Resolved
Granted 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. No development shall take place until the final design of the drainage scheme is completed and sent to the LPA for approval. The surface water drainage system will be based on the submitted Flood Risk Assessment and Drainage Strategy reference M03001-04_DG04 dated December 2020 prepared by McCloy Consulting. The scheme shall also include: 1. Limiting the surface water run-off rates to a maximum of 2l/s for all rainfall events up to and including the 1 in 100 year + climate change event with discharge into the Thames surface Water sewer. 2. Provide attenuation to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + climate change event. 3. Implement drainage strategy to include permeable paving and attenuation tank. 4. Detailed engineered drawings of the proposed SuDS features including their location, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling to ensure the scheme caters for all rainfall events up to and including the 1 in 100 year + 40% allowance for climate change event, with a supporting contributing area plan. 5. Demonstrate appropriate SuDS management and treatment for the entire site including the access road. To include exploration of source control measures and to include above ground features such as permeable paving. 6. Maintenance and management plan for the SuDS features Reason : To prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site in accordance with Policy CS31 of the Dacorum Borough Core Strategy (2013) and Paragraphs 163 and 165 of the National Planning Policy Framework (2019). 3. (a) The Local Planning Authority is of the opinion that the Preliminary Investigation Report submitted at the planning application stage (Document Reference: RSK Preliminary Risk Assessment 1921152-06(00) March 2020) indicates a reasonable likelihood of harmful contamination and so no development approved by this permission shall be commenced until a Site Investigation (Phase II environmental risk assessment) report has been submitted to and approved by the Local Planning Authority which includes: (i) A full identification of the location and concentration of all pollutants on this site and the presence of relevant receptors, and; (ii) The results from the application of an appropriate risk assessment methodology. (b) No development approved by this permission (other than that necessary for the discharge of this condition) shall be commenced until a Remediation Method Statement report; if required as a result of ... view the full minutes text for item 5b