Advice of the Advisory Panel That the Advisory Panel advise the Executive Member to; (i) Give in principle approval for the amended scheme proposals shown in Annex C (circulated at the meeting) to be implemented, subject to the necessary planning and listed building consents being secured and (ii) Give delegated authority to the Director of City Strategy, in consultation with the Executive Member, to approve the detailed scheme layout for implementation within the 2009/10 financial year, subject to the necessary funding being allocated. 1. Decision of the Executive Member for City Strategy
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Meeting of Executive Member for City Strategy 8th December 2008 and Advisory Panel Report of the Director of City Strategy
LINKS TO CYCLE ROUTE THROUGH HOSPITAL GROUNDS: PROPOSED TRAFFIC SIGNALS AT BOOTHAM TO CATER FOR CYCLIST CROSSING MOVEMENTS Summary 1. This report advises Members about the results of consultation on proposals to install traffic signals at the junction of Bootham, St Mary’s and the entrance to Bootham Park Hospital (known as ‘The Drive’) to provide a priority crossing for cyclists across Bootham. Members are asked to consider the contents of this report and approve the recommended option for implementation.
Background 2. Encouraging more people to cycle has been a long-standing priority for the Council, and this work has recently been given a huge boost by our successful bid to become a ‘Cycling City’.
3. As part of an action plan to address existing gaps in the cycle route network, we are seeking to improve the Haxby to York Station route. The overall route plan is shown in Annex A. The aim is to provide a signalised crossing facility for cyclists across the busy A19 Bootham to resolve the difficulties currently being experienced by cyclists crossing Bootham from both St. Mary’s and ‘The Drive’. The new route through the hospital grounds is a planning condition linked to the new multi-storey car park, which is due to be built soon. The overall route will provide improved access to many employment sites, schools, leisure facilities, healthcare and retail sites.
4. Although checks on the accident levels at the junction on Bootham over the last three years show that there have been no injury accidents, on-site observations show that cyclists experience difficulties in crossing Bootham. This is particularly evident during peak periods, even when the inbound traffic flow is queuing, because cyclists crossing or making a right turn from ‘The Drive’ can be masked from the view of outbound traffic. Currently, around 70 cyclists exit ‘The Drive’ during the pm peak hour, and this is expected to increase in the future, following the implementation of the proposed measures. Proposals 5. The proposals are shown in Annex B and a description of the main elements is provided below:
• Removal of the existing Pelican crossing point and the installation of new traffic signals to provide cyclists with a priority crossing over Bootham at its junction with St. Mary’s and ‘The Drive’;
• Red/Green man pedestrian crossing facility over Bootham;
• Non-signalised pedestrian crossings over St. Mary’s and ‘The Drive’;
• Narrowing the entrance to ‘The Drive’ to improve intervisibility between road users and pedestrians.
6. It is proposed that the signals would operate in four separate stages, as outlined below:
Stage 1 would allow all Bootham traffic to flow; Stage 2 would allow pedestrians to cross Bootham; Stage 3 would allow vehicles, including cyclists, to emerge from ‘The Drive’*. Stage 4 would allow vehicles, including cyclists, to emerge from St. Mary’s*.
*Please note that Stages 3 & 4 would operate on demand. If no vehicle demand was triggered from detection loops in either of the side roads, then Stage 1 would automatically recommence after Stage 2 to minimise any delay to traffic on Bootham. In addition, the pedestrian phase would take precedence over any other movements.
7. This arrangement has the advantage of keeping the traffic flowing on Bootham, as a red signal will only be displayed for traffic on Bootham when there is a demand to use the Pelican, or a demand from either side road. The side roads need to have separate stages for two main reasons. Firstly, the width of the gateway to ‘The Drive’ is not sufficient to safely accommodate two-way traffic flow. Secondly, the separate signal phases will ensure that cyclists moving between ‘The Drive’ and St. Mary’s are not at risk from opposing traffic, which could make right turns across their path.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.