CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Wigan Metropolitan Borough Council
Planning Committee, Tuesday 6 October 2020 at 4.00pm

Planning related items

Approved Planning 2 papers

Planning Committee approved this item on Tuesday 6 October 2020. Below is the council's own wording, with the papers it was decided on.

Item22

Resolved

Approved Representations of objection were received in relation to the bridge which gave access to the site not being strong enough to carry construction traffic; potential damage to properties and the road surface; detrimental impact on ecology; insufficient drainage system; loss of greenfield site and damage to protected trees; loss of light, overshadowing and overlooking; loss of views; subsidence; inaccurate cross-section plan; coal mining legacy; and a restrictive covenant on the land. Representations in support were received in relation to improvement to the area; the dwelling making an ideal family home; the bridge capability of carrying vehicles to the site; and the lack of restrictive covenant on the land. Conditions: 1. Other than in respect of the elements excluded by Condition 17, the development hereby approved shall be carried out in accordance with the details indicated on the plans referenced: - 946-MDA-SLP-Rev B - 946-MDA-PL1 Rev C - 2016-04 - 2016-05 - 2016-06 - Treatment Plant 2. Prior to the commencement in the construction of any external walls, particulars or samples of the materials to be used for the external walls and roof shall be submitted to and approved in writing by the Local Planning Authority. The development shall be constructed only in full accordance with the approved materials. 3. No part of the development hereby approved shall commence until a scheme in the form of a Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing by, the Local Planning Authority. The scheme shall include details for the methods to be employed to monitor and control impacts arising during the construction phase from construction traffic, noise, dust and vibration. The development shall be carried out in full accordance with the approved scheme at all times. 4. Prior to first occupation of the dwellinghouse hereby approved, all screen walls/fences associated with the building shall be installed in accordance with details previously submitted to and approved in writing by the Local Planning Authority. 5. Notwithstanding the details shown on the approved plans, no additional windows shall be inserted at any time into any external elevation or roof plane, nor shall existing window openings be enlarged or altered in position. 6. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, (or any Order revoking or re-enacting that Order with or without modification), no development within Class A, B and E of Schedule 2 Part 1 shall be carried out unless permission is granted by the Local Planning Authority. 7. Any hard surface shall be made of porous materials, or provision shall ... view the full minutes text for item 22.
Word for word from the decision Wigan published for this meeting. Source: democracy.wigan.gov.uk

Follow this further

Built from Wigan's papers

What the report saysPro

Report to Planning Committee

THE LOCAL GOVERNMENT (ACCESS TO INFORMATION) ACT 1985

LIST OF BACKGROUND PAPERS FOR PLANNING AND ADVERTISEMENT APPLICATIONS ON THE AGENDA OF THE PLANNING COMMITTEE

The Background Papers for the Planning and Advertisement Applications are:

1. The Appropriate Development Information Folder: This is a file with the same reference number as that shown on the Agenda for the Application. It contains the following documents:

(a) the application forms; (b) plans of the proposed development; (c) site plans; (d) certificate relating to ownership of the site; (e) consultation letters and replies to and from statutory consultees and bodies; (f) letters and documents from interested parties; (g) memoranda of consultation and replies to and from Departments of the Council.

2. Any previous Development Information Folders referred to in the Schedule or Reports in item 2 on the Agenda for the particular application or in the Development Information Folder specified above.

3. The Core Strategy of the Wigan Local Plan.

4. The Greater Manchester Joint Waste Development Plan Document, part of the Wigan Local Plan.

5. The Greater Manchester Minerals Plan, part of the Wigan Local Plan.

6. The Replacement Unitary Development Plan: Adopted April 2006 minus policies R1, R1A and EM1F which have not been saved as part of the Development Plan, the other policies which have been replaced by the Core Strategy (listed in Appendix A of that document), the waste management policies which have been replaced by the Greater Manchester Joint Waste Plan, and the minerals policies that have been replaced by the Greater Manchester Minerals Plan.

