CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
River Hamble Harbour Management Committee, Friday 8 June 2018 at 10.00am

Harbour Works Consent Application – Brooklands Quay Mooring Buoy Relocation

Approved Committee 4 papers

River Hamble Harbour Management Committee approved this item on Friday 8 June 2018. Below is the council's own wording, with the papers it was decided on.

Item50

Resolved

That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. That the proposal is to be built in accordance with the details, plans and method submitted as set out in Appendix 1a and Appendix 1b, with the exception that the proposed mooring location is to be moved inshore so that it is located outside of the Solent Maritime Special Area of Conservation. b. That the final design of the mooring arrangement, location and the method statement for installation are to be submitted to and approved by the Harbour Master in advance of construction. c. That the maximum length overall of the vessel to be moored is to be 13 metres. d. That the existing mooring buoys located on the intertidal area within the creek are to be removed prior to installation of the new buoys. e. That all equipment, temporary structures, waste and/or debris associated with the licensed activities is to be removed upon completion of the licensed activities. f. That Harbour Dues are to be payable on any vessel occupying the mooring. g. That the development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Management Committee

HAMPSHIRE COUNTY COUNCIL

Report

Committee River Hamble Harbour Management Committee

Date: 8 June 2018

Title: Harbour Works Consent Application – Brooklands Quay Mooring Buoy Relocation

Report From: Director of Culture, Communities and Business Services

Contact name: Jason Scott or Alison Fowler

[email protected] Tel: 01489 576387 Email: [email protected]

1. Recommendation 1.1. That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method submitted as set out in Appendix 1a and Appendix 1b, with the exception that the proposed mooring location is to be moved inshore so that it is located outside of the Solent Maritime Special Area of Conservation. b. The final design of the mooring arrangement, location and the method statement for installation are to be submitted to and approved by the Harbour Master in advance of construction. c. The maximum length overall of the vessel to be moored is to be 13 metres. d. The existing mooring buoys located on the intertidal area within the creek are to be removed prior to installation of the new buoys. e. All equipment, temporary structures, waste and/or debris associated with the licensed activities are to be removed upon completion of the licensed activities. f. Harbour Dues to be payable on any vessel occupying the mooring. g. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.

2. Summary 2.1. This report sets out an application for Harbour Works Consent (HWC) made by Marina Projects Limited on behalf of its client, [name removed], for the relocation of private mooring buoys at Brooklands Quay, Sarisbury Green, SO31 7EF (SU 493 088). 3. Background 3.1. Brooklands Quay, a private waterside property, has four mooring buoys sited within its creek that are used to securely moor private vessels. These are tidal moorings only accessible during high water periods, with vessels taking the ground and drying out at all other states of tide. The property owner wishes to relocate two of these mooring buoys from the current position and site them adjacent to the private slipway and navigation pile. This will increase the useable access window. The buoys will remain within the land ownership boundary of the property. The remaining two buoys in the creek will be removed along with associated ground tackle.

4. Project Description 4.1. The following plans and documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1):  Appendix 1a – File Note MP282_FN_01  Appendix 1b – Drawing No. MP282-01-P-200

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix 1aAppendix 1a 374 KB Download
PDF
Appendix 1bAppendix 1b 1.6 MB Download
PDF
Appendix 2Appendix 2 144 KB Download
PDF
Harbour Works Consent Application: Brooklands Quay Mooring Buoy RelocationReport 106 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 24 attended
SW
Councillor Seán WoodwardChairman, present
RH
Councillor Roger HuxstepVice-Chairman, present
FB
Councillor Fred BirkettCommittee Member, apologies
MC
Councillor Mark CooperCommittee Member, absent
RC
Councillor Rod CooperCommittee Member, present
TC
Councillor Tonia CraigCommittee Member, present
PH
Councillor Pal HayreCommittee Member, present
RK
Councillor Rupert KyrleCommittee Member, present
SP
Councillor Stephen PhilpottCommittee Member, present
LQ
Councillor Lance QuantrillCommittee Member, present
AG
Councillor Andrew GibsonConservative Deputy
RB
Rupert Boissier River Hamble Boatyard and Marina Operators AssociationCo-opted Member, present

All 24 on the meeting page

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application – Brooklands Quay Mooring Buoy RelocationThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Management Committee

All decisions
MeetingDecisionOutcome
18 Sep 2026 Marine Director and Harbour Master's Report and Current IssuesThe River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open
18 Sep 2026 Environmental UpdateThe River Hamble Harbour Management Committee noted and supported the remainder of this report. Noted Open
18 Sep 2026 Annual Review of Business PlanThe River Hamble Harbour Management Committee recommended that the River Hamble Harbour Board supports the contents o... Decided Open
18 Sep 2026 Forward Plan for Future MeetingsThe River Hamble Harbour Management Committee noted the report. Noted Open
12 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED The River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies