That the River Hamble Harbour Board approves Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: That the proposal is to be built in accordance with the details, plans and method submitted as set out in Appendix 1a and Appendix 1b, with the exception that the proposed mooring location is to be moved inshore so that it is located outside of the Solent Maritime Special Area of Conservation. That the final design of the mooring arrangement, location and the method statement for installation are to be submitted to and approved by the Harbour Master in advance of construction. That the maximum length overall of the vessel to be moored is to be 13 metres. That the existing mooring buoys located on the intertidal area within the creek are to be removed prior to installation of the new buoys. That all equipment, temporary structures, waste and/or debris associated with the licensed activities is to be removed upon completion of the licensed activities. That Harbour Dues are to be payable on any vessel occupying the mooring. That the development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting.Source: democracy.hants.gov.uk
1. Recommendation 1.1. That the River Hamble Harbour Board approve Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method submitted as set out in Appendix 1a and Appendix 1b, with the exception that the proposed mooring location is to be moved inshore so that it is located outside of the Solent Maritime Special Area of Conservation. b. The final design of the mooring arrangement, location and the method statement for installation are to be submitted to and approved by the Harbour Master in advance of construction. c. The maximum length overall of the vessel to be moored is to be 13 metres. d. The existing mooring buoys located on the intertidal area within the creek are to be removed prior to installation of the new buoys. e. All equipment, temporary structures, waste and/or debris associated with the licensed activities are to be removed upon completion of the licensed activities. f. Harbour Dues to be payable on any vessel occupying the mooring. g. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.
2. Summary 2.1. This report sets out an application for Harbour Works Consent (HWC) made by Marina Projects Limited on behalf of its client, [name removed], for the relocation of private mooring buoys at Brooklands Quay, Sarisbury Green, SO31 7EF (SU 493 088). 3. Background 3.1. Brooklands Quay, a private waterside property, has four mooring buoys sited within its creek that are used to securely moor private vessels. These are tidal moorings only accessible during high water periods, with vessels taking the ground and drying out at all other states of tide. The property owner wishes to relocate two of these mooring buoys from the current position and site them adjacent to the private slipway and navigation pile. This will increase the useable access window. The buoys will remain within the land ownership boundary of the property. The remaining two buoys in the creek will be removed along with associated ground tackle.
4. Project Description 4.1. The following plans and documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1): Appendix 1a – File Note MP282_FN_01 Appendix 1b – Drawing No. MP282-01-P-200
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.