London Borough of Hammersmith & Fulham
Planning and Development Control Committee, Tuesday 20 January 2026 at 7.00pm

Fulham Gas Works, Imperial Road London, Parsons Green and Sandford, 2025/00568/LBC

Decided Planning 1 paper

AI summaryHammersmith and Fulham committee authorises the Director of Planning and Property to grant listed building consent for restoration and reconfiguration works to the Grade II* Gasholder No. 2 at Fulham Gas Works, subject to conditions.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeDecidedSubject to conditions and Secretary of State direction
MoneyNot stated
What happens nextDirector to grant consentAfter no contrary direction from Secretary of State
Who it affectsFulham Gas Works, Imperial RoadGasholder No. 2 in Conservation Area Number 6

What was decided

The committee authorised the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the committee, to determine the application, grant listed building consent and make any changes to the conditions. Report P11, P12

Conditions cover a three year time limit, compliance with approved drawings, paint analysis before removal, and submission of material samples before erection. Report P14, P17, P25, P27

Why

Officers found the Grade II* Gasholder No. 2 is in very poor condition, its original use is redundant, and the proposals are the best available way to conserve its significance by salvaging and reinterpreting parts of the structure. Report P31

Officers considered the substantial harm from loss of the original form, and less than substantial harm to the settings of adjacent listed buildings, would be outweighed by the heritage, public realm and conservation benefits, including creation of a centrepiece for the public space within the wider development site. Report P31, P32

The works were judged acceptable under Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990, the National Planning Policy Framework, London Plan 2021 policies D3, D4, D5, D8 and HC1, and Local Plan 2018 policies DC1, DC2 and DC8. Report P33

What happens next

The Director of Planning and Property will determine the application and grant listed building consent once any direction from the Secretary of State is confirmed. Report P11

Before any paint is removed, an appropriately qualified party must analyse the existing paint finish, with details submitted to and approved in writing by the Local Planning Authority in consultation with Historic England. Report P25

Before erection, details of external materials including physical samples for replacement elements, masonry bases, infill panels and anti-bird fouling measures must be submitted to and approved by the Local Planning Authority in consultation with Historic England. Report P27

Options considered

  • Chosen: Grant listed building consent subject to conditions, as recommended by officers. Officers judged heritage and public benefits outweigh the harm from loss of the original gasholder form Report P10, P11, P31, P33
  • Rejected: Refuse listed building consent Report P31, P33

Implications

  • Other: Gasholder No. 2 will be recorded, dismantled in part, refurbished off site, and re-erected in a new configuration with salvaged and replacement components, integrated into the wider landscaped park with a water feature and seating. Report P7, P31
  • Legal: Listed building consent is granted under the Planning (Listed Buildings and Conservation Areas) Act 1990, with the three year commencement time limit required by Section 18(1)(a). Report P14, P15
  • Other: The works must be carried out in accordance with the listed approved drawings and supporting documents including the Design and Access Statement, Craddys refurbishment technical requirements, Alloy Fabweld detailed methodology, and Montagu Evans heritage statement. Report P17, P18, P19, P20, P21, P22, P23, P24
  • Risk: Decision remains subject to any contrary direction from the Secretary of State. Report P11

Who and where

  • Owners and future users of Fulham Gas Works, Imperial Road Report P2, P5
  • Adjacent listed buildings, including the Grade II Office building, Grade II Laboratory building and Grade II WW1 war memorial, whose settings were considered Report P32
  • Historic England, consulted on paint analysis and external materials Report P25, P27, P39
  • Greater London Industrial Archaeology Society, which submitted consultation comments Report P39
  • Hammersmith and Fulham Historic Buildings Group, which submitted consultation comments Report P39

Timeline

  • 28 February 2025: Application form received Report P36
  • 03.03.2025: Application validated Report P4
  • 14.04.2025: Comments received from Historic England Report P39
  • 15.04.2025: Comments received from Hammersmith and Fulham Historic Buildings Group Report P39
  • 16.04.2025: Comments received from Greater London Industrial Archaeology Society Report P39
  • 12.01.2026: Further comments received from Historic England Report P39
  • 20.01.2026: Planning and Development Control Committee considered the application Report P4

Plain English for the jargon

  • Listed Building Consent: Permission required under the Planning (Listed Buildings and Conservation Areas) Act 1990 to carry out works that affect a listed building's special interest.
  • Grade II* listed: A building of more than special interest, the middle tier in England's listed building grading system.
  • Gasholder: A large metal tank historically used to store gas, with a telescoping or fixed structure; here, the listed Gasholder No. 2 at Fulham Gas Works.
  • Section 16, Planning (Listed Buildings and Conservation Areas) Act 1990: The statutory provision used to assess whether listed building consent should be granted, having special regard to the desirability of preserving the building or its setting.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item8

Resolved

RESOLVED That subject to there being no contrary direction from the Secretary of State, that the Director of Planning and Property be authorised to determine the application and grant listed building consent subject to the conditions listed below (as amended or varied in accordance with 2 below). That the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee, be authorised to make any changes to the conditions listed below, which may include the amendment, addition or deletion of conditions, and any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting. Source: democracy.lbhf.gov.uk

Follow this further

Built from Hammersmith & Fulham's papers

What the report saysPro

Report to Planning and Development Control Committee

---------------------------------------------------------------------------------------------------------------- Ward: Parsons Green and Sandford

Site Address: Fulham Gas Works Imperial Road London

© Crown Copyright. All Rights Reserved. London Borough Hammersmith and Fulham LA100019223 (2013). For identification purposes only - do not scale. Reg. No: Case Officer: 2025/00568/LBC Catherine Slade

Date Valid: Conservation Area: 03.03.2025 Imperial Square & Gasworks Conservation Area - Number 6 Committee Date: 20.01.2026

Applicant: [name removed] 3 Riverlight Quay London SW11 8AY

Description: Works to Gasholder No.2 comprising:

(i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure; (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void; (iv) the incorporation of replacement components where the original components are degraded beyond repair; and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.

