Resolved
That the application not be considered. Reason: As the application had been withdrawn.
Planning Main decided this item on Thursday 15 November 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
That the application not be considered. Reason: As the application had been withdrawn.
COMMITTEE REPORT
Date: 15 November 2018 Ward: Rural West York Team: Major and Parish: Hessay Parish Council Commercial Team
Reference: 18/01023/FUL Application at: Mapplefields, 5 Laburnum Farm Close, Hessay, York, YO26 8LG For: Erection of stables in paddock By: [name removed] Type: Full Application Target Date: 19 October 2018 Recommendation: Refuse
1.0PROPOSAL
1.1Planning permission is sought for 4 box pitched roof brick and tile stable block within an orchard/private grassed amenity area. No planning permission has been sought for the change of use of the grassed area for equestrian use. The applicant and agent have confirmed that they do not currently have horses/ponies however there is the intention to buy one horse/pony. Access to the site would be from Laburnum Farm Close
1.2The proposed stable block would measure 16.4 metres by 8.7 metres the roof ridge would be 4.77 metres in height not including the clock tower and ventilation towers (total height 5.6 metres in height), there would be a covered walkway. It is unclear the surfacing of the area to the front/east of the stables. Each box would measure 3.85 metres by 6 metres. Two of the boxes are labelled for food, tack etc. The external finish to the proposed stables would be brick and timber cladding and rosemary tiles for the roof. No details have been provided for the parking of equestrian vehicles or the siting of the manure heap.
1.3The site is within the general extent of the greenbelt. The site is within Flood Zone 1
1.4Relevant Planning History
02/03698/FUL - Erection of 9 dwellings with associated access road, garages and parking - Approved
2.0POLICY CONTEXT
2.1The City of York Draft Local Plan Incorporating the Fourth Set of Changes was approved for Development Management purposes in April 2005: CYSP2 The York Green Belt Application Reference Number: 18/01023/FUL Item No: 4c CYGP1 Design CYGP4A Sustainability CGP15A Development and Flood Risk CYGB1 Development within the Green Belt CYGB13 Sports facilities outside settlements
2.2The Publication Draft York Local Plan SS2 The Role of York’s Green Belt D1 Placemaking D2 Landscape and Setting D6 Archaeology D7 The Significance of Non-Designated Heritage Assets GB1 Development in the Green Belt GB2 Development in Settlements within the Green Belt ENV2 Managing Environmental Quality ENV5 Sustainable Drainage
2.3Saved policies of the Yorkshire and Humber Regional Spatial Strategy (RSS) relating to the general extent of the York Green Belt. These are policies YH9(C) and Y1 (C1 and C2).
2.4Please see the Appraisal Section (4.0) for national and local policy context.
3.0CONSULTATIONS
INTERNAL CONSULTATIONS
HIGHWAY NETWORK MANAGEMENT
3.1Do not envisage any implications to the highway network as a result of the proposed development.
DESIGN, CONSERVATION AND SUSTAINABLE DEVELOPMENT (ARCHAEOLOGY)
3.2No objections.
FLOOD RISK MANAGEMENT TEAM
3.3Object, on the lack of information. It has not been demonstrated that the site can be adequately drained.
PUBLIC PROTECTION Application Reference Number: 18/01023/FUL Item No: 4c 3.4 No objection, request condition to restrict the hours of construction.
EXTERNAL CONSULTATIONS/REPRESENTATIONS
HESSAY PARISH COUNCIL
3.5Object - the size and scale of the proposed development compared with the area of the paddock and the footprint of neighbouring properties.
3.6The development would be in the Green Belt and no very special circumstances have been justified.
3.7The development extends beyond the existing building line.
AINSTY INTERNAL DRAINAGE BOARD
3.8The applicant requires prior consent from the Board for any development including fences or planting within 9.00m of the bank top of any watercourse within or forming the boundary of the site. Any proposals to culvert, bridge, fill in or make a discharge to the watercourse will also require the Board's prior consent.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Mapplefields 5 Laburnum Farm Close Hessay Site PlanPlan | 1 pages | Download |
PDF |
Mapplefields 5 Laburnum Farm Close, Hessay [18/01023/FUL]Report | 12 pages | DownloadRead as text |
Follow Planning Main at York and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 5 May 2022 | MinutesThat subject to the addition of Cllrs Melly and Ayre to the list of apologies, the minutes of the last meeting held o... | Approved | Open |
| 7 Apr 2022 | Minutesi. That the minutes of the meeting held on 3 February 2022 be approved and then signed by the chair as a correct reco... | Approved | Open |
| 3 Mar 2022 | MinutesThat the minutes of the last meeting held on 3 February 2022 be approved at the next meeting. | Approved | Open |
| 3 Mar 2022 | Lindum Group Limited, York Road, Elvington, York YO41 4EP [21/01709/REMM]That the application be approved subject to the conditions listed in the report and the addition of an informative in... | Approved | Open |
| 3 Feb 2022 | MinutesThat, subject to the amendment stated above, the minutes of the last meeting held on 6 January 2022 be approved and s... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.