Advice of the Advisory Panel That the Executive Member for City Strategy be advised to: (i) Note the contents of the report; (ii) Agree not to include a scheme for junction improvements at Deighton in the capital programme for 2008/09 but to consider a scheme for all future programmes. Decision of the Executive Member for City Strategy
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Summary 1. This report examines options for improving road safety at the Main Street (Deighton) / A19 junction and assesses the potential for a scheme to be funded from the Local Transport Plan Capital Programme. The report concludes that the cost of providing a pedestrian refuge and right turn lane is too high for the benefits it would provide and recommends that the scheme is not re-classified. The very low number of current bus users means a pedestrian refuge scheme on it’s own would offer low value for money and, in addition to this, the potential for a shift towards increased bus usage is limited due to Deighton’s low population. The accident data over the last three years suggests no issues with vehicles turning right into the village so there appears to be no immediate requirement for a right turn lane into Deighton.
Background 2. As part of the Village Traffic Study process, discussions with Deighton Parish Council back in 2004 identified two priority requests they wished to be considered for possible implementation:
• a pedestrian refuge island on the A19 for southbound bus passengers;
• measures to slow down southbound traffic that uses the bus bay to undertake traffic turning right into the village.
3. In response, a sum of £5,000 was allocated for the development of possible improvements to the A19 at Deighton within the approved Transport Capital Programme for 2005/06
4. Following on from this, officers developed two basic scheme options for consultation. Both options involved widening of approximately 400m of the A19 as shown on the “General Layout” plan (see Annex A) and provided a pedestrian refuge island on one side of the junction with a traffic island on the other, a right turn lane into the village, and a relocated Selby bound bus stop. The main differences in the options were the location of the pedestrian refuge island and relocated bus stop. The provisional estimated costs of both options were similar, at around £225,000. 5. Extensive consultation on these options took place during the summer of 2005. The results are discussed in more detail later in this report, but generally indicated a high level of support for the proposals, with a preference for the scheme option based on providing a pedestrian refuge south of the Main Street junction.
6. The outcome of consultation was reported to the Planning and Transport (East Area) Sub-Committee in October 2005. Based on the positive feedback, the Sub-Committee gave its backing to the proposed improvement scheme and requested that it be put forward for consideration as a possible scheme for inclusion in the 06/07 Capital Programme.
7. A report to the Executive Member for Planning and Transport and Advisory Panel (EMAP) on 18 April 2006 recommended a package of measures for funding from the Transport Capital Programme for 2006/07. The Deighton scheme was included on a reserve list for possible construction if sufficient spare funds became available later in the year. However, a small amount of funding was approved to allow additional investigation work to be undertaken to carry out a more detailed cost estimate and assessment of the benefits of the proposal scheme.
8. The additional investigatory work for the Deighton scheme was progressed during 2006/07. This identified several problems with the scheme, including higher potential costs for dealing with underground services, and the need for larger areas of new road construction than has initially been anticipated. This led to a revised scheme estimate of around £375,000.
9. In December 2006 a Capital Programme progress report was taken to EMAP. This noted that it would be necessary to defer implementation works on all of the reserve Village Traffic schemes to ensure that the overall programme was kept within budget.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.