Vibration Survey Results for North Moor Road (within Huntington Primary School Safety Zone)

Approved Committee 3 papers

City Strategy and Advisory Panel approved this item on Monday 14 July 2008. Below is the council's own wording, with the papers it was decided on.

Item25

Resolved

Option One – make no changes to the existing School Safety Zone; Option Two – remove the School Safety Zone or make alterations to the traffic calming measures in an attempt to reduce the current traffic vibration levels. Advice of the Advisory Panel That Executive Member for City Strategy be advised to approve Option One, to make no changes to the existing School Safety Zone on North Moor Road, Huntington and authorise Officers to formally notify the residents of the decision taken. Decision of the Executive Member for City Strategy
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to City Strategy and Advisory Panel

Meeting of Executive Members for City 14 July 2008 Strategy and Advisory Panel

Report of the Director of City Strategy

VIBRATION SURVEY RESULTS FOR NORTH MOOR ROAD (WITHIN HUNTINGTON PRIMARY SCHOOL SAFETY ZONE) Summary 1. This report advises Members about the results of vibration monitoring surveys conducted inside residents’ properties close to the speed cushions on North Moor Road, within the existing 20mph School Safety Zone. Members are asked to consider options on the way forward.

Background 2. A 20mph School Safety Zone with traffic calming measures has been in place outside Huntington Primary School since 2002. The layout of this scheme is shown in Annex A. Speed surveys conducted within recent years indicate that average speeds through the Safety Zone are around 23mph compared to around 33mph before the measures were introduced.

3. Residents first raised concerns about vibration levels in summer 2004. An assessment conducted by Officers at that time concluded that the situation was not a significant problem. Residents felt that things could be improved if motorists were made more aware of the traffic calming measures through the use of additional road markings and improved signing. Despite some doubts over effectiveness, Officers agreed to mount school warning signs on yellow backing boards, and paint square road markings on top of speed cushions. This was done as part of a wider review of the existing School Safety Zone, which also led to the introduction of some additional parking restrictions to manage parking congestion outside the school. These measures were introduced early in 2005.

4. Following these scheme improvements, no further complaints or concerns were raised by residents about vibration levels until early September 2007, when a previous complainant contacted Officers claiming that vibration levels had become significantly worse. This coincided with the receipt of a residents’ petition, which was reported to Members at the EMAP meeting on 10th December 2007. At that meeting, Members instructed Officers to undertake a scientific method of assessing the levels of vibration affecting residents. Assessment Methodology 5. Vibration monitoring surveys were carried out by the Council’s Environmental Protection Unit (EPU) at the two properties closest to the speed cushions: one at No.13 North Moor Road; and the other at No.7 Garth End (see Annex B). The surveys were undertaken on 9th and 10th April 2008 respectively over three hours between 6am and 9am. Officers agreed with residents to conduct the surveys during this period, because this was the time that gave them the most concern.

6. Vibration levels are measured by the monitoring equipment in two ways. The first method measures the Peak Particle Velocity (PPV), which is used to assess the likelihood of vibration damage to adjacent properties. Measured levels of vibration were compared with the threshold level for vibration induced building damage as detailed in BS 7385 Part I: 1990; and Part 2: 1993, whereby a PPV measurement of 10mm/second is recognised as the level at which cosmetic damage to buildings may start to occur.

7. The second method measures the Vibration Dose Value (VDV), and this is used to evaluate residents’ exposure to vibration within their properties, and provide an indication of the effect that vibrations have on the quality of life of residents living nearby.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
North Moor Rd EMAP Report: 14-07-08: Annex AAppendix 322 KB Download
PDF
North Moor Rd EMAP Report: 14-07-08: Annex BAppendix 107 KB Download
PDF
Vibration Survey Results for North Moor Road (within Huntington Primary School Safety Zone)Report 56 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

8 of 10 attended
SG
Councillor Steve GallowayCabinet Member, apologies
IG
Councillor Ian GilliesChair, present
AD
Councillor Andy D'AgorneVice-Chair, present
RC
Councillor Richard CreganCommittee Member, present
KH
Councillor Keith HymanCommittee Member, apologies
RP
Councillor Ruth PotterCommittee Member, present
DS
Councillor David ScottCommittee Member, present
AW
Councillor Andrew WallerCabinet Member, present
TH
Councillor Tom HolveySubstitute, present as substitute
CR
Councillor Carol RuncimanCommittee Member, present as substitute

More from York City Strategy and Advisory Panel

All decisions
MeetingDecisionOutcome
16 Mar 2009 MinutesThat the minutes of the last meeting of the Panel held on 27 January 2009 be approved and signed by the Chair and Exe... Approved Open
16 Mar 2009 Core Funding to Voluntary Organisations 2009/10Advice of the Advisory Panel That the Executive Leader be advised to: (i) Maintain the existing grant funding agreeme... Agreed Open
16 Mar 2009 Chief Executive's Monitor 3 Finance & Performance Report 2008/09Advice of the Advisory Panel The Advisory Panel advises the Executive Leader to note the financial and performance po... Noted Open
16 Mar 2009 2008/09 Third Monitoring Report Economic Development and Partnerships - Finance & PerformanceAdvice of the Advisory Panel The Advisory Panel advises the Executive Leader to note the financial and performance po... Noted Open
16 Mar 2009 City Strategy Capital Programme - Monitor 3 ReportAdvice of the Advisory Panel That the Advisory Panel advise the Executive Member for City Strategy to: (i) Approve th... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies