Advice of the Advisory Panel That the Executive Member be advised: (i) That the performance and success in 2007/08 be noted; (ii) That the issues arising in 2007/08 be noted; (iii) That the extension of existing arrangements for 2008/09 with Neighbourhood Services for the delivery of routine maintenance and the construction of footway resurfacing schemes up to a defined value be approved; (iv) That the extension of the term contract for Highway Surfacing for 2008/09 be approved; (v) That the allocation of budgets for 2008/09 be approved; (vi) That the implementation of the proposed programme be approved. Decision of the Executive Member
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Meeting of Executive Members for City 17 March 2008 Strategy and Advisory Panel Report of the Director of City Strategy
Annual Highway Maintenance Report
Summary 1. This report provides a review of the performance of the highway maintenance service over the last year, it examines issues arising and proposes programmes of work to be undertaken in the financial year 2008/09.
Background 2. The highway maintenance service covers a wide range of activities. It is delivered by a number of in-house teams, working in conjunction with external service providers. The Highway Infrastructure team has overall management responsibilities for the highway assets, it determines works programmes for Members to consider and arranges for smaller scale routine maintenance works to be carried out on a priority basis. Neighbourhood Services (NS) carries out most of this work, other than street lighting, where Amey is used. Bus shelter cleaning and maintenance is carried out by Stoneplan.
3 Larger LTP or CYC capital schemes, or highway related Ward Committee schemes, are designed and managed by the Engineering Consultancy and Tarmac is the principal contractor, although some of the smaller works may be carried out by NS. The consultancy also manages the Council’s bridges assets and assists with land drainage issues affecting the highway.
4 Leisure Services acts as the corporate manager for grass cutting across the council and for amenity and landscaped areas requiring maintenance.
Review of 2007/08 5 This review is split into two parts, dealing with ‘Performance and Successes’ and ‘Issues Arising’. Performance and Successes
Adoptions
6 Over the past year the highway network has increased by 2.98 kilometres of carriageway and 5.10 kilometres of footway, due to adoptions and new development.
Customer Satisfaction
7 The latest Talkabout Panel Questionnaire, dated June and September 2007 produced the following results:
Item Level of Level of Level of Level of satisfaction satisfaction dissatisfaction dissatisfaction June 2007 Sept. 2007 June 2007 Sept. 2007
Condition of 51% 48% 18% 16% pavements
Condition of 49% 49% 17% 18% roads
Reliability of 72% 72% 6% 6% street lights
Drainage of 51% 47% 20% 22% water from footpaths and roads
Condition of 61% 55% 12% 17% grass verges
Clarity of street 63% 62% 11% 14% name plates and street markings
Condition of 56% 59% 9% 9% street lights and street furniture
8. Satisfaction with the condition of the highway network is also obtained through the Residents Opinion Survey. The information is as follows: Item 2004/05 2005/06 2007/08
Satisfaction Satisfied 51% Satisfied 57% Satisfied 51% with pavement Dissatisfied 32% Dissatisfied 26% Dissatisfied 32% and footpath maintenance
Satisfaction Satisfied 64% Satisfied 65% Satisfied 61% with street lighting Dissatisfied 20% Dissatisfied 18% Dissatisfied 25%
9 The information, provided by the Residents opinion Survey shows that satisfaction with footways maintenance, road maintenance and street lighting has declined since these items were last included in this particular survey in 2005/06.
10 The percentage split of funding, between footway and carriageway surfaces was 60:40 for 2007/08 but the need to invest more in carriageways was discussed in the Advanced Design on Programmes report in January 2008, with the proposal to split funding on a 50/50 basis being approved.
Street Lighting
11 The procurement of the new street lighting contract was successfully completed for commencement at the beginning of May. The new contract provides a better standard of service by incorporating a pro-active maintenance regime of cleaning, changing lamps and also includes electrical and structural testing. The contract has been procured at a cost that is slightly below budget.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.