That Cabinet: 1. Authorised the Executive Director Growth & Regeneration, in consultation with the Cabinet Member for Climate, Ecology, Waste and Energy, to take all steps required to extend and vary the electricity sleeving and supply arrangements for up to 18 months (up to March 2025), in-line with the procurement routes and maximum budget envelopes outlined in this report. 2. Authorised the Executive Director Growth & Regeneration to invoke any subsequent extensions/variations specifically defined in the contract(s) being awarded, up to the maximum budget envelope outlined in this report.
Word for word from the decision Bristol published for this meeting.Source: democracy.bristol.gov.uk
Ward(s) Citywide Author: David Gray Job title: Energy Supply Manager Cabinet lead: Cllr Kye Dudd, Cabinet Member for Executive Director lead: John Smith, Interim Executive Director Climate, Ecology, Waste and Energy Growth & Regeneration Proposal origin: BCC Staff Decision maker: Cabinet Member Decision forum: Cabinet Purpose of Report: 1. To seek approval to extend Bristol City Council (BCC) electricity sleeving and supply contracts for up to 18 months whilst development work takes place to set up the previously approved Sleeved Pool supply mechanism in conjunction with Bristol City Leap (BCL). Evidence Base: 1. All BCC electricity sleeving and supply contracts expire at the end of September 2023. 2. The current ‘sleeving’ arrangement uses BCC’s own renewable generation assets (wind turbines and solar farm) to meet around one third of current BCC electricity demand using low-cost zero-carbon electricity. This arrangement has saved an estimated 2,021 tonnes of CO2 emissions since August 2022 (compared with a conventional grid supply contract). 3. In order to increase the amount of BCC electricity demand met from sleeving, additional local renewable energy generation is required. This is intended to be provided through the ‘Sleeved Pool’ mechanism, linking local renewable energy generation and BCC demand through a virtual pool, as approved at the February 2021 Cabinet. This mechanism is now being developed in conjunction with the newly appointed City Leap Partner. 4. The detailed timetable for delivering the Sleeved Pool mechanism is being developed. Discussions with the City Leap Partner have indicated that the structures and processes required to operate the proposed ‘Sleeved Pool’ supply mechanism will not be in place by the time the current supply arrangements expire, due to procurement and operational issues that need to be resolved. 5. Arrangements need to be put in place to maintain an electricity supply for BCC from the end of September 2023 until the Sleeved Pool mechanism is available. Further approval will be sought before joining the Sleeved Pool when this becomes available. 6. An options appraisal has considered a range options for maintaining the BCC electricity supply in the interim (Appendix A). The recommended option is for a 12+6 month extension to the current sleeving arrangement, in anticipation of the Sleeved Pool becoming available from October 2024, with an option for six months contingency. 7. It is also recommended that the small electricity (NHH) and streetlighting (UMS) contracts should be extended by 18 months, in anticipation of joining the Sleeved Pool arrangement once sufficient additional generation becomes available from April 2025. 8. BCC’s current sleeving and supply arrangements are managed through the Laser Public Sector Buying Organisation. Laser and their appointed supplier (TotalEnergies) have indicated that they would be willing to extend the current arrangements. 9. The current sleeving arrangement was intended as an interim measure, to bridge the gap until the Sleeved
1 Version Feb 2022
OFFICIAL Pool could be developed. It has a number of limitations, especially in that it is limited to BCC’s own renewable energy generation, has complex billing arrangements, and BCC is exposed to market prices for the grid top-up element (c15%). Laser and TotalEnergies have indicated that some changes could be made to the current arrangement if a longer extension (min 12 months) is agreed. This would allow some additional generation to be incorporated, and thus an increase in the extent of BCC electricity demand met from sleeving, as well as a review of the pricing mechanism to lock down the currently variable monthly prices. Cabinet Member / Officer Recommendations:
That Cabinet:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Safety Valve Programme – capital fundingThat Cabinet: 1. Noted the full terms of the Safety Valve agreement with the Department for Education (DfE) (Appendix...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.