Drg Nos: See Condition No.2

Application Type: Listed Building Consent

Officer Recommendation:

(1) That the Committee resolve, subject to there being no contrary direction from the Secretary of State, that the Director of Planning and Property be authorised to determine the application and grant listed building consent subject to the conditions listed below (as amended or varied in accordance with 2 below).

(2) That the Committee resolve that the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee, be authorised to make any changes to the conditions listed below, which may include the amendment, addition or deletion of conditions, and any such changes shall be within their discretion. Conditions:

Time limit

1) The development hereby permitted shall not commence later than 3 years from the date of this decision.

Reason: Condition required to be imposed by Section 18(1) (a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended by section 91 of the Planning and Compensation Act 2004).

Drawings

2) The works hereby granted consent shall be carried out and completed in accordance with the following approved documents and drawings:

6449-PL 01 Rev 01 Site Location Plan 6449-PL 02 Rev 01 Existing Site Plan 6449-PL 03 Rev 01 Existing Ground Floor Plans Showing Demolitions 6449-PL 04 Rev 01 Existing Internal Floor Plan Showing Demolitions 6449-PL 05 Rev 01 Existing Ceiling Plan Showing Crown Structure 6449-PL 06 Rev 01 Existing Sections Through Gasholder 6449-PL 07 Rev 01 Existing Elevation 6449-PL 08 Rev 01 Existing Tripod Structure 6449-PL 09 Rev 01 Proposed Ground Floor Plan 6449-PL 10 Rev 01 Proposed Roof Structure Plan 6449-PL 11 Rev 01 Proposed Section Through Gasholder 6449-PL 12 Rev 01 Proposed Elevation 6449-PL 13 Rev 01 Proposed Tripod Structure Details 6449-PL 14 Rev 01 Proposed 1:20 Details

W502-CRA04-XX-ZZ-DR-S-005-0150 rev C01 – Gasholder No.2 General Arrangement – Overall (Existing) W502-CRA04-XX-ZZ-DR-S-005-0151 rev C01 – Gasholder No.2 Sections and Elevations (Existing)

W502-CRA04-SHE-3A-XX-DR-HE-0600-0501 rev P01 – Gasholder No.2 As Existing Sheet 1 W502-CRA04-SHE-3A-XX-DR-HE-0600-0502 rev P01 – Gasholder No.2 As Existing Sheet 2 W502-CRA04-3A-XX-DR-HE-0600-0507 rev C02 – Gasholder No.2 As Existing (October 2025) Sheet 1 W502-CRA04-3A-XX-DR-HE-0600-0508 rev C02 – Gasholder No.2 As Existing (October 2025) Sheet 2

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Fulham Gas Works, Imperial Road London, Parsons Green and Sandford, 2025/00568/LBCReport 453 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 8 attended
NS
Councillor Nikos SouslousChair, present
RM
Councillor Ross MeltonCommittee Member, present
NT
Councillor Nicole TrehyVice-Chair, present
PW
Councillor Patrick WalshCommittee Member, present
AP
Councillor Adrian Pascu-TulbureCommittee Member, present
CN
Councillor Callum NimmoCommittee Member, apologies
LP
Councillor Lydia PaynterCommittee Member, present
AK
Councillor Alex KarmelCommittee Member, present

On this subject at Hammersmith & Fulham

Search all
  1. Fulham Gas Works, Imperial Road London, Parsons Green and Sandford, 2025/00568/LBCThis decision
  2. Fulham Gas Works, Imperial Road London, Parsons Green and Sandford, 2025/00651/FULAgreed
  3. Fulham Gasworks, Imperial Road, London SW6, Sands End, 2024/00961/VARAgreed
  4. Fulham Gas Works, Imperial Road London, Parsons Green and Sandford, 2023/01146/FULDecided
  5. Fulham Gas Works, Imperial Road London, Parsons Green and Sandford, 2023/01147/LBCAgreed
  6. Land Bounded by Fulham Gasworks and Railway Line (Chelsea Creek), Imperial Road London SW6Approved

More from Hammersmith & Fulham Planning and Development Control Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Unit 1b, Waterside Tower, The Boulevard, London, SW6 2UB, Sands End, P/2026/01012/FULRESOLVED That the Director of Planning and Property be authorised to grant planning permission subject to the conditi... Decided Open
15 Sep 2026 40 Barclay Road, London, Hammersmith and Fulham, SW6 1EH, Walham Green, P/2026/01137/FULRESOLVED That the Director of Planning and Property be authorised to grant planning permission subject to the conditi... Decided Open
15 Sep 2026 Land North of Westfield London Shopping Centre, Ariel Way, London W12, Shepherd's Bush Green, 2025/03376/VARRESOLVED That subject to there being no contrary direction from the Mayor of London, the Director of Planning and Pro... Agreed Open
15 Sep 2026 Land At Albert Wharf and Swedish Wharf, Wandsworth Bridge Road, London SW6 2TY, Sands End, 2025/02448/VARRESOLVED That subject to there being no contrary direction from the Mayor for London, that the Director of Planning a... Agreed Open
15 Sep 2026 1 - 3 Sussex Place, London, W6 9EA, Hammersmith Broadway, P/2026/00633/FULRESOLVED That subject to there being no contrary direction from the Mayor for London, that the Director of Planning a... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies