Resolved
To Approve with Conditions Representations had been received in relation to: the Pendleton fault running through the site; an ongoing investigation by the Environment Agency; and traffic issues. Conditions: 1. The development hereby approved shall be carried out in accordance with the details indicated on plan reference 1724-PL-01 Rev A 1724-PL-03 Rev C 1724-PL-04 Rev A 1724-PL-05 1724-PL-06 Rev A 1724-PL-07 Rev A 1724-PL-08 Rev A 1724-PL-09 Rev A 1724-PL-10 1724-PL-11 170523 Tree Survey received on 05.07.2017 2. Prior to the commencement in the construction of any external walls, particulars or samples of the materials to be used for the external walls and roof shall be submitted to and approved in writing by the Local Planning Authority. The development shall be constructed only in full accordance with the approved materials. 3. The use of any dwelling hereby approved shall not commence until all screen walls/fences associated with that property have been installed in accordance with details previously submitted to and approved in writing by the Local Planning Authority. 4. Prior to the commencement of any part of the development hereby approved, the following information shall be submitted to and approved in writing by the Local Planning Authority: (i) a full site survey showing: - the datum used to calibrate the site levels - levels along all site boundaries - levels across the site at regular intervals - floor levels of adjoining buildings (ii) full details of the proposed finished floor levels of all buildings and proposed levels for external areas. The development shall be implemented only in full accordance with the approved details 5. Prior to the construction of any dwelling hereby approved, a detailed mitigation strategy which includes appropriate engineering solution to prevent any further movement of the fault line / fissures affecting the surface stability of the site shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in full accordance with the approved scheme. 6. No part of the development hereby approved shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall identify, on a plan, the access point to be used for construction traffic connected with each stage of the development hereby approved. The CEMP shall specifically provide for all traffic connected with waste removal, demolition, site investigation, site preparation, the delivery of ... view the full minutes text for item 19.