Resolved
Approved with conditions Representations had been received in relation to there being no need for further rental properties; the impact on local traffic and highway safety issues; loss of trees and vegetation; the public right of way being adversely affected; impact on infrastructure, quality of life, mental health and well-being; inadequate open space; Amberswood Rise residents being assured the setting would not alter; and amended plans not addressing concerns. 1. The development hereby must be begun no later than the expiration of three years beginning with the date of this permission. 2. The development hereby approved shall be carried out in accordance with the details shown on the following drawings: - Location Plan (ref. SBM-003-LP01 Rev B); - Site Layout Plan (ref. SBM-003-PL01 Rev R); - Boundary Plan (ref. SBM-003-BP01 Rev E); - Street scenes (ref. SBM-003-SS01); - General Arrangement Landscape Plan (ref. UG_1937_LAN_GA_DRW_01 P13); - Soft Landscape Plan 1 of 2 (UG_1937_LAN_SL_DRW_02 Rev P12); - Soft Landscape Plan 2 of 2 (UG_1937_LAN_SL_DRW_03 Rev P13); - Hard Landscaping Plan (Sheet 1 of 2) (ref. UG_1937_LAN_HL_DRW_04 Rev P07); - Hard Landscaping Plan (Sheet 2 of 2) (ref. UG_1937_LAN_HL_DRW_05 Rev P09); - House Type Pack (dated 29.06.23) comprising: a Yew 2bed (ref. SMB-HtPR-YEW) b Holly 3bed (ref. SMB-HtPR-HOL) c Oak 3bed (ref. SMB-HtPR-OAK) d Teak 3bed (ref. SMB-HtPR-TEA) e Larch 4bed (ref. SMB-HtPR-LAR) f Sycamore 4bed (ref. SMB-HtPR-SYC); - Materials Schedule (ref. SBM-003-MS001 Rev B); - Concrete Post Fence (ref. SBM003-SD-EF-001); - Feature Wall/Fence Detail (ref. SBM003-SD-EF-002); and - Post and Rail Fence Detail (SBM-004-SD-EF003). 3. The materials used on the external surfaces of the elevations and roofs of the approved properties shall be as specified on drawing ‘Materials Schedule (reference: SBM-003-MS001 Rev B).’ 4. Prior to the first occupation of any residential unit hereby approved, a scheme detailing the affordable housing arrangements for the development, with the scheme to be in full accordance with the affordable housing provision as detailed on drawing ‘Site Layout Plan (reference. SBM-003-PL01 Rev R)’, shall be submitted to, and approved in writing by, the Local Planning authority. Such a scheme shall include: (i) The timing of the construction of the affordable housing; (ii) The arrangements for the transfer of the affordable housing to an affordable housing provider or the management of the affordable housing (if no Registered Provider is involved); (iii) The arrangements to ensure that such provision is affordable for both the first and subsequent occupiers of the affordable ... view the full minutes text for item 16.