Resolved
Approved Representations had been received in relation to the inability to view plans in the Planning Office; lack of consultation; the viability appraisal not being made public; closure of a public right of way; loss of recreational space; the adjacent development site didn’t provide public open space or play areas; unacceptable landscaping and ecological impacts; the land being designated as safeguarded and should not be built on; and travellers access the park on the opposite side of Wigan Road. Conditions: 1. The development hereby approved shall be carried out in accordance with the details. The development hereby approved must be begun not later than the expiration of three years beginning with the date of this permission. 2. The development hereby approved shall be carried out in accordance with the details indicated on drawing and document references: - Location Plan (2043/LP 06 A); - Proposed Site Layout (2043/SL 01 Revision K); - Street Scenes (2043/SS 05 E); - Cross Sections (2043/CS 07 C); - Boundary Treatment Plan (2043/BT 03 Revision C); - Facing Materials Layout (2043/FML 04 Revision F); - Surface Materials Layout (2043/SM 02 Revision E); - Beckwood (2043.BEC); - Beckwood (Render) (2043.BEC.R); - Blackwood (2043.BLA); - Blackwood (Render) (2043.BLA.R); - Eaton (2043.EAT); - Eaton (Render) (2043.EAT.R); - Hazelwood (2043.HAZ); - Hazelwood (Render) (2043.HAZ.R); - Masterton (2043.MAS); - Masterton (Render) (2043.MAS.R) - Overton (Pair) - Village Range (2043.OVE); - Landscape Layout (TPM Landscape 3815-101-E); - Planting Plan (TPM Landscape 3815-201-C); - Planting Plan (TPM Landscape 3815-202-C); - Site Access Plan and Internal Visibility (3155-F01 Revision A); - Double Hipped Garage (090/TDG3/001); - Single Hipped Garage (090/SG3/001); - 1.8M High Close Boarded Screen Fence (SD/SF1); - Post and Rail Fence (SD/SF25); - 1.8M High Screen Wall (SD/ED/SW1); - Broadband Connectivity Statement (AFM00G); - Flood Risk Assessment undertaken by Lees Roxburgh (Ref: 6395/R1, dated February 2021); and - Drainage Strategy for FRA Purposes (01-04). 3. Prior to the commencement of any development hereby approved, a scheme in the form of a Construction Environmental Management Plan (CEMP) shall be submitted to, and approved in writing by, the Local Planning Authority. The scheme shall include details for the methods to be employed to control and monitor noise, dust (based on a risk assessment in accordance with the latest IAQM document "Guidance on the assessment of dust from demolition and construction - 2014") and vibration impacts. The approved scheme shall be implemented to the full written satisfaction of the Local Planning Authority before the construction works are commenced and shall be maintained for the duration of the construction works. 4. Prior to the commencement of any part of the development ... view the full minutes text for item 25.