Planning Committee approved this item on Tuesday 11 July 2023. Below is the council's own wording, with the papers it was decided on.

Item7

Resolved

Approved Conditions: 1. The development hereby approved must be begun not later than the expiration of three years beginning with the date of this permission. 2. The development hereby approved shall be carried out in accordance with the details indicated on plan references: - Site Location Plan - TGW-JMA-MC-ZZ-DR-A-PL0001 Rev P01 - Illustrative Site Masterplan - TGW-JMA-MC-ZZ-DR-A-PL0003 Rev P01 - Proposed Plan Level B1 TGW-JMA-MC-B1-DR-A-PL0101 Rev P01 - Proposed Plan Level 00 TGW-JMA-MC-00-DR-A-PL0101 Rev P01 - Proposed Plan Level 01 TGW-JMA-MC-01-DR-A-PL0101 Rev P01 - Proposed Plan Level 02 TGW-JMA-MC-02-DR-A-PL0101 Rev P01 - Proposed Plan Level 03 - TGW-JMA-MC-03-DR-A-PL0101 Rev P01 - Proposed Plan Level 04 TGW-JMA-MC-04 -DR-A-PL0101 Rev P01 - Proposed Plan Roof Level TGW-JMA-MC-RF-DR-A-PL0101 Rev P01 - Proposed Elevations 01 TGW-JMA-MC-ZZ-DR-A-PL2101 Rev P02 - Proposed Elevations 02 TGW-JMA-MC-ZZ-DR-A-PL2102 Rev P02 - Proposed Sections TGW-JMA-MC-ZZ-DR-A-PL1001 Rev P01 - Landscape Masterplan 4500-10 Rev F - Landscape Masterplan Sheet 3 4500-13 Rev F - Ground floor Planting 02 4500-21 Rev I 3. Notwithstanding the details hereby approved, prior to the installation of the proposed materials, details of the particulars or samples of the materials to be used for the external walls and roofs of the hereby approved development, including colours and finishes, shall be submitted to, and approved in writing by, the Local Planning Authority. The development shall be constructed only in full accordance with the approved materials. 4. The landscaping shown on Plan References: ‘4500-10 Rev F’; ‘4500-13 Rev F’; and ‘02 4500- 21 Rev I’ shall be implemented in accordance with the approved details and an implementation plan that has been previously submitted to and approved in by the Local Planning Authority, and shall be maintained for a period of 2 years from the agreed date of planting. Any trees or plants which die, become diseased, or are removed during the maintenance period shall be replaced with specimens of an equivalent species and size. 5. The drainage for the development hereby approved shall be carried out in accordance with principles set out in the submitted Flood Risk Assessment prepared by SGi Consulting Engineers (Dated: May 2023, reference C1638/EAJ/bz/20230104) and Drawing reference ‘TWG-SGI-00-ZZ-dr-C-03-3000-t01, STAGE 3’, dated: 10 May 2023. 6. No development shall take place until a detailed design and associated management and maintenance plan of surface water drainage for the site using sustainable drainage methods has been submitted to, and approved in writing by, the Local Planning Authority. No surface water associated ... view the full minutes text for item 7.
Word for word from the decision Wigan published for this meeting. Source: democracy.wigan.gov.uk

Follow this further

Built from Wigan's papers

What the report saysPro

Report to Planning Committee

THE LOCAL GOVERNMENT (ACCESS TO INFORMATION) ACT 1985

LIST OF BACKGROUND PAPERS FOR PLANNING AND ADVERTISEMENT APPLICATIONS ON THE AGENDA OF THE PLANNING COMMITTEE

The Background Papers for the Planning and Advertisement Applications are:

1. The Appropriate Development Information Folder: This is a file with the same reference number as that shown on the Agenda for the Application. It contains the following documents:

(a) the application forms; (b) plans of the proposed development; (c) site plans; (d) certificate relating to ownership of the site; (e) consultation letters and replies to and from statutory consultees and bodies; (f) letters and documents from interested parties; (g) memoranda of consultation and replies to and from Departments of the Council.

2. Any previous Development Information Folders referred to in the Schedule or Reports in item 2 on the Agenda for the particular application or in the Development Information Folder specified above.

