view the full minutes text for item 16.