Advice of the Advisory Panel That the Executive Member for City Strategy be advised to defer consideration of the proposals for this section of the cycle route, to enable Officers to re-examine all the options for this scheme and report back to the EMAP. 1. Decision of the Executive Member for City Strategy
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Meeting of Executive Members for City Strategy 8 December 2008 and Advisory Panel
Report of the Director of City Strategy
LINKS TO CYCLE ROUTE THROUGH HOSPITAL GROUNDS: PROPOSED LINK FROM THE HOSPITAL TO FOSS ISLANDS ROUTE Summary 1. This report advises Members about the results of consultation on proposals to introduce a cycle route link from the northern end of the York Hospital site to the existing Foss Islands Cycle Route. Members are asked to consider the contents of the report and approve the recommended option for implementation.
Background 2. Encouraging more people to cycle has been a long-standing priority for the Council, and this work has recently been given a huge boost by our successful bid to become a ‘Cycling City’.
3. As part of an action plan to address existing gaps in the cycle route network, we are seeking to improve the Haxby to York Station route. The overall route plan is shown in Annex A. This new route is a planning condition linked to the hospital’s new multi-storey car park, which is due to be constructed soon. The new cycle route through York Hospital will continue through Bootham Park Hospital to the A19 (Bootham), and then along St. Mary’s towards Scarborough Bridge and the Station. This overall route will provide improved access to many employment sites, schools, leisure facilities, healthcare and retail sites.
4. In relation to the planning condition referred to above, the hospital originally proposed a route along the front of the hospital on Wigginton Road. However, following a detailed feasibility study, it was concluded that this route would not be appropriate, primarily because of a number of significant road safety concerns. These related to problems where the route would need to cross Wigginton Road and side roads, or share limited space with either pedestrians or motor traffic. Furthermore, a route at the front of the hospital would not easily connect with existing cycle facilities at either end, and would be inconsistent in nature, comprising a mixture of on and off-road sections of cycle path and advisory cycle lanes. As a result, Officers considered that the proposals were potentially dangerous, and would not be an attractive route for cyclists to use. Subsequently, it was agreed with the hospital to formulate a route through the hospital grounds instead. 5. The aim of the proposed scheme is to provide a direct off-road link between the existing Foss Islands cycle route and the new route being provided through the grounds of York Hospital.
Proposals 6. In the feasibility stage it was recognised that creating a new cycle route along the old railway line to the rear of Murrough Wilson Place would give rise to some security concerns, and therefore representatives from the hospital, the Railway Housing Association and the Police were consulted at an early stage. Feedback from them has been considered in developing the proposals, which are shown in Annex B. A description of the main elements of the proposals are explained in more detail below:
• Building a 2.5m wide off-road shared path for pedestrians and cyclists from the north side of York Hospital, along the old railway track bed to the existing Foss Islands cycle route (note that a significant amount of vegetation will need to be removed to create a more open feel on either side of the path); • Gated access at both ends of this link, to be open between 7am and 10pm; • The introduction of street lighting along the length of the path (which will operate in accordance with the gating operation, i.e. will be switched off between 10pm and 7am). Secure fencing to be provided between the new link and the Railway Housing Association properties on Murrough Wilson Place (see Annex C for more details); • Due to the level difference between the existing and proposed paths, a ramp is to be provided at the eastern end in order to provide the link.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.