CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Argyll and Bute Council
Bute and Cowal Area Committee, Tuesday 7 April 2015 at 9.30am

ROADS CAPITAL PROGRAMME 2015/2016

Noted Committee 2 papers

Bute and Cowal Area Committee noted this item on Tuesday 7 April 2015. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

Decision 1. The Committee noted the contents of the report. 2. The Committee noted the recommendation at 3.1 of the report. (Ref: Report by Contract Manager dated 7 April 2015, submitted)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Bute and Cowal Area Committee

Executive summary

The Roads Reconstruction Programme has been structured in accordance with the Roads Asset Management and Maintenance Strategy. The focus has been to recover the network through a delivery of a mix of carriageway resurfacing, patching/surface dressing and in-situ road surface recycling; designed to seal the road to stop the ingress of water, improve ride quality and reduce the amount of reactive repairs.

Over the last 4 years approximately 25% of the overall council road network has been treated which will make a significant and positive impact upon the local economy, connectivity and the quality of life of our communities.

Recommendation

That the Area Committee notes the successful completion of the 3 year Roads Reconstruction Programme for 2012-2015 and notes the proposed programme and budget for 2015/16.

1 ARGYLL AND BUTE COUNCIL XXX Area Committee

DEVELOPMENT AND INFRASTRUCTURE SERVICES XX March 2015

ROADS CAPITAL RECONSTRUCTION PROGRAMME 2015/16

Summary

2.1This report provides Members with details of the proposed roads reconstruction programme for 2015/16.

Recommendations

3.1That the Committee notes the successful completion of the 3 year Roads Reconstruction Programme for 2012-2015 and notes the proposed programme and previously agreed budget for 2015/16.

4.0DETAILS

4.1The focus of the roads reconstruction programme has been to recover the network through the delivery of a mix of carriageway resurfacing schemes, patching/surface dressing and insitu road surface recycling, which follow the principles set out within the Roads Asset Management and Maintenance Plan.

4.2The schemes have been selected using the Councils Roads Asset database WDM-PMS and using the information collected from the full SCANNER Survey carried out in summer 2014. In-line with recommendations within the Annual Status and Options Report, the programme is not necessarily concentrated on the red roads but instead has been realigned to focus on the amber roads to arrest deterioration and prevent these becoming red.

4.3Members’ attention is drawn to the fact that schemes are not necessarily directed at what could be considered as ‘roads in a poor condition’. Surface dressing schemes are selected on the basis that, either the skid resistance of the road surface is poor, or the road surface requires sealing before it fails. As Members are aware, schemes are also weighted on the basis of the strategic level of importance the route.

4.4The summary table below highlights the positive and visible impact of the works undertaken to date. Since 2011 the Council has upgraded almost 40% of its A Class roads and over

2 580km of roads in total, which makes a significant and positive impact upon the local economy, connectivity and the quality of life to our communities.

4.5Table 1 – Treatment 2011/12 to 2014/15 (based on network pre trunking of A83)

Total Treatment as Total Road Treatment FY Treatment FY Treatment FY Treatment FY a % of Treatment Category 2011/12 2012/13 2013/14 2014/15 network Length length 2011- 15 km % km % km % km % km % A 55.76 10.01% 93.37 16.76% 47.42 8.51% 26.1 4.69% 222.67 39.98% B 26.846 4.38% 58.91 9.61% 25.96 4.23% 68.3 11.14% 180.01 29.37% C 12.374 2.85% 4.008 0.92% 7.99 1.84% 14.5 3.33% 38.83 8.95% U 18.86 2.60% 17.55 2.42% 43.6 6.01% 57.5 7.93% 137.53 18.97% 579.04 24.86%

4.6With the recent trunking of the A83 Tarbert to Campbeltown Road, the overall length of the network has altered. Percentage treatment figures for 2015 to 2016 are based upon the revised length of the road network.

4.7Table 1 – Treatment 2015/16 (based on network post trunking of A83)

Road Treatment FY Category 2015/16

km % A 47.988 9.50% B 23.289 3.80% C 24.416 5.63% U 17.798 2.45% 113.491 4.98%

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Bute & Cowal Location Plans ALLPlan 2.2 MB Download
PDF
ROADS CAPITAL PROGRAMME 2015/2016Report 114 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 22 attended
GB
Councillor Gordon BlairMember, present
IB
Ishabel BremnerOfficer, expected
MB
Councillor Michael BreslinMember, present
SC
Stewart ClarkOfficer, expected
DC
David ClementsOfficer, expected
SD
Sandra DaviesOfficer, expected
JD
John DuncanCouncil Staff, expected
JL
Jane Lawrence-WinchPublic, expected
SL
Sally LoudonOfficer, expected
AM
Allan Macdonald (Streetscene)Officer, expected
LM
Linzi MacDonaldOfficer, expected
RM
Councillor Robert MacintyreChair, present

All 22 on the meeting page

On this subject at Argyll and Bute

Search all
  1. ROADS CAPITAL PROGRAMME 2015/2016This decision
  2. Roads capital reconstruction programme 2026-27 - update reportAgreed
  3. Roads capital reconstruction programme 2026-27Agreed
  4. Roads capital reconstruction programme - 2025/26Agreed
  5. Roads capital reconstruction programme 2024/25 - update reportAgreed
  6. Roads capital reconstruction programme 2024/25Agreed

More from Argyll and Bute Bute and Cowal Area Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Charts (argyll and the isles)Decision The Bute and Cowal Area Committee considered and noted the information provided in the presentation. (Refere... Noted Open
1 Sep 2026 Area committee quarterly performance reports fq1 2026/27Decision The Bute and Cowal Area Committee noted the performance and supporting commentary as presented. (Reference: ... Noted Open
1 Sep 2026 Supporting Communities Fund 2026/27Decision The Bute and Cowal Area Committee agreed that the 20 applications, marked as ‘Award’ or ‘Partial Award’ with... Agreed Open
1 Sep 2026 Roads and infrastructure services updateDecision The Bute and Cowal Area Committee noted the contents of the report. (Reference: Report by Executive Director... Noted Open
1 Sep 2026 Cruach mhor and clachan flats windfarm trustsDecision The Bute and Cowal Area Committee noted these updates, which are the most recent of the annual updates requi... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies