Resolved
Resolved Conditionally approved:- T002 Detailed Planning Permission Z001 The caravans on the site shall be used for holiday purposes only and shall not be used for permanent residential occupation, and the finished floor levels of all caravans sited on land at or above 17.72m AOD shall be set no lower than 18.52m AOD unless otherwise agreed in writing by the Local Planning Authority. Reason: To define the permission and to protect the occupants of the caravans from flooding in a 1% flood event plus climate change. Z002 Notwithstanding the above, this permission shall relate specifically to caravans sited on land at or above 17.72m AOD and the existing caravans sited within the 1% Flood Zone on the lower ground towards the river shall remain on a 6 month occupancy until they can be resited elsewhere on the site at a higher level. Reason: To define the permission. Notes: The decision to grant planning permission has been taken having regard to the policies in the approved Worcestershire County Structure Plan, the Wychavon District Local Plan (June 2006), and the West Midlands Regional Spatial Strategy (RPG11), and to all relevant material considerations, including Planning Policy Guidance Notes, Planning Policy Statements and Supplementary Planning Guidance. The following policies in the approved Worcestershire County Structure Plan are relevant to this decision: SD2, CTC1, CTC5, CTC8, RST14, RST18 The following policies in the Wychavon District Local Plan (June 2006) are relevant to this decision: GD2, ENV1, ENV8, ENV17, ENV18, ECON20 The following policies in the West Midlands Regional Spatial Strategy (RPG11) are relevant to this decision: SS2, RR4, PA12, QE7, QE11 The development is considered to comply with these policies and guidance notes and it is not considered that it will cause material harm to the amenities of the area. The FRA outlines that climate change increase (of 20%) would be in the order of 200mm (max). Under the terms of the Water Resources Act 1991 and the Land Drainage Bylaws, the prior written consent of the Agency is required for any proposed works or structures in, under, over, or within 8 metres of the top of the bank of the River Severn, designated a 'main river'. There must be no interruption to the surface water drainage system of the surrounding land as a result of the operations on the site. Provisions must be made that all existing drainage systems continue to operate effectively and that riparian owners upstream and downstream of the site are not adversely affected.