495-497 Fulham Road, London SW6 1HH, Walham Green, 2025/01097/FUL
AgreedPlanning1 paper
AI summaryHammersmith and Fulham's planning committee resolved to grant retrospective permission for a single storey rear extension and boundary changes at 495-497 Fulham Road, subject to conditions and a Section 106 agreement including a £19,820 cycle hangar contribution.
Written from the decision and the officer reportPDF Pro
OutcomeAgreedAuthorise grant on Section 106 completion and conditions
Money£19,820 Section 106 contributionFor cycle hangar capital, maintenance and parking loss
What happens nextComplete Section 106 agreementDirector of Planning to finalise heads of terms
Who it affects495-497 Fulham Road siteMoore Park Conservation Area, Walham Green
What was decided
The committee authorised the Director of Planning and Property to grant planning permission on completion of a satisfactory legal agreement and subject to the conditions listed in the report. Report P10
The Director of Planning and Property was authorised, after consultation with the Assistant Director of Legal Services and the Committee Chair, to make minor changes to the legal agreement heads of terms or conditions. Report P11
The application is partial retrospective, seeking to retain a single storey rear extension, replacement metal gates, a 1.8m brick wall on Maxwell Road and a louvred aluminium bin store cover that are already substantially completed. Report P7, 1.10, 2.3
Why
Officers found the design of high quality and compatible with the character and appearance of the Moore Park Conservation Area and surrounding development. Report P29, 4.22
The proposals were considered acceptable in residential amenity terms, with conditions securing privacy, noise control and outlook for neighbours and future occupiers. Report P30, 5.13
Transport, highways and flood risk impacts were judged acceptable, with Section 106 contributions and conditions addressing cycle parking, refuse storage and flood mitigation. Report P31, P32, 6.12, 7.5
What happens next
Complete a Section 106 agreement covering highways works, a 6-space on-street cycle hangar on Maxwell Road, 10 years of maintenance and compensation for lost parking revenue, plus the Council's legal fees. Report 8.6, 8.8, P147, P148, P149, P150, P151
Implement the nine planning conditions, including flood mitigation measures, refuse and recycling storage, obscure fixed shut glazing on the west elevation windows and limits on rooftop use and external plant. Report P12, P17, P19, P20, P22, P23, P25, P26
Pay an estimated Mayoral CIL of approximately £1,075 (plus indexation); Local CIL does not apply. Report 8.1, 8.2
The money
£19,820 Combined Section 106 financial contribution covering the capital cost and installation of the on-street cycle hangar, exclusive use and maintenance for residents for 10 years, and compensation for lost on-street parking revenue over the same period Report 6.10
£6,500 Contribution towards the procurement and installation of one 6-space cycle hangar on Maxwell Road Report P148
£4,320 Contribution towards exclusive use and maintenance of the cycle hangar for residents for 10 years Report P149
£9,000 Contribution towards lost revenue from the reduction of on-street parking over 10 years Report P150
£1,075 Estimated Mayoral CIL liability, plus indexation Report 8.1
Options considered
Chosen: Officer recommendation to authorise grant of planning permission subject to legal agreement and conditions. Proposals complied with NPPF, London Plan and Local Plan on design, conservation, amenity, transport, flood risk and planning obligations Report P9, P10, P157, 9.4
Rejected: Refusal in response to objections about lack of permission, refuse provision, design, security, loss of cycle storage and privacy. Officers considered the works substantially completed, the design acceptable, cycle storage addressed by the on-street hangar and privacy protected by conditions on obscure fixed glazing Report P66, P67, 2.3, 5.9
Implications
Legal: A Section 106 legal agreement must be completed before planning permission is granted, with delegated authority for minor changes to heads of terms and conditions. Report P10, P11, 8.6, 8.7
Financial: The applicant must fund a 6-space cycle hangar on Maxwell Road, contribute to 10 years of maintenance, compensate for lost parking revenue, enter a Section 278 highways agreement and meet the Council's legal fees. Report 6.10, P147, P148, P149, P150, P151
Risk: A Flood Risk Assessment has been required by condition, and a noise condition is attached to protect future occupiers and neighbours. Report P23, P26, 7.4, 7.5
Equalities: Informatives set out construction hours, neighbour notification, dust, waste burning and noise and vibration controls to limit disruption during any remaining works. Report P36, P38, P40, P41, P43
20 January 2026: Planning and Development Control Committee date Report P5
Plain English for the jargon
PTAL: Public Transport Accessibility Level, a 0 to 6 scale used in London to score how well a site is served by public transport
FRA: Flood Risk Assessment, an evaluation of flooding sources and mitigation required for sites within flood risk zones
CIL: Community Infrastructure Levy, a charge applied to new development to fund infrastructure
Section 106: A legal agreement under section 106 of the Town and Country Planning Act 1990 used to secure planning obligations
Prior approval: A streamlined process under permitted development rights where a council approves specified details rather than the principle of development
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item6
Resolved
RESOLVED That the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed in the report.. That the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
For identification purposes only - do not scale. Reg. No: Case Officer: 2025/01097/FUL Christopher May
Date valid: Conservation Area: 25.04.2025 Moore Park Conservation Area Committee Date: 20.01.2026
Applicant: Poveda Woodhill Ltd 10-12 East Parade Leeds West Yorkshire LS1 2BH
Description: Partial retrospective application for the retention of: a single storey rear extension and reduction in size of 1no window at ground floor level to southern elevation of the main building; replacement of existing timber gates and timber fencing with new metal gates, brick pier and 1.8m high brick wall facing Maxwell Road (east elevation) and the installation of a louvred aluminum bin store cover. Installation of an aluminum roof cover to the bin store.
Application type: Full Detailed Planning Application
Officer Recommendation:
(1) That the Committee resolve that the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed below.
(2) That the Committee resolve that the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Conditions: 1) Time Limit Notwithstanding the time limits given to implement planning permission as prescribed by Sections 91 and 92 of the Town and Country Planning Act 1990 (as amended), this permission in so far as it relates to the development (being granted under section 73A of the Act in respect of development already carried out) shall have effect from the date of this decision notice.
To ensure clarification of the works commenced in accordance with Section 73A of Chapter 8, Part III, of the Town and Country Planning Act 1990 (as amended).
2) Approved Plans/Drawings The development hereby permitted is as set out within the following approved plans and drawings:
202 Rev.E; Flood Risk Assessment received 23 April 2025.
To ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans in accordance with Policies DC1, DC2 and DC8 of the Local Plan (2018).
3) Refuse and Recycling Prior to occupation of the development hereby approved the refuse and recycling bin storage shall be implemented in accordance with the approved details as shown on drawing no. 202 Rev.E and shall thereafter be permanently retained.
To ensure adequate refuse and recycling facilities and to ensure that the use does not give rise to smell nuisance and to prevent harm to the character and appearance of the Conservation Area arising from the appearance of accumulated rubbish, in accordance with Policies DC8, CC6 and CC7 of the Local Plan 2018.
4) Opaque Windows to be Fixed Shut The development hereby permitted shall not be occupied until the ground floor windows in the west elevation (as shown on drawing no. 202 Rev.E) have been installed with mechanisms to ensure that they are non-opening. The obscure glazing shall be retained up to a height of 1.7m above the finished floor level to a minimum level of obscurity equivalent to Pilkington Texture Glass Level 3. Thereafter, the windows shall be retained in the form approved. To ensure that the glazing would not result in overlooking and any subsequent loss of privacy, in accordance with Policy HO11 and DC4 of the Local Plan (2018) and Key Principle HS7 of the Planning Guidance Supplementary Planning Document (2018).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.