3. The Core Strategy of the Wigan Local Plan.

4. The Greater Manchester Joint Waste Development Plan Document, part of the Wigan Local Plan.

5. The Greater Manchester Minerals Plan, part of the Wigan Local Plan.

6. The Replacement Unitary Development Plan: Adopted April 2006 minus policies R1, R1A and EM1F which have not been saved as part of the Development Plan, the other policies which have been replaced by the Core Strategy (listed in Appendix A of that document), the waste management policies which have been replaced by the Greater Manchester Joint Waste Plan, and the minerals policies that have been replaced by the Greater Manchester Minerals Plan.

7. Applications with Background Papers additional to those specified in 1 to 6 above are specified in the individual reports. These documents may be inspected by contacting the case officer or viewing the Council’s web site: http://kinnear.wigan.gov.uk/planapps/

Aidan Thatcher, Director – Place CRITERIA FOR SITE VISITS AS AGREED 8 FEBRUARY 1994 AND AMENDED ON 12 SEPTEMBER 2012

Site visits can be requested by officers, a member representing the relevant ward, or a member of the Planning Committee. One of the following criteria must be established to justify a site visit:

(a) The impact of the development is particularly difficult to visualise and where plans, drawings or photographs would not provide sufficient clarity;

(b) The proposal is particularly contentious;

(c) The proposal is a significant development in the green belt;

(d) Proposals which relate to new or novel forms of development.

Site visit requests will only usually be appropriate when one of the above factors applies, or where exceptional circumstances apply.

Site visits should not be undertaken to defer difficult decisions on controversial applications, or when applicants, objectors or constituents request them without good planning reasons.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Front Sheet (July Planning Committee)Frontsheet 10 KB Download
PDF
Planning Related ItemsReport 67 KB DownloadRead as text

At this meeting

Whole meeting
6MinutesOn the agenda
7Planning Related ItemsThis decision

Who was there

14 of 23 attended
PT
Councillor Paul Terence KennyChairman, present
JH
Councillor John HardingVice-Chair, present
PJ
Councillor Paul John BlayCommittee Member, present
AB
Councillor Andrew BullenCommittee Member, present
AC
Councillor Anne CollinsCommittee Member, present
MD
Councillor Matt DawberCommittee Member, present
JF
Councillor James FishCommittee Member, present
LF
Councillor Laura FlynnCommittee Member, present
SA
Councillor Stuart Andrew GerrardCommittee Member, present
SJ
Councillor Susan June GreensmithCommittee Member, present
DH
Councillor David HurstCommittee Member, apologies
JN
Councillor Jim NicholsonCommittee Member, present

All 23 on the meeting page

On this subject at Wigan

Search all
  1. Planning Related ItemsThis decision
  2. Planning Related ItemsApproved
  3. Planning Related ItemsApproved
  4. Planning Related ItemsApproved
  5. Planning Related ItemsRefused
  6. Planning Related ItemsApproved

More from Wigan Planning Committee

All decisions
MeetingDecisionOutcome
3 Sep 2026 A/25/099558/FULL - Erection of detached dwelling, formation of new shared vehicular access and alterations to existing driveway, following demolition of existing garage.Approved Vote: In Favour (of Approval) 9 Against (Approval) 0 Abstain 1 The Committee approve the planning applicatio... Approved Open
4 Aug 2026 A/26/100488/FULL - Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd's hut, gazebo and associated landscape works (Retrospective application).Approved Vote: In Favour (of Approval) 13 Against (Approval) 1 Abstain 0 The Committee approve the planning applicati... Approved Open
7 Jul 2026 A/26/100333/FULL - Erection of a coffee shop drive-thru unit (Sui Generis) with associated landscaping, supporting infrastructure and engineering works.Approved Vote: In Favour (of Approval) 11 Against (Approval) 1 Abstain 1 The Committee approve the planning applicati... Approved Open
7 Jul 2026 A/26/100770/FULL - Conversion of existing premises (Use Class E) to provide two commercial units within Use Class E at ground floor, with new shopfronts and alterations to fenestration, together with two self-contained one-bed flats at first floor (Use Class C3).Approved Vote: In Favour (of Approval) 12 Against (Approval) 1 Abstain 0 The Committee approve the planning applicati... Approved Open
14 Apr 2026 A/25/09945/MAJOR - Change of use of Haigh Hall to a mixed-use cultural venue comprising art galleries, education suite, event spaces, restaurant/café, retail, office and bedroom accommodation, together with a rooftop extension to form a barApproved Vote: In Favour (of Approval) 11 Against (Approval) 0 Abstain 1 The Committee approve the planning applicati... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies