Land Between Sandilands Road And Pearscroft Road, To The East Of Parsons Green Fulham, London, Sands End, 2025/02143/FR3
DecidedPlanning1 paper
AI summaryHammersmith and Fulham Planning Committee authorised the Director of Planning to grant permission for 38 new council built flats on land between Sandilands and Pearscroft Roads, with half affordable, subject to a legal agreement and 41 conditions.
Written from the decision and the officer reportPDF Pro
OutcomeApproved
MoneyNot stated
What happens nextComplete legal agreement, then grant permissionDeveloper must discharge numerous pre commencement and pre occupation conditions
Who it affectsNot stated
What was decided
The Committee resolved that the Director of Planning and Property be authorised to grant planning permission once a satisfactory legal document is completed and subject to the 41 conditions listed. Report P10, P11
The scheme will deliver 38 self contained residential flats (Class C3), of which 50 per cent (19 units) will be affordable, split 63 per cent social rent and 37 per cent shared ownership, with 10 per cent being M4(3) fully accessible. Report P7, 3.1, 3.2, P162, P163
The Director of Planning may, after consulting the Assistant Director of Legal Services and the Committee Chair, make minor changes to the legal terms or conditions, including varying, adding or deleting conditions. Report P11
Why
Officers judged the principle of development acceptable, the design of high quality, and impacts on heritage, neighbour amenity, transport, energy, ecology, flood risk, air quality and land contamination to be satisfactory subject to conditions and a legal agreement. Report P135, P217
The development will contribute to the borough's market and affordable housing stock and will re provide the open space on site. The pre application three phase consultation ended with 83 per cent of survey respondents supporting the proposals. Report P135
A previous 2016 permission for 33 dwellings on the site established the principle of redevelopment, and the Environment Agency, Metropolitan Police Designing Out Crime Officer and Thames Water raised no objections subject to conditions and advice. Report 2.2, 4.24, 4.25, 4.26
What happens next
A legal agreement must be completed before planning permission is granted, securing the affordable housing and other obligations. Report P10, 4.8
The development must begin within three years beginning with the date of the planning permission, in line with condition 1. Report P14
Pre commencement conditions include a biodiversity gain plan, drainage strategy, contamination assessment, air quality dust management plan, construction logistics plan, construction management plan, piling method statement and tree protection. Pre occupation conditions cover ventilation, energy, refuse, cycle storage, playspace, fire rated lifts, secure by design and roof terrace management. Report P24, P26, P29, P50, P79, P93, P97, P102, P107, P115, P120, P132
Options considered
Chosen: Grant planning permission subject to a legal agreement and conditions, as recommended by officers. Officers concluded the scheme complies with relevant national, London and local plan policies and the impacts are acceptable subject to conditions Report P9, P10, P135
Implications
Legal: A legal agreement is required to secure the affordable housing and other obligations; a piling method statement must be agreed with Thames Water before piling takes place. Report P10, P50
Equalities: 10 per cent of units will be M4(3) fully accessible; secure by design and inclusive design measures are required; the loss of the existing car park was assessed against the Public Sector Equality Duty and considered acceptable. Report 3.2, P107, 4.13
Climate: The development will use air source heat pumps for space heating and hot water, include solar panels, green and biodiverse roofs, sustainable drainage with attenuation limited to 2.5 litres per second, and deliver a minimum 10 per cent biodiversity net gain managed for 30 years. Report P7, P41, P43, P102, P120, P123, P127
Risk: Contamination conditions 19 to 24 require investigation, remediation, verification and possible long term monitoring because of potentially contaminative past land uses; the Fire Statement AF4249 Rev 02 must be carried out and the development retained in line with it. Report P68, P69, P118
Other: The site is within Flood Zone 3 and within the borough wide Air Quality Management Area, which drives the ventilation, air quality and drainage conditions. Report 1.7, P27, P32, P36, P39
Who and where
Future occupants of 38 new flats, of which 19 will be affordable (12 social rent, 7 shared ownership) and at least 4 will be M4(3) fully accessible Report 3.1, 3.2, P162, P163
Existing residents at Nos 16 to 38 Pearscroft Road whose rear gardens adjoin or abut the site Report 1.3, 1.5
Existing residents of Jepson House, the 18 storey tower to the southwest of the site Report 1.5
Users of the adjoining William Parnell Park and the surrounding Pearscroft Estate
Existing users of the garages, sheds, parking area and small grassed amenity strip on the site, which would be demolished or reconfigured Report 1.1, 1.3, P7
20.01.2026: Planning and Development Control Committee determined the application and resolved to authorise the Director of Planning to grant permission subject to a legal agreement and conditions Report P6
3 years beginning with the date of this planning permission: Latest date the development may commence under condition 1 Report P14
Plain English for the jargon
Regulation 3 application: A planning application made by the local authority itself as developer, here the London Borough of Hammersmith and Fulham.
Class C3: Use class for residential dwellings, as defined in the Town and Country Planning (Use Classes) Order.
M4(3): Building regulation standard for wheelchair accessible dwellings, used here for the 10 per cent of fully accessible units.
PTAL: Public Transport Accessibility Level, a 1 to 6 score used by Transport for London; the site is rated 3/4.
AQMA: Air Quality Management Area, declared across the borough, which drives the air quality and ventilation conditions.
AQDMP: Air Quality Dust Management Plan, required before demolition (Template B) and construction (Template D) under conditions 5 and 6.
SuDS: Sustainable Drainage Systems, required by the Drainage Strategy condition 32 with surface water discharge limited to 2.5 litres per second.
BNG / Biodiversity net gain: A measurable improvement in biodiversity of at least 10 per cent, secured through a biodiversity gain plan and Habitat Management and Monitoring Plan maintained for 30 years under conditions 39 and 40.
DSP / CLP / CMP: Delivery and Servicing Plan, Construction Logistics Plan and Construction Management Plan, each required by separate conditions before occupation or commencement.
DRP / IDRP: Design Review Panel and Inclusive Design Review Panel, which reviewed the scheme at pre application stage and whose comments influenced the submitted design.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item4
Resolved
RESOLVED That the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal document and subject to the conditions listed below. That the Director of Planning and Property, after consultation with the Assistant Director, Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal document or proposed conditions, which may include the variation, addition, or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Committee Date: 20.01.2026 Applicant: London Borough Of Hammersmith And Fulham C/O Agent 21 Soho Square London W1D 3QP
Description: Demolition of the existing garages and sheds, redevelopment of the site comprising the erection of part four, part five storey building to provide 38no self-contained residential flats (Class C3); installation of solar panels, green roofing and air source heat pumps with acoustic enclosure at roof level; removal of existing dropped kerb on Pearscroft Road, erection of cycle stores and associated external landscaping. Drg Nos:
Application Type: Full Regulation 3 - LBHF is Developer
Officer Recommendation:
1) That the Committee resolve that the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed below.
2) That the Committee resolve that the Director of Planning and Property, after consultation with the Assistant Director, Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition, or deletion of conditions, any such changes shall be within their discretion.
Conditions:
Time Limit
1) The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.
Condition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004). Approved Plans
2) The development hereby permitted shall be carried out in complete accordance with the following approved drawing numbers, other than where those details are altered pursuant to the conditions of this planning permission:
Landscape Ground Floor General Arrangement - PEA-PRP-ZZ-00-DG-L-02000 Rev P01 Landscape Roof Level General Arrangement PEA-PRP-ZZ-04-DG-L-02001 Rev P01 Landscape Roof Level General Arrangement Landscape Level 04 General Arrangement PEA-PRP-ZZ-04-DG-L-02011 Rev P01 Proposed Site Plan PEA-PRP-ZZ-ZZ-SK-A-08302 Rev P03 Proposed Ground Floor PEA-PRP-ZZ-00-DG-A-08000 Rev P03 Proposed First Floor PEA-PRP-ZZ-01-DG-A-08001 Rev P02 Proposed Second Floor PEA-PRP-ZZ-02-DG-A-08002 Rev P02 Proposed Third Floor PEA-PRP-ZZ-03-DG-A-08003 Rev P02 Proposed Fourth Floor PEA-PRP-ZZ-04-DG-A-08004 Rev P02 Proposed Roof Plan PEA-PRP-ZZ-RF-SK-A-08005 Rev P03 Proposed Elevations - SW and SE PEA-PRP-ZZ-ZZ-DG-A-08100 Rev P02 Proposed Elevations - NE an NW PEA-PRP-ZZ-ZZ-DG-A-08101 Rev P02 Proposed Sections PEA-PRP-ZZ-ZZ-DG-A-08220 Rev P03 Arboricultural Impact Assessment Ref:SHA 1710 Energy Strategy Ref:PEA-WP3-XX-XX-RP-J-6000 Fire Statement AF4249 Rev 02
To ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.
Materials
3) Prior to commencement of the relevant part of the works, details of the external facing materials (including manufacturer's specifications, photographs and/ or a physical sample) shall be submitted to, and approved in writing by the Council.
The development shall be carried out and completed in accordance with the approved details. The development shall be permanently retained in accordance with the approved details.
To ensure a satisfactory external appearance, in accordance with Policies DC1, DC2 and DC8 of the Local Plan (2018).
Trees
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.