7. Applications with Background Papers additional to those specified in 1 to 6 above are specified in the individual reports. These documents may be inspected by contacting the case officer or viewing the Council’s web site: http://kinnear.wigan.gov.uk/planapps/

Marie Bintley Assistant Director Growth and Housing CRITERIA FOR SITE VISITS AS AGREED 8 FEBRUARY 1994 AND AMENDED ON 12 SEPTEMBER 2012

Site visits can be requested by officers, a member representing the relevant ward, or a member of the Planning Committee. One of the following criteria must be established to justify a site visit:

(a) The impact of the development is particularly difficult to visualise and where plans, drawings or photographs would not provide sufficient clarity;

(b) The proposal is particularly contentious;

(c) The proposal is a significant development in the green belt;

(d) Proposals which relate to new or novel forms of development.

Site visit requests will only usually be appropriate when one of the above factors applies, or where exceptional circumstances apply.

Site visits should not be undertaken to defer difficult decisions on controversial applications, or when applicants, objectors or constituents request them without good planning reasons.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Planning related items:Report 191 KB DownloadRead as text
PDF
Report Index pageReport 170 KB Download

At this meeting

Whole meeting
21MinutesOn the agenda
22Planning related itemsThis decision
23Planning White PaperDecided

Who was there

14 of 22 attended
SH
Councillor Stephen HellierChairman, present
SJ
Councillor Susan June GreensmithVice-Chair, present
BC
Councillor Bill ClarkeCommittee Member, absent
AF
Councillor Andrew Francis CollinsonCommittee Member, present
SL
Councillor Steven Lyn EvansCommittee Member, present
SA
Councillor Stuart Andrew GerrardCommittee Member, present
JH
Councillor John HardingCommittee Member, present
JH
Councillor John HiltonCommittee Member, present
KH
Councillor Kathleen HoultonCommittee Member, present
PT
Councillor Paul Terence KennyCommittee Member, present
MM
Councillor Michael McLoughlinCommittee Member, present
GM
Councillor Gena MerrettCommittee Member, present

All 22 on the meeting page

On this subject at Wigan

Search all
  1. Planning related itemsThis decision
  2. Planning Related ItemsApproved
  3. Planning Related ItemsApproved
  4. Planning Related ItemsApproved
  5. Planning Related ItemsRefused
  6. Planning Related ItemsApproved

More from Wigan Planning Committee

All decisions
MeetingDecisionOutcome
3 Sep 2026 A/25/099558/FULL - Erection of detached dwelling, formation of new shared vehicular access and alterations to existing driveway, following demolition of existing garage.Approved Vote: In Favour (of Approval) 9 Against (Approval) 0 Abstain 1 The Committee approve the planning applicatio... Approved Open
4 Aug 2026 A/26/100488/FULL - Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd's hut, gazebo and associated landscape works (Retrospective application).Approved Vote: In Favour (of Approval) 13 Against (Approval) 1 Abstain 0 The Committee approve the planning applicati... Approved Open
7 Jul 2026 A/26/100333/FULL - Erection of a coffee shop drive-thru unit (Sui Generis) with associated landscaping, supporting infrastructure and engineering works.Approved Vote: In Favour (of Approval) 11 Against (Approval) 1 Abstain 1 The Committee approve the planning applicati... Approved Open
7 Jul 2026 A/26/100770/FULL - Conversion of existing premises (Use Class E) to provide two commercial units within Use Class E at ground floor, with new shopfronts and alterations to fenestration, together with two self-contained one-bed flats at first floor (Use Class C3).Approved Vote: In Favour (of Approval) 12 Against (Approval) 1 Abstain 0 The Committee approve the planning applicati... Approved Open
14 Apr 2026 A/25/09945/MAJOR - Change of use of Haigh Hall to a mixed-use cultural venue comprising art galleries, education suite, event spaces, restaurant/café, retail, office and bedroom accommodation, together with a rooftop extension to form a barApproved Vote: In Favour (of Approval) 11 Against (Approval) 0 Abstain 1 The Committee approve the planning applicati... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies