Resolved
Approved Representations had been received in relation to the impact of use on local streets; loss of parking; loss of turning areas; Japanese Knotweed on site; the ability to put bins out for collection; drainage and flooding problems; speeding problems in the area; business of local traffic junctions; high pressure gas main on site; works have already started on site; uncourteous contractors; lack of car parking; and lack of communication from the developers. Conditions: 1. The development hereby approved (other than plots 1-7 and plots 10-15 on which construction has already started) must be begun not later than the expiration of three years beginning with the date of this permission. 2. The development hereby approved shall be carried out in accordance with the details indicated in the below plans and documents: - 03-DR-007 Rev A Location Plan - 03-DR-001 RevC Proposed Landscaping Plan - 03-DR-003 RevB Proposed Management Plan - 03-DR-003 RevA Proposed Site Plan - FA-DR-B-03-201 Plans Type 2 - FA-DR-B-03-202 Elevations Type 2 - FA-DR-B-03-501 Visuals Type 2 - 03-DR-006 House Type 1 Proposed Floor Plans - 03-DR-005 House Type 1 Elevations - FA-DR-B-04-220 Section Sheet 01 - FA-DR-03-103 Street Scene Visuals Sheet 1 - 03-DR-002 Rev C Proposed Parking and Car Charging Point Plan - C-0004 RevP04 External Works - C-0013 RevP06 Refuse Vehicle Tracking - Remediation Strategy (Dated: February 2020, undertaken by Shape Consulting Engineers) - Assessment of Stockpiled Soil (Dated: 29 July 2021, undertaken by Envirosolution) - Supplementary Phase 2 Geo-Environmental Site Assessment (Report Dated 12 February 2020 by Shape Consulting Engineers) - Flood Risk Assessment (Dated: December 2021 by Betts Hydro Consulting Engineers) - Phase 1 and Phase 2 Combined Site Investigation Report (Dated: March 2019, undertaken by Shape Consulting Engineers) 3. Notwithstanding the details hereby approved, no development hereby approved shall be undertaken on the banks of Hey Brook or within the 8m easement zone as shown on plan 03-DR-003 Rev B until a survey to investigate for the presence of Water Vole on the site has been submitted to, and approved in writing by, the Local Planning Authority. If the survey(s) indicate the presence of Water Vole, appropriate mitigation measures and /or site working arrangements will be required to be identified, along with a plan for their implementation and management. Any mitigation works required by the survey shall be implemented and maintained, if necessary, in full accordance with the agreed details. 4. Notwithstanding the details hereby approved, no development hereby approved shall commence (or, ... view the full minutes text for item 12.