That the Committee agree to: 1. note the contents of the report and in particular the work that has been undertaken, which has concluded that critical infrastructure serving the splash pad at Gheluvelt Park has come to the end of its useful life; 2. instruct Officers to progress works of repair to the Splash Pad at Gheluvult Park as a priority project and delegates procuring all necessary contracts and services to the Corporate Director of Operations, Homes & Communities in consultation with the Chair and Vice Chair of this Committee; 3. note the estimated cost of repair works to the splash pad and recommends to Policy & Resources Committee the release of £294,000 from the Community Infrastructure Levy as previously approved by Place & Economic Development Committee (July 2023) to support progressing the Worcester Play Plan; 4. approve the release of two (2 No.) s.106 allocations totalling £72,000 as set out within this report, bringing the total budget available for the project to £366,000; 5. note that an update on the splash pad will be presented to Environment Committee on 5th November 2024; and 6. note the summary update on progress to date with the Worcester Play Plan Priority Projects at Appendix 1 to the report.
Word for word from the decision Worcester published for this meeting.Source: committee.worcester.gov.uk
Report to Place and Economic Development Committee, 11 pages
Recommendation
That the Committee -
1.1Note the contents of the report and in particular the work that has been undertaken, which has concluded that critical infrastructure serving the splash pad at Gheluvelt Park has come to the end of its useful life;
1.2Instruct Officers to progress works of repair to the Splash Pad at Gheluvult Park as a priority project and delegates procuring all necessary contracts and services to the Corporate Director of Operations, Homes & Communities in consultation with the Chair and Vice Chair of this Committee;
1.3Note the estimated cost of repair works to the splash pad and recommends to Policy & Resources Committee the release of £294,000 from the Community Infrastructure Levy as previously approved by Place & Economic Development Committee (July 2023) to support progressing the Worcester Play Plan;
1.4Approve the release of two (2 No.) s.106 allocations totalling £72,000 as set out within this report, bringing the total budget available for the project to £366,000;
1.5Note that an update on the splash pad will be presented to Environment Committee on 5th November 2024; and
1.6Note the summary update on progress to date with the Worcester Play Plan Priority Projects at Appendix 1.
Background
2.1The existing splashpad at Gheluvelt Park was installed in 2010 as part of a major refurbishment of the park, benefitting from Heritage Lottery Funding. Since the opening of the splashpad, popularity of the park has increased significantly.
2.2Engagement and consultation undertaken as part of developing the Worcester Play Plan, led to many comments around how highly residents value the splash pad, and in addition how busy it can get at times. 2.3 The type of splashpad at Gheluvelt Park is classed as ‘recirculatory’. Recirculatory splash pads have an adequately sized underground storage tank that is filled with water which is then pumped to the treatment equipment. The equipment filters and disinfects the water before being sprayed onto the play area. The water lands on the rubber surface, runs into the splash pad drainage system and back into the underground storage tank to be reused. Some loss of water occurs through water taken off the splash pad on bodies and clothing, and through evaporation.
2.4Over the last few years, the reliability of the splash pad has reduced significantly, with regular periods of downtime due to mechanical malfunction. In turn, the cost of operating the splash pad has increased, along with the officer time associated with arranging and overseeing repairs and dealing with communications.
2.5A condition survey of the existing splash pad has been undertaken and this has confirmed that the water filtration system has reached the end of its life. This is unsurprising given that research suggests that outdoor splash pads typically last 7 – 10 years, whilst Gheluvelt Park splash pad has been in operation for 14 years.
2.6In investigating options to improve the operability and resilience of the splash pad, it has been identified that an alternative type of splash pad exists, namely a ‘flow- through’ splash pad. These can offer increased resilience, and require lower maintenance than ‘recirculatory’ systems, however they use much more water, and are not suitable for larger splash pads.
2.7Flow-through systems use mains water, with the water supply connected to a command centre which controls when the splash pad can operate and allows water to be sprayed onto the play area. Water lands on the rubber surface and runs into the splash pad drainage system, where it is then discharged to the mains drainage system. These systems are good for smaller spray parks or where simple automated operation is required. Additional tanks and treatment systems can be added to reuse water for facilities such as park toilets or park irrigation systems.
Current Condition of Splashpad
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Place and Economic Development Committee at Worcester and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.