Consideration was given to a report which set out progress on schemes in the City Strategy Capital Programme during the 2007/08 financial year. This included the outturn report for 2007/08 and reports on budget spend to the end of March 2008. The outturn for the 2007/08 Capital Programme was £8,872k, an underspend of £662k against the budget. This represents an underspend of approximately 7% against the budget, which is principally due to the Council’s £500k contribution to the Highways Agency Hopgrove Roundabout Improvement scheme not being needed in 2007/08. It is proposed to carry over the following schemes from 2007/08 with funds into 2008/09. It was reported that proposals for the funding of the completion of other schemes would be made in the consolidated report to Members in July. Proposed Carry Overs to 2008/09 Schemes £000 A1237 Northern Bypass (Monks Cross Roundabout) - Resurfacing 60.0 Harrogate Road (part) - Resurfacing 57.0 Manor Lane (part) - Resurfacing 34.0 Hamilton Drive East/Hamilton Drive - Resurfacing 64.0 Selby Road Drainage Scheme 20.0 City Walls 18.0 Total £253
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Meeting of Executive Members for City 2 June 2008 Strategy and Advisory Panel Report of the Director of City Strategy
2007/08 CITY STRATEGY CAPITAL PROGRAMME: OUTTURN REPORT
Summary 1. The purpose of this report is to set out progress on schemes in the City Strategy Capital Programme during the financial year 2007/08. It is the outturn report for 2007/08 and reports on budget spend to the end of March 2008.
Background 2. The City Strategy Capital Programme budget for 2007/08 was agreed by the Executive Member in March 2007. The programme was finalised on 16 July 2007 when the Executive Member was presented with the consolidated Capital Programme for 2007/08, which included all work that had been carried over from 2006/07.
3. Following amendments to the programme at the second monitoring report in December, the current approved budget for the City Strategy Capital Programme for 2007/08 is £9,534k.
4. The outturn for the 2007/08 Capital Programme was £8,872k, an underspend of £662k against the budget. This represents an underspend of approximately 7% against the budget, which is principally due to the Council’s £500k contribution to the Highways Agency Hopgrove Roundabout Improvement scheme not being needed in 2007/08.
5. During 2007/08, 52 schemes were completed, works were ongoing on a further 39 schemes, and feasibility work was being progressed on 21 schemes at the end of March. Over 515m of off road cycle route was constructed, 5.9km of carriageway resurfaced and 9km of footway rebuilt during the year.
6. There has been a substantial amount of work delivered in the year including the following larger schemes: A new roundabout at the junctions of Moor Lane, Askham Lane and Askham Bryan Lane with the Outer Ring Road was constructed, which will improve accessibility and reduce the likelihood of high speed collisions at that location. Improvements were made to the Strensall Road Roundabout to reduce journey times for buses travelling from Strensall. A right turn lane and cycle crossing facilities were constructed at the Murton Lane junction with the A166 to improve safety. Phase 1 of the Heslington Lane Cycle Route was opened, and a new cycle route along Hull Road to provide a safer route to Archbishop Holgate’s School was completed. Details of the many other smaller schemes which were delivered in the year are provided in the report.
7. The structural maintenance allocation was used to resurface 15 roads and reconstruct 20 footways across the city. An increased allocation for the City Walls structural maintenance was used to reconstruct the roof of Robin Hoods Tower and undertake other repairs.
City Strategy Capital Programme 8. Progress on the major elements of the programme is set out in more detail in the following sections. Schemes that are funded from the Local Transport Plan are considered first, followed by schemes funded from other sources.
9. A scheme by scheme review of the progress is set out in Annex 1, which shows the scheme status at the end of March 2008. Progress on schemes since the end of the financial year is also shown where appropriate.
Schemes Within the Local Transport Plan OUTER RING ROAD AND JAMES ST LINK ROAD Programme: £4,093k (£3,550k LTP, £543k s106) Outturn at 31 March 2008: £3,874k
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.