Item190
Resolved
RESOLVED That the application be approved subject to a legal agreement to secure: The provision of on site open space and equipped children’s playspace in accordance with Policy RT.3 of the Local Plan with any shortfall in provision to be made up by way of a developer contribution in lieu of public open space calculated at £1000 per house (index linked). The affordable housing provision, to include a requirement that 35% of the total provision shall be affordable, 23% shall be social rented housing and 12% shall be shared ownership. Details of phasing of development to include, inter alia, provision of the pedestrian / cycle link within the first phase of development. A scheme of public art to be agreed for the site; and subject to the following conditions:- 1-3 Standard Outline 4 Maximum floor area for retail food development 1,329sqm 5 Maximum food area for retail non-food comparison 2,787sqm and remainder bulky goods 6 Footway/cycleway details as part of first reserved matters application 7 Noise mitigation measures to dwellings to include glazing 8 No Development within 8m of side walls of culvert 9 Flood Risk Assessment Mitigation Measures 10 Air Quality Assessment Mitigation Measures 11 Provision of Right Turn off Mill Street – timing to be agreed 12 Design Concept to be high quality and inclusive design, and shall have regard to the principles set out in the adopted SPD and shall include an element of Traditional 19 th Century Railway Housing 13 No further sub-division of retail units. 14 Contaminated Land 15 Sustainable Urban Drainage Systems as part of Reserved Matters 16 Incorporation of sustainable features as part of Reserved Matters 17 Waste Management Plan to be submitted 18 Signage to Town Centre and Heritage Centre 19 Scheme of CCTV to be submitted and agreed 20 Speed humps to car park 21 Boundary treatment 22 Scheme of management of open space - to include cutting 23 Scheme of lighting to be submitted and agreed 24 Scheme of street furniture to be submitted and agreed 25 Materials – to include surfacing materials It was requested that a letter be sent to regeneration to ask them to investigate further the possibility of opening up the closed archway under the railway line to improve connectivity from the railway station to the town centre for pedestrians and cyclists.
Word for word from the decision Cheshire East published for this meeting.
Source: moderngov.cheshireeast.gov.uk