River Hamble Harbour Management Committee approved this item on Friday 8 June 2018. Below is the council's own wording, with the papers it was decided on.
That the River Hamble Harbour Management Committee recommends to River Hamble Harbour Board that it grants Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. That the proposal to the sea wall be built in accordance with the details, plans and method set out in Appendix 1a and Appendix 1b. b. That the method statement is to be submitted to and approved by the Harbour Master in advance of construction. c. That the applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. That all reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d. That all equipment, temporary structures, waste and/or debris associated with the activities is to be removed upon completion of the works. e. That the development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting.Source: democracy.hants.gov.uk
Report to River Hamble Harbour Management Committee
MP269.7-FN-03 Swanwick Shore Road Car Park
MARINA PROJECTS LTD: FILE NOTE Premier Marinas Ltd Swanwick Shore Road Car Park Refurbishment Revision 01 – 05/04/2018
1. INTRODUCTION
Premier Marinas Ltd are responsible for the upkeep and maintenance of the Swanwick Shore Road Car Park, found to the East of Swanwick Marina and as shown in Figure 1.
Figure 1 - Swanwick Shore Road Car Park
The car park is of relatively simple layout, comprising marked spaced on a tarmac area, with an informal tender storage area at the Western End. The car park plays an important part in servicing use of the adjacent slipway that is popular for a number of different river users.
The frontage of the car park has, to all intents and purposes failed through age, where the frontage no longer retains or protects the material from the action of the tide – fine material is lost through the wall/revetment with significant voids appearing underneath the tarmac.
Premier Marinas therefore propose to address the car park frontage and complete a low- key refresh of the car park area to make it more appealing and in keeping with the
1 MP269.7-FN-03 Swanwick Shore Road Car Park
surroundings. Better regulation of the parking spaces and dinghy/tender storage will improve usability.
2. PROPOSED WORKS
Premier Marinas propose to conduct work on the car park in accordance with the drawing attached in support of this application, Hamill Davies Drawing 14-2310-102.
Within this drawing there are three main areas of work;
▪ Removal of all of the existing frontage structure and its replacement with gabions (wired cages), filled will inert clean material (such as Maccarferri stone – Figure 2) and backed by a geotextile membrane to protect the car park from tidal scour. Within the top of the gabions a continuous bench rail set on square posts cut from reclaimed timber piles will be installed. During the excavation of the existing frontage and placement of the gabions the voids will be backfilled with type 6N granular material which is retained by the membrane. ▪ Once the gabions are filled and the voids backfilled the existing surface will be scarified and resurfaced with a tarmac overlay, with lines repainted. It is proposed that 1x disabled space is marked within the hatched access area. ▪ The dinghy park area will be tidied up and block paving installed to provide a formalised dingy storage area. This dinghy park will be surrounded by key clamp low level railing to which tenders can be locked. It is proposed that the existing anchor feature is retained and placed on the boundary of car park and dinghy area as an interest feature.
3. METHODOLOGY
Whilst detailed methodology will be confirmed once a contractor is appointed post consenting Premier Marinas will ensure that all works will be conducted from the land without the need to access or utilise the foreshore for access by mechanical plant. The existing frontage will require excavation, with debris removed from site for disposal or recycling as appropriate. A levelled grade will be created through a thin layer of graded stone on which to commence the new wall construction.
Gabions will arrive empty, before they are placed, wired together and then filled appropriately with material following best practice guidelines and manufacturer’s instructions. The void behind the wall be filled and material compacted in layers as the wall is increased in height.
2 MP269.7-FN-03 Swanwick Shore Road Car Park
As the gabions are filled the reclaimed timber posts can be set into them, after which the bench rail can be secured. With the gabions and geotextile in place the excavated area behind will be backfilled to meet existing material before the surface is scarified and new tarmac placed between the new edging stones.
It is proposed that works will take place during standard 8am – 8pm hours, with an estimated duration of 2 weeks.
4. IMPACTS
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow River Hamble Harbour Management Committee at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.