CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
River Hamble Harbour Board, Friday 13 July 2018 at 10.00am

Harbour Works Consent Application – Swanwick Shore Road Car Park River Wall Replacement

Approved Committee 4 papers

River Hamble Harbour Board approved this item on Friday 13 July 2018. Below is the council's own wording, with the papers it was decided on.

Item56

Resolved

That the River Hamble Harbour Board approves Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: That the proposal to the sea wall be built in accordance with the details, plans and method set out in Appendix 1a and Appendix 1b. That the method statement is to be submitted to and approved by the Harbour Master in advance of construction. That the applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. That all reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. That all equipment, temporary structures, waste and/or debris associated with the activities is to be removed upon completion of the works. That the development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

HAMPSHIRE COUNTY COUNCIL

Report

Committee River Hamble Harbour Board

Date: 13 July 2018

Title: Harbour Works Consent Application - Replacement of River Wall at Swanwick Shore Road Car Park

Report From: Director of Culture, Communities and Business Services

Contact name: Jason Scott or Alison Fowler

[email protected] Tel: 01489 576387 Email: [email protected]

1. Recommendations 1.1. That the River Hamble Harbour Board approves Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. The proposal to the sea wall is to be built in accordance with the details, plans and method set out in Appendix 1a and Appendix 1b. b. The method statement is to be submitted to and approved by the Harbour Master in advance of construction. c. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d. All equipment, temporary structures, waste and/or debris associated with the activities are to be removed upon completion of the works. e. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.

2. Summary 2.1. This report sets out an application for Harbour Works Consent (HWC) made by Marina Projects Limited on behalf of its client Premier Marinas Limited for the replacement of the river wall at Swanwick Shore Road car park, SO31 7EF (SU495 092).

3. Background 3.1. This application to replace the sea wall forms part of a wider proposal to replace and rectify the failing wall frontage, resurface the car park and improve the dinghy tender storage area in a manner that is yet to be confirmed. It should be noted that the River Hamble Harbour Authority’s (RHHA) jurisdiction extends only to high water and so elements of the proposal behind the sea wall (i.e. car park and tender storage) are not subject to consent from RHHA.

4. Project Description 4.1. The following plans and documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1):  Appendix 1a - File Note MP269.7-FN-03.  Appendix 1b - Drawing Number 14-2310-102 vP8.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix 1aAppendix 1a 234 KB Download
PDF
Appendix 1bAppendix 1b 324 KB Download
PDF
Appendix 2Appendix 2 182 KB Download
PDF
Harbour Works Consent Application: Swanwick Shore Road Car Park River Wall ReplacementReport 106 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 9 attended
KE
Councillor Keith EvansChairman, present
PL
Councillor Peter LathamVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, present
GH
Councillor Geoffrey HockleyConservative Deputy
RP
Councillor Roger PriceLiberal Democrats Deputy
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, present
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, apologies
CM
Chris Moody Marine Industry RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application – Swanwick Shore Road Car Park River Wall ReplacementThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies