RESOLVED - That permission be GRANTED, subject to appropriate conditions. Development shall not commence until a scheme of dust management measures has been submitted to and approved in writing by the Local Planning Authority. The scheme as approved shall thereafter be implemented prior to the first use of the development. The development shall thereafter be operated in strict accordance with the approved dust management scheme. Reason: To protect the amenities of the occupiers of nearby properties in accordance with Policy GDP1 of the Wrexham Unitary Development Plan .
Word for word from the decision Wrexham published for this meeting.Source: moderngov.wrexham.gov.uk
REPORT OF THE CHIEF OFFICER ECONOMY AND PLANNING – 9 January 2023
APPLICATION NO: LOCATION: DATE RECEIVED: P/2022 /0765 KRONOSPAN LTD HOLYHEAD 19/08/2022 ROAD CHIRK WREXHAM LL14 5NT COMMUNITY: CASE OFFICER: Chirk DESCRIPTION: MP CODI 2 SEILO DEUNYDD CRAI, ESTYNIAD I ADEILAD PARATOI WARD: SGLODION A CHODI 3 SEILO A'R AGENT NAME: Chirk South GWAITH CYSYLLTIEDIG / AXIS ERECTION OF 2 RAW MATERIAL MR BOBBY CLAYTON SILOS, EXTENSION TO EXISTING CHIP PREPARATION BUILDING AND ERECTION OF 3 SILOS AND ASSOCIATED WORKS
The development comprises of the following: REPORT OF THE CHIEF OFFICER ECONOMY AND PLANNING – 9 January 2023
2 no. new raw materials storage silos of 33.5m in height and similar in appearance to 4 x existing silos (2 x 32m high and 2 x 25m high);
An extension to the existing chip preparation building (not exceeding the height of the existing building);
3 no. 24m high silos immediately to the north of the extension;
The repositioning of 3 no. filter boxes and the provision of 1 new filter box.
The provision of additional conveyors connected to the new development and between the new development and existing plant.
HISTORY
The site has an extensive history extending back to the early 1970’s. The decisions made in respect of applications for planning permission for the wider Kronospan site over the past 10 years are set out below:
P/2012/0165 DEVELOPMENT OF A BIOMASS PLANT, RECYCLED WOOD FIBRE (RCF) OFFLOADING AND SCREENING FACILITY AND ASSOCIATED INFRASTRUCTURE TO SUPPORT EXISTING PRODUCTION OPERATIONS. Granted 14.9.2012
P/2013/0824 DEVELOPMENT OF BIOMASS PLANT COMPRISING BIOMASS BOILER & FURNACE ASH, HANDLING FACILITY & FLUE, GAS TREATMENT FACILITY INCLUDING STACK & AIR POLLUTION CONTROL, REAGENT STORAGE SILOS, RECYCLED WOOD FIBRE OFFLOADING & SCREENING FACILITY, BIOMASS STORAGE AREA & ASSOCIATED INFRASTRUCTURE (SUBSTITUTION OF PLANNING PERMISSION CODE P/2012/0165). Granted 7.5.2014
P/2014/0215 2.35 METRE DIAMETER BY 7 METRE HIGH EXTENSION TO EXISTING 15 METRE HIGH ABATEMENT STACK. Granted 2.6.2014
P/2015/0728 ERECTION OF BUILDING TO CONTAIN THREE GAS ENGINES AND THREE STEAM BOILERS, ERECTION OF ELECTRICAL SUBSTATION BUILDING, OIL TANK COMPOUND A DUCT FROM THE PRESS ABATEMENT SYSTEM TO CARRY PROCESS EMISSIONS TO THE SEKA (WESP) STACK AND ASSOCIATED INFRASTRUCTURE TO SUPPORT EXISTING PRODUCTION OPERATIONS. Granted 4.1.2016
P/2016/0219 CONSTRUCTION AND OPERATION OF A RECYCLED FIBRE (RCF) RECEPTION FACILITY, GRADING PLANT, STORAGE REPORT OF THE CHIEF OFFICER ECONOMY AND PLANNING – 9 January 2023
SILOS AND OTHER ASSOCIATED INFRASTRUCTURE. Granted 3.5.2016
P/2016/0336 EXTENSION TO HOUSE A NEW MELAMINE FACING (MF) PRESS, FOLLOWING THE DEMOLITION / RELOCATION OF THE EXISTING MF DEPARTMENT'S VENTILATION SYSTEM, HYDRAULIC OIL AND DIESEL STORAGE TANKS, A VEHICLE FILLING STATION, GARAGE SERVICE BUILDING AND OTHER ASSOCIATED INFRASTRUCTURE. Refused 5.9.2016. Allowed on appeal 4.5.2017
P/2016/0442 MDF WASH WATER PRE-HEATER. Granted 23.1.2017
P/2016/0534 PROPOSED BUILDING EXTENSION TO STORE MEDIUM DENSITY FIBREBOARD (MDF) AND CHIPBOARD. Refused 5.9.2016
P/2017/0416 REPLACEMENT OF EXISTING WOOD CHIP PREPARATION FACILITY TO INCLUDE A BUILDING TO HOUSE NEW WOOD CHIP PREPARATION EQUIPMENT, DEVELOPMENT OF A NEW WOOD CHIP DRYER AND ASSOCIATED SIFTING, GRADING AND TRANSFER SYSTEM AND DEMOLITION OF EXISTING STRUCTURES TO FACILITATE THE DEVELOPMENT. Granted 31.7.2017
P/2017/0699 DEVELOPMENT OF A LOG DELIVERY AND TRANSFER SYSTEM AND BUILDING TO HOUSE A REPLACEMENT WOOD CHIPPING AND FLAKING SYSTEM AND DEMOLITION OF EXISTING DEBARKING AND CHIPPING FACILITIES. Granted 1.5.2018
P/2017/0700 DEVELOPMENT OF A RAW BOARD STORE. Refused 6.11.2017. Allowed on appeal 22.5.2018
P/2018/0551 PLANNING APPLICATION FOR THE DEVELOPMENT OF AN ORIENTATED STRAND BOARD PRODUCTION FACILITY. Not determined. Allowed on appeal 9.10.2019
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.