Land To The South Of Field Lane, Heslington [18/01416/REMM]

Deferred Planning 2 papers

Planning Main deferred this item on Thursday 15 November 2018. Below is the council's own wording, with the papers it was decided on.

Item42

Resolved

That the application be deferred. Reason: To enable consultation with Heslington Parish Council to take place.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Planning Main, 32 pages

COMMITTEE REPORT

Date: 15 November 2018 Ward: Hull Road Team: Major and Parish: Heslington Parish Council Commercial Team

Reference: 18/01416/REMM Application at: Land To The South Of Field Lane Heslington York For: Reserved matters application for approval of siting, design, external appearance and landscaping to provide student accommodation (providing 1,480 bed spaces) including the provision of two colleges and residential blocks within a central green space, the realignment of Lakeside Way following outline permissions 15/02923/OUT. By: University Of York And Graham Construction Limited Application Type: Major Reserved Matters Application (13w) Target Date: 22 November 2018 Recommendation: APPROVE

1.0PROPOSAL

1.1This application relates to development of student accommodation at the University of York East Campus located to the east of Heslington Village. The development is the ‘Cluster 4’ phase which is positioned to the western end of the campus in order to take advantage of the proximity to the facilities that are provided at the West Campus.

1.2The East Campus has started to evolve with clusters 1 and 2 partly built out. Cluster 1 is currently the most westerly development on the site, providing academic departments and teaching buildings along with Goodricke College. Cluster 2, to the east provides other colleges, Langwith and Constantine. Cluster 3 at the eastern edge of the campus provides sports village and pitches.

1.3East Campus was formerly agricultural fields with no special landscape quality. The future development of the site was to be provided within a parkland setting. Kimberlow Hill to the north was the subject of earth modelling works following construction of the Detention Basin. To the south, there is a man-made Lake. The Lake has altered in shape since the outline consent was granted and alongside its aesthetic purpose, it is a balancing regulator for drainage.

1.4Outline consent for the development of the site as a campus for the University was allowed following a public inquiry (Ref: 04/01700/OUT and subsequently amended). Conditions on this consent notably condition 11 requires a Design Brief with Masterplan to allow the development of the site to evolve over time. Other conditions include a restriction on the maximum building height depending on the

Application Reference Number: 18/01416/REMM Item No: 4e zoning and a restriction of the developed footprint (including all buildings, car parks and access roads) of the allocated area to 23% total area.

1.5In line with the outline consent and the approved design brief with masterplan, this is an application for reserved matters (siting, design, external appearance and landscaping) to provide student accommodation. Cluster four will be made up of two colleges; North and South colleges either side of a central amenity space. Following negotiations two student blocks have been removed from South College and positioned at the eastern end of the central amenity space area between the two colleges. All the buildings combined will provide 1,480 student bed spaces. This is an increase of 60 from the original proposal.

1.6Officers are satisfied that the environmental information already submitted in respect of the development of the Heslington East Campus is sufficient to assess the environmental effects of this development. As such no addendum to the Environmental Statement has been sought. Nor does the submission include further information or any other substantive information that would require further publicity under the Environmental Impact Regulations 2011.

1.7The University guarantees accommodation to all first year and foundation year students, including overseas students. Any vacancies are offered to returning students and the proposals will provide additional capacity for students to live on campus, rather than in private rented sector elsewhere in the City.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Land To The South Of Field Lane Heslington Site Plan finalPlan 1 pages Download
PDF
Land To The South Of Field Lane, Heslington [18/01416/REMM]Report 32 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at York

Search all
  1. Land To The South Of Field Lane, Heslington [18/01416/REMM]This decision
  2. Land to the south of New Farm, Lords Lane, Nether Poppleton Report [23/02254/FULM] (4.39pm)Approved
  3. Land South of The Residence, Bishopthorpe Road, York [18/02582/FULM]Deferred
  4. Land lying to the South of Elvington Airfield Network, Elvington, York [18/02839/FULM]Approved
  5. Land to the South of Northminster Business Park, Harwood Road, Upper Poppleton, York [18/02158/FULM]Approved
  6. Land To The South Of Keepers Cottage Intake Lane, Dunnington, York (17/00893/FUL)Deferred

More from York Planning Main

All decisions
MeetingDecisionOutcome
5 May 2022 MinutesThat subject to the addition of Cllrs Melly and Ayre to the list of apologies, the minutes of the last meeting held o... Approved Open
7 Apr 2022 Minutesi. That the minutes of the meeting held on 3 February 2022 be approved and then signed by the chair as a correct reco... Approved Open
3 Mar 2022 MinutesThat the minutes of the last meeting held on 3 February 2022 be approved at the next meeting. Approved Open
3 Mar 2022 Lindum Group Limited, York Road, Elvington, York YO41 4EP [21/01709/REMM]That the application be approved subject to the conditions listed in the report and the addition of an informative in... Approved Open
3 Feb 2022 MinutesThat, subject to the amendment stated above, the minutes of the last meeting held on 6 January 2022 be approved and s